FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.

Slides:



Advertisements
Similar presentations
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Advertisements

Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
John Osborne GS/SE March 2013
Yung Loo FCC: GIS & Tunnelling Update.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
TOT-FCC: Tunnel Optimisation Tool for the Future Circular Collider Introduction and lessons learnt C. Cook, J. Osborne, P. Lebrun, Y. Robert, M. Jones,
Geotechnical & Civil Engineering Studies Future Circular Colliders (FCC)
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
General Infrastructures Services Department Civil Engineering planning for LSS4 Option, presented at review workshop 30/7/ months Planning and Resources:
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
FCC-hh MDI 5 th Meeting Friday 13 th March 2015 Civil Engineering Layouts for Experimental Caverns – First Draft Charlie Cook (GS), John Osborne (GS)
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
Review of FCC tunnel footprint & implementation Introduction & scope Philippe Lebrun Review of FCC tunnel footprint & implementation CERN, 11 June 2015.
Matt Sykes Andy Kervell Yung Loo Heidi Clough Craig Sturzaker ARUP: Update on GIS Model and tunnel options under lake.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
FCC Underground Infrastructure
Civil Engineering for FCC-eh and LHeC
LHeC Coordination Meeting, 9 June 2017
Civil Engineering update - alignment configuration
FCC Civil Engineering Optimisation and Design Development
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Civil Engineering Update
LBNF CAD models, Drawings and Component list
CLIC Civil Engineering Update
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Marco Oriunno (SLAC), March 12, 2014 MDI WG
CLIC Civil Engineering & Infrastructure
FCC Civil Engineering John Osborne & Jo Stanyard (SMB - Site Engineering - FAS Section) FCC week outline 10th May 2017.
Acknowledgements to all FCC study teams
Experimental hall design in Japanese site
Selected comments and recommendations of the International Advisory Committee - Comments/replies from IOWG Resulting actions V. Mertens IOWG
CLIC / ILC Collaboration for CFS works
Interaction Region Alternative Layouts
5th FCC Infrastructure & Operation meeting
FCC Civil Engineering update
Latest ILC tunnel cross section May 2017
FCC-ee MDI Civil Engineering update
FCC Tunnel and Shaft Cross Sections
Civil Engineering for FCC-eh IR
COOLING & VENTILATION INFRASTRUCTURE
CLIC Civil Engineering Update
Infrastructure and Operation Summary
Tom Lackowski Revised 10/12/2011
Extract from today’s talk given to DCB
RDR Baseline Layouts for Interaction Region
Workshop on fire protection for physics research facilities
FCC Week 2019 Civil Engineering Summary
White Flint North Entrance Feasibility Study
Presentation transcript:

FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017

Contents Alignment position update Cross-section and design updates Additional schedule constraints FCC-ee machine requirements FCC-eh machine requirements Surface updates Interaction point layout Geological investigation planning Spoil schedule Elliptical v circular shaft Shaft F options comparison Inclined access tunnels Mobile platform for installation of services Junction cavern evaluation 39th I&O meeting – 19-07-17

Alignment update 39th I&O meeting – 19-07-17 An order has already been placed with GADZ to provide more geotechnical information on areas where the tunnel passes through the moraines. 39th I&O meeting – 19-07-17

Cross-section and design updates Non-exhaustive list: Tunnel cross-section updates Beam dump design update Alcove number refined Partitions IR update 39th I&O meeting – 19-07-17

Phase 3 - considerations Additional schedule constraints Take FCC and SPS operational schedules into consideration Will an additional shaft near LHC connection be required for spoil removal? FCC-ee machine requirements Lattice file comparison under consideration, to be developed with integration FCC-eh machine requirements Under consideration at point L Drawings and specification under development Surface updates Some surface site updates pending, to be developed by integration Access to the sites to be evaluated and cost and schedule of any additional structures (roads, bridges, tunnels) to be included. Interaction point layout Consider variation where spacing between caverns is 10 m. FCC experimental point. 39th I&O meeting – 19-07-17

Phase 3 - considerations Geological investigation planning Next step for the project will be geological investigations Particularly interested in non-destructive testing Initial step is a plan with a cost and schedule estimate for investigations Spoil schedule A schedule is required for the quantity, type and shaft location of spoil produced during excavation. 39th I&O meeting – 19-07-17

Phase 3 - considerations Elliptical v circular shaft Which is more efficient in terms of cost and schedule for the 18 m magnet lowering shafts. Shaft F options comparison Shaft F is unacceptably deep, a reasonable alternative to a 12 m diameter vertical shaft is required Inclined access tunnels Positions still under assessment Work closely with the project schedule Two variations included in the specification Issue: Exceptionally deep shaft at point F Possible Solutions: Remove shaft and have a bypass tunnel Replace with a shaft of a smaller diameter Replace with an inclined access tunnel 39th I&O meeting – 19-07-17

Phase 3 - considerations Mobile platform for installation of services in shafts Examples from previous projects along with cost estimates. Junction cavern evaluation Dimensions of junction caverns to be revaluated to produce more streamlines baseline design. 39th I&O meeting – 19-07-17

Required for each draft Timeline for Phase 3 Study to be continued with ILF Consulting: First draft November 2017 Second draft January 2018 Final report March 2018   Required for each draft Report chapter Cost Estimate Schedule Estimate Alignment position update Yes Baseline Cross-section and design updates Additional schedule constraints FCC-ee machine requirements x FCC-eh machine requirements Surface updates Interaction point layout Geological investigation planning Spoil schedule N/A Elliptical v circular shaft Inclined access tunnels Shaft F options comparison Mobile Platform for installation of services Junction cavern evaluation 39th I&O meeting – 19-07-17