LHCb UT & Velo CO2 COOLING

Slides:



Advertisements
Similar presentations
How to use the VLE A step by step guide.
Advertisements

© 2006 Swagelok Company. Swagelok Medium-Pressure Tube Fittings Pressures up to psig (1034 bar)
© 2005 Swagelok Company, The Swagelok ® 40G Series One-Piece Instrumentation Ball Valves.
© 2003 Swagelok Company Ultrahigh-Purity Gas Filters SCF Series.
Transfer Review Briefings
© 2000 Swagelok Company DP Series Springless Diaphragm Valves.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
P. Tropea for the PH-DT CO 2 team CO 2 CERN 11 March 2015 CO 2 cooling activities in PH-DT.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
CONTROLS AND AUTOMATION
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 31/8/2015 Simone Coelli For the Milano UT group INFN Milano 1 Istituto.
Modifying a Paintball Regulator for BBIQ. The Necessary Stuff Sourcing Parts and Supplies is an Important Engineering Skill.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
TRACI V3 Status & Delivery Plans UPDATE Paolo Petagna LHCb CO2 cooling meeting Apr 15 th, 2015.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
Nikhef Amsterdam Mechanical- Technology Short update on CO 2 cooling activities at Nikhef 13 October 2010.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
AIDA Traci commissioning LHCb – CO 2 cooling meeting 18 March 2015 Kamil Wojdyla, Lukasz Banasik, Nicola Spadavecchia, Tomasz Kucharski, Piotr Dziurdzia,
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Isabelle Laugier, AT/VAC/ICM Section May 6 th 2008 LHC Vacuum Control system.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
Manifolds optimization and pressure drops in the ATLAS TRT CO 2 cooling system Joël Grognuz.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
Ken Wyllie, CERN LHCb electronics, 8th October LHCb Upgrade Electronics Meetings in 2015 (Thursday, 2pm): 3 rd December
L. M. Pant1 RE Workshop, 19/11/12 Validation of RE4 Cu cooling systems for mass production Validation of RE4 Cu cooling systems for mass production L.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
H.-G. Moser, PXD, July 12, 2016 IBBelle: Status & Plans 1 2-phase CO 2 cooling system for PXD and SVD Minimal temperature: - 40 o C (intended: -30 o C)
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
DT-LHCb coordination meeting 18 April 2016
Feedback on transfer line sizing and flow calculations for UT
Status of the DSP/ASPOC EM
IBBelle: Status & Plans
A PRELIMINARY THERMAL STUDY FOR L3 CGEM BOARD
ATLAS ITk Baby-DEMO update
Filter drilling status
The European DHCAL status
FEE COOLING UPDATE CGEM Workshop - IHEP - June 13th 2017
VELO Thermal Control System
Teleconference ACS – FREIA 17th October 2017
Antti Onnela CERN – EP – Detector Technologies group
Flexible lines assembly
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
MAUVE CO2 cooling review
update on UT cooling system
Update on Junction Box Design
Update on Junction Box Design
Beam Wire Scanners (PS prototype and LIU series)
Pixel CO2 Cooling Status
'. \s\s I. '.. '... · \ \ \,, I.
RPC HV&LV status Introduction HV power supply tender
CO2 Cooling IPNL Nick Lumb, 28/01/09.
' '· \ ·' ,,,,
H.
Status of the CNRS Contribution to the ESS Accelerator
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Presentation transcript:

LHCb UT & Velo CO2 COOLING ELEMENT SELECTION 31/08/2016 Andrea d'AURIA EP/ DT / FS

Status of the pre-construction Part list Junction box 31/08/2016 Andrea d'AURIA EP/ DT / FS

Status of the pre-construction Special element from part list Rotarex valves, offer received, order ready , can be sent Details: Vanne à soufflet haute pression cryogénique à commande pneumatique NF – DN12 (siège) – PS maxi : 240 bars - Corps droit inox 316L avec raccordements entrée et sortie type VCR3/4’’ mâle (fixe) – Soufflet inox 316L – Clapet PCTFE – 2 détecteurs de proximité inductifs (O et F) – Matériel dégraissé O2 – Finition : Ra 0.8µm - Testé à l’hélium. Réf. HP9012-N PP385NF I/K MV3/4’’ DPI2 Quantité : 4 Prix unitaire HT net : 1933.50 € Delivery time 8 weeks 31/08/2016 Andrea d'AURIA EP/ DT / FS

Status of the pre-construction Special element from part list filters from HNP Details: Join used in the filters: Kalrez /graphite Delta P with mesh 10 micron and 4 l/min is 0.8 mbar. Possibility to have other Mesh, waiting offer Inline filter F-MI3 (straight) 31/08/2016 Andrea d'AURIA EP/ DT / FS

Status of the pre-construction Special element from part list Prototype valve from DMD with Swagelok valve will be ready the 15th of September: Details: SWAGELOK part: SS-8UW-VCR-37308: 915 chf/pc delivery 10/12 weeks DMD part: Actuator and long extension: 820 CHF/PC 31/08/2016 Andrea d'AURIA EP/ DT / FS

Status of the pre-construction Special element from part list Burst disk from Swagelok with special adaptor from DMD: SWAGELOK part SS-RDK-16-1900: 131 bar rupture disc 1/2" VCR 80 CHF/pc DMD part: Adaptor female ¼ modified 50 CHF/pc 31/08/2016 Andrea d'AURIA EP/ DT / FS

Status of the pre-construction CONCLUSION Main component can be ordered Still waiting for some offers Ready to build as soon as parts arrive CAD model being finalised 31/08/2016 Andrea d'AURIA EP/ DT / FS