xTCA in CMS Magnus Hansen Thanks to many CMS collaborators

Slides:



Advertisements
Similar presentations
Goals and status of the ATLAS VME Replacement Working Group Markus Joos, CERN Based on slides prepared by Guy Perrot, LAPP 19/09/2012.
Advertisements

xTCA at CERN an overview based on input from many kind colleagues
XTCA working group M. Hansen, CERN. xTCA Owned by PICMG (PCI Industrial Computer Manufacturers Group) ATCA (2002, 2007) – Advanced Telecommunications.
XTCA activities at CERN Markus Joos PH-ESE xTCA interest group – Background – Report of the 2 nd meeting (held on 7.3.) uTCA evaluation and AMC development.
Preliminary Design Review: Hub Implementation Dan Edmunds, Wade Fisher, Yuri Ermoline, Philippe Laurens Michigan State University 01-Oct-2014.
Pulsar II Hardware Overview Jamieson Olsen, Fermilab 14 April 2014
Presentation for the Exception PCB February 25th 2009 John Coughlan Ready in 2013 European X-Ray Free Electron Laser XFEL DESY Laboratory, Hamburg Next.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
M. Joos, PH/ESE1 ATCA for ATLAS - status Activities of the working group PH/ESE xTCA evaluation project Next steps.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
T. Gorski, et al., U. Wisconsin, November 08, 2011 Calorimeter Trigger Upgrade - 1 Upgrade Cal. Trigger R&D M. Bachtis, A. Belknap, M. Cepeda, S. Dasu,
New ATCA compute node Design for PXD Zhen-An Liu TrigLab, IHEP Beijing Feb , 6th International Workshop on DEPFET Detectors and Applications.
Consideration of the LAr LDPS for the MM Trigger Processor Kenneth Johns University of Arizona Block diagrams and some slides are edited from those of.
The CMS Modular Track Finder (MTF7) Trigger Board D. Acosta, G. Brown, A. Carnes, M. Carver, D. Curry, G.P. Di Giovanni, I. Furic, A. Kropivnitskaya, A.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Backend Control Systems in uTCA HCAL Requirements January 21, 2010 Jeremiah Mans.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
E. Hazen -- TWEPP MicroTCA Developments in CMS E. Hazen - Boston University for the CMS Collaboration TWEPP 2012 – Oxford.
E. Hazen - Detector Electronics1 Detector Electronics New Developments.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
E. Hazen -- Upgrade Week1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
MicroTCA Introduction ● New telecom standard from PICMG ● 75mm high cards with ~ 10Gbit/sec serial backplane (up to 20 ports) ● Selected for SLHC trigger.
E. Hazen - CMS Electronics Week
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
26 Sept 2013E. Hazen - TWEPP / AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University Representing the work of J. Rohlf, S.X. Wu, A. Heister,
Counting Room Electronics for the PANDA MVD
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Modular Electronics an overview of modern standards
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
The White Rabbit MCH Javier Serrano on behalf of Tomasz Włostowski
TWEPP 2010 – Aachen Development of a MicroTCA Carrier Hub
Novosibirsk, September, 2017
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
The First HCAL Readout Schedule! (7/22/99 UMD meeting)
AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University
E. Hazen - Back-End Report
AMC13 Status Report AMC13 Update.
Future Hardware Development for discussion with JLU Giessen
Off-detector electronics: what could be a generic module?
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
ALICE Trigger Upgrade CTP and LTU PRR
HCAL Data Concentrator Production Status
uTCA A Common Hardware Platform for CMS Trigger Upgrades
Task T - CMS at LHC Global Calorimeter Trigger
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
AMC13XG (XG = Ten Gigabit)
Read-out of High Speed S-LINK Data Via a Buffered PCI Card
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
MicroTCA A look at different options...
DAQ Interface for uTCA E. Hazen - Boston University
New Calorimeter Trigger Receiver Card (U. Wisconsin)
GEM for CMS Electronics Overview
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

xTCA in CMS Magnus Hansen Thanks to many CMS collaborators

Introduction CMS legacy off detector systems are essentially VME based DAQ exception: cPCI Upgrades may profit from more recent technology The world is going high speed serial rather than medium speed parallel; VME bus voltage levels are high; performance still adequate though AMCs and uTCA was selected as the main candidate a few years ago Unique in its dual specification Main card in uTCA systems Mezzanine card on e.g. (commercial) ATCA carriers Does away with custom hardware, e.g. SBC or PCI interface cards in the PC Considerable investment in Expertise behind us CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

Systems with upgrade plans LS1 and LS2 Not a one size fits all: Some systems may chose to continue using VME for upgrades ATCA, VME None for the moment uTCA CMS HCAL back end Level 1 trigger Calorimeter trigger (RCT – GCT) Global trigger Global Muon trigger Drift Tube, overlap, EMU Track Finder and input systems TCDS (TCS, TTC, TTS) CMS Pixel readout CMS GEM1/1 BRIL CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

Early development: CMS Matrix card The initial CMS test engine (2006) 16 bidir front panel links Snap12 / pop4 Fully populated backplane 72x72 cross point switch Paired with the Aux card TTC, TTS, DAQ CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

Matrix conclusion Single width card size is not big; Prefer double width Creates more constraints than you really need Defendable if plan is to use **only** as mezzanine on ATCA carrier Full height is desirable Heat sink for e.g. FPGA CMS generally target lower than industry standard die temp for longevity Commercial e.g. processors generally idle and will shut down of temp too high, thus different from our case Height of optical components Front panel area Becomes ~½ of the area on e.g. ATCA, 2/3 of 9U VME and similar to 6U VME CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

uTCA Standardize key items in order to ease commissioning and long term maintenance of upgraded systems Crate, a.k.a. Shelf CMS interface, a.k.a. AMC13 Discontinuity in the spec  Data Acquisition (DAQ) Trigger Timing and Control (TTC) Trigger Throttle (TTS) AMC Module Management Controller (MMC) UW design; very complete, used in e.g. CTP*, MTF*, uHTR, AMC13 UK design; also very complete, used in e.g. MP7, FC7 DESY/CPPM/CERN design; supported by CERN; includes mezzanine ref design Register access software and firmware IPBUS; includes a large software package and firmware CMS DCS integration System manager CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

Planned uTCA Ports Use for CMS * Note: Interconnections can be customized by the backplane manufacturer relatively inexpensively. E. Hazen, BU CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

Proposed CMS uTCA Shelf Power1 AMC MCH AMC13 Power2 e.g. Vadatech VT892 12 full size double height slots Vertical air flow Redundant power supply Redundant telecom backplane Fabric C and D routed to MCH 1 & 2 tongue 2 Fabric E and F routed to MCH 1 & 2 tongue 3 & 4 Customizable backplane additional backplane interconnects (e.g. VT894, VT895) E. Hazen, BU CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

Prototype shelf / crate CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

CMS interface AMC13 T1 T2 T3–T4 TTC interface AMC DAQ links over Fabric A Three 5/10 Gb DAQ links T2 Distributes LHC clock and ctrls FCLKA and Fabric B T3–T4 Service interfaces (base config) Optional (TCDS) TTCMi clock TTCMi orbit Two level 1 triggers (LVTTL) Two auxiliary (NIM) inputs T3-T4 can be customized CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

CMS interface: AMC13 T3 board Connector to T3 provides: Quad SFP+ Cage Provides JTAG / LEDs on front panel Cross-point switch for trigger applications (could be omitted if some other solution is found for front panel) space Connector to T3 provides: Power Serial bus (SPI or I2C) from MMC Front-panel signals: JTAG or SPI for miniUSB Status LEDs T4 T3 Quad SFP+ Cage T2 T1 Custom T2 Clock / controls fanout MMC functions (as AMC-13) GbE endpoint (from MCH1) for controls Custom T1 base board TTC receiver; TTS transmitter 3 SFP+ (up to 10 Gb, e.g. DAQ) GbE endpoint (from MCH1) for controls and local DAQ CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

Modules in production in CMS uHTR HCAL, BRIL FE: XC6VLX240T BE: XC6VLX195T 24 Rx @ 6.4Gb (4.8Gb) 12 Tx @ 6.4Gb (4.8Gb) 2 TRx @ 4.8Gb Ports 4,5,8,9 populated CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

Modules in production in CMS FC7 TCDS, Pixels XC7K420T Two LPC FMC sites Site 1: 8 TRx @ 10Gb Site 2: 12 TRx @ 10Gb Ports 4-11 populated CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

Modules in production in CMS MP7 CT layer 2, Muon BTF, uGMT, uGT, GEM, etc. XC7VX690T 72 Rx @ 13Gb 72 Tx @ 13Gb Ports 4-8 populated 9-11 LVDS CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

Modules in production in CMS CTP7 CT layer 1 XC7VX690T XC7Z045 GbE endpoing, uP 67 Rx @ 10Gb 48 Tx @ 10Gb Ports 4-7, 12-15, 17-20 populated (as VT894, VT895) CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

Modules in production in CMS MTP7 Muon OTF, ETF Dual card stack Occupies two slots XC7VX690T XC7K70T 80+4 Rx @ 10Gb 28 Tx @ 10Gb Pt LUT module Up to 2GB low latency RAM Split in banks CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

Modules ready for production in CMS Twinmux DT sector collector XC7VX330T 64 Rx @ 480Mb 12 Rx @ 10Gb Used @ 1.6Gbps 12 Tx @ 10Gb Ports 4-8 populated 9-11 LVDS Implements the MMC reference design from DESY/CPPM/CERN CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch

Power-One AC/DC (48V) converter Commercial Items uTCA crate Vadatech or Schroff Power-One AC/DC (48V) converter MCH NAT or Vadatech Power Module NAT or Vadatech

Recent shelf uTCA crate Vadatech or Schroff Schroff shelf features 4 power modules In the rear of the shelf 2 in parallel in the front JSM in the rear JSM has been custom developed Access to backplane JTAG through – jtag (rotary switch), Ethernet. Up to six RTMs in the outer slots 1-3, 10-12 Not used by CMS to date

Power-One AC/DC (48V) converter Issues Issues with PowerOne N+1 Redundant Highly efficient Monitoring but not control Redundancy complicates things 20A Circuit breakers are not switches The circuit breakers are only for line protection If used for powering up power modules one by one some power modules may fail to power up properly Power-One AC/DC (48V) converter

Summary CMS is using almost (?) exclusively mTCA for the phase 1 upgrades Most issues are ironed out to a level beyond the capability of the legacy VME systems Monitoring, potential availability, etc. Phase 2 being around the corner the door is still open for other standards to enter CMS xTCA M. Hansen, CERN. magnus.hansen@cern.ch