Methods and Methodology within the Public Projects Mgr. Bc

Slides:



Advertisements
Similar presentations
Technical skills and competences
Advertisements

Work Breakdown Structures
Project Mangement Chapter 4 Framework for Project Management.
Systems Analysis and Design 9th Edition
What is a project? Project Management Institute definition
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Introduction to Project Management. What is a Project? “A planned undertaking of related activities to reach an objective that has a beginning and an.
Chapter 5 Planning. 222 Learning Objectives  Clearly define the project objective  Develop a work breakdown structure  Develop a network diagram 
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Project Management Fundamentals Project Organization and Integration
What is Business Analysis Planning & Monitoring?
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
Project Monitoring and Control by Hateem Ghafoor, PMP.
CPAN 410 & GAME 410 Project Management
INTRODUCTION TO PROJECT MANAGEMENT. WHAT IS A PROJECT? “A planned undertaking of related activities to reach an objective that has a beginning and an.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Lean Project Management
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Copyright 2009  Describe the five project management (PM) process groups, the typical level of activity for each, and the interactions among them  Understand.
Software Project Management By Deepika Chaudhary.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
© 2008 Prentice Hall2-1 Introduction to Project Management Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
The Project Management Life Cycle. What is the Project Management Life Cycle? A project life cycle simply includes the necessary steps, from beginning.
PLUG IT IN 6 Project Management. 1.Project Management for Information Systems Projects 2.The Project Management Process 3.The Project Management Body.
Lecture # 17 PRM 702 Project Risk Management Ghazala Amin
© 2008 Prentice Hall1-1 Introduction to Project Management Chapter 1 Introduction Information Systems Project Management: A Process and Team Approach,
© 2008 Prentice Hall1-1 Introduction to Project Management Chapter 1 Introduction Information Systems Project Management: A Process and Team Approach,
Introduction to Project Management.  Explain what a project is?  Describe project management.  Understand project management framework.  Discuss the.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
These slides are designed for presentation purpose only © Copyright SAIsej Consultancy Services (P) Ltd Why ??? Project Management.
Event Project Management By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
HCIS 410 Read, Lead, Succeed/Uophelpdotcom For more course tutorials visit
Basics of Project Management Nadia CircelliJune 1, 2016.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
Bus 1040 Project Management Week 6,. Agenda Housekeeping Marking for the past 6 weeks. WBS Quiz review Decision Matrix Work through the book case we will.
MANAGEMENT of INFORMATION SECURITY, Fifth Edition.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Chapter 11 Project Management.
Popular Frameworks and Methodologies
Project Management MGT 30725
Project Management Systems
Implementation Plan I want to plan a project
Project Management PTM721S
Project Management Techniques
Chapter 17 Project Management McGraw-Hill/Irwin
Project Management 1040 Bus Week 6. June9-13, Agenda
Fundamentals of Information Systems, Sixth Edition
Popular Frameworks and Methodologies
Project Management Institute
Identify the Risk of Not Doing BA
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case Study
Chapter 3: The Project Management Process Groups: A Case Study
System analysis and design
CHAPTER 6 PROJECT TIME MANAGEMENT
Popular Frameworks and Methodologies
Chapter 5 Planning
Introduction to Project Management Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process and Team Approach, 1e.
Project Management Process Groups
CEM 510 Construction Planning & Scheduling Dr Almohawis
Introduction to Systems Analysis and Design Stefano Moshi Memorial University College System Analysis & Design BIT
EAST AFRICAN MARKET DEMAND FOR PROJECT MANAGERS - CONSTRUCTION
Project Management Chapter 11.
Importance of Project Schedules
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

Methods and Methodology within the Public Projects Mgr. Bc Methods and Methodology within the Public Projects Mgr. Bc. David Póč Department of Public Economics

Support of the project management Project management could be supported by the different types of tools/instruments including the software ones. At the moment variety of tools/instruments could be found based on the requirements of the project – functions, types and chosen methods (seminar – Gantt Charts). Project management methods are describing the very best practices that should be used for the project management either in the particular project phases or throughout the whole project cycle. These methods do consist from the multiple procedures that are defining for example the sequences of steps that should be taken for the successful project management. Among the common methods are listed: Methodology PRINCE2 ISO 10006:2004 norm IPMA (International Project Management Association) PMBOK® (Project Management Body of Knowledge) od PMI

Description of selected methods (1) When the specific method/instrument/tool should be used, the project team should make a decision if the selected one could be helpful for the project itself. Usually the decision is based on the three main factors: On the organization where the project is taking place (type, culture, size, management etc.) On the project specifications (content of the project, budget, priorities, risks, connections within the portfolio etc.) On the project manager personality and experience Necessity to asses if the selected procedure is „eligible“ for the given project – sometimes the project managers have a tendency to „overuse“ the methods/instruments and the

Description of selected methods (2) Network Analysis – group of special analytical methods that are being used, when there is a necessity to analyze or optimize the network within the interconnected elements of the project. There is usually to possibility to calculate the so-called critical paths among the elements (like CPM, PERT). CPM – Critical Path Methods, used from 1954. Deterministic application of the network graphs, could be used to track down resources of all kinds (for example time units). PERT - Program Evaluation and Rewiev Technique, used since 1957. This method is using the direct connection between beginning and the end of the activity and is drawn by the arrow diagram. It is also the deterministic application of network graphs, probability assessment. GERT – Graphic Evaluation and Review Technique, since 1966, enable to monitor the project as the whole unit including the estimation of the particular activities evaluation. Not so used.

Description of selected methods (3) Methods/Techniques MBO Techniques – Management by Objectives, designed by Peter F. Drucker in the 50ties, very popular in 60ties and 70ties. This technique is based on the assumption that managers are loosing focus on the project targets/goals, they do focus on the particular activity and the global target is being forgotten. Technique is based on the selection and mutual correlation between target and given way how to asses the successful rate. Ishikawa diagrams technique – based on the principal rule – every consequence has its cause or combination of causes. Purpose of the technique is to find a solution to the problem where all the causes are drawn into the diagram. K. Ishikawa used these diagrams to track down the differences in the quality management area. Diagrams are designed to analyze relevant correlations, mechanisms to track down the costs, identify critical factors and thus set the correct hierarchy of the problems/issues and their solutions. Helpful for complex and bigger projects.

Comparison of the PMI (PMP) and PRINCE2 At the moment the most recognized certification within the project management PRINCE – created in 1989 in Great Britain – response to the needs of the public/governmental IT projects (high failure rate), rebuild in 1996 as a PRINCE2. PMI – created in 1969 in US – rapidly growing industry and necessity to have common management standards. Leading in 1980ties to the first efforts to produce the so called standards – in 1996 – first Project Managament Body of Knowledge (BoK). Basic comparison: PRINCE 2 – developed as a project management method X PMI – through BoK (standards) developed for an industry

Comparison of the PMI (PMP) and PRINCE2 (2) What do they have in common Both are focused on the project management in any environment, culture, project topics + complexity Definition of procedures, roles and steps Dividing projects in smaller units Management of changes + risks + control of the quality Differences PMI recognizes the project cycle and each cycle is defined by the specific processes linked to BoK X PRINCE 2 defines seven processes that do characterize the project cycle PMI defines only few basic roles – project manager, sponsor, stakeholders X PRINCE 2 defines – three levels of project management and eight roles (Executive, Senior user, Project manager etc.) PMI concentrates on the works and activities and relevant is the WBS (Working Breakdown Structure) X PRINCE 2 concentrates on products and relevant in the PBS (Product Breakdown Structure) PMI does use a lot of calculations (like values etc.) X PRINCE 2 does not require math – concentration on processes

Thanks a lot for your attention! Used sources: PMI Methodology Do you know the difference between PMI (PMP) and PRINCE2? – by PRINCE2, PMI, Scrum, Agile training