Report and Order Impact on 700 MHz Frequencies: NPSTC Regional Planning Committee Session, Atlanta GA November 12, 2007 ________ Sean O’Hara and Margaret.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0046r0 Submission July 2009 Ari Ahtiainen, NokiaSlide 1 A Cooperation Mechanism for Coexistence between Secondary User Networks on.
Advertisements

Frequency Coordination & Related Communications Planning Services
SCIP Conference Austin, Texas August 24, Migrating to Narrowband On July 2, 1991, The Commission released a Notice of Inquiry to gather information.
Frequency Co-ordination -for what? The Agreement Frequency Co-ordination -Advantages Frequency Co-ordination -Disadvantages The Procedure Administrative.
TV Bands Database Administrators Meeting Implementation Update November 3, 2011 FCC Office of Engineering and Technology.
 FILE S SYSTEM  DIFFERENT FILE SYSTEMS  FILE SYSTEM COMPONENTS  FILE OPERATIONS  LOG STRUCTERD FILE SYSTEM  FILE EXAMPLES.
Cloud Use Cases, Required Standards, and Roadmaps Excerpts From Cloud Computing Use Cases White Paper
© 2001 Business & Information Systems 2/e1 Chapter 8 Personal Productivity and Problem Solving.
APCO Western Regional Long Beach, CA March 1, MHz Issues Robert Gurss APCO Director of Legal & Government Affairs (202) ,
Overview of Service Rules: Technical Issues Phase II 220 MHz Service (Auction No. 72) Gary Devlin Engineer, Mobility Division Wireless.
The Alternative Larry Moore. 5 Nodes and Variant Input File Sizes Hadoop Alternative.
CSMAC Spectrum Sharing Sub- Committee Discussion Materials March 2012.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 9 Designing Databases 9.1.
NPSTC Meetings, November 2007 Margaret Daly and Sean O’Hara Syracuse Research Corporation New York Statewide Wireless Network Program RPC 700 MHz Interference.
National Public Safety Telecommunications Council Public Safety Spectrum Trust Liaison Committee Don Root February 11, 2008.
Spectrum Sharing in 3.5 GHz Band
Innovation, Science and Economic Development Canada (ISED) 600 MHz Repurposing RABC 600 MHz Working Group Meeting Innovation, Science and Economic Development.
Agenda item 1.16 VHF data exchange system (VDES).
Computer Security: Chapter 5 Operating Systems Security.
International Telecommunication Union Document WRC-15-IRWSP-15/14-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
1 70/80/90 GHz Web-Based Coordination Improving the Effectiveness of the Domestic Spectrum Management Process National Spectrum Managers Association Arlington,
NPSTC is a federation of organizations whose mission is to improve public safety communications and interoperability through collaborative leadership.
Personal Communication Services & WiFi
3.3 Fundamentals of data representation
Technology as a Policy Enabler
700 MHz Regulatory Update June 11, 2007
Memory Management.
FCC 9th NPRM re 700 MHz Public Safety Broadband Released 12/20/06
N-Tier Architecture.
4.9 GHz National Plan Update
WF on single switched TX UL
Other Services in Hyrax
IEEE ac/af and Spectrum Sharing
Regulatory Update David Eierman/Bette Rinehart Motorola
Optimizing the 700 MHz Band: The FCC’s Further NPRM
Parallel Density-based Hybrid Clustering
Created by Kamila zhakupova
3GPP TSG RAN Meeting #67 Shanghai, China, 9 – 12 March, 2015
Data Compression.
Introduction to Computers
700 MHz Narrowband Channel Relocation Plan
Operating Systems What are they and why do we need them?
Spread Spectrum L.Tahani Aljehani.
Proposal on system description, reference model and draft outline
IEEE ac/af and Spectrum Sharing
IEEE af and Spectrum Sharing
Communications Regulatory Authority
600 MHz – Proposed TV Transition Objectives and Methodology
Submission Title: [Channel Page/Number Proposal]
TG1 Tutorial Review Date: Authors: May 2010 May 2010
( ASSOCIATE PROFESSOR)
Technician Licensing Class
Support for ”interactive batch”
Presented by Mohamad Haidar, Ph.D. May 13, 2009 Moncton, NB, Canada
Chapter 3 Hardware and software 1.
Resource allocation principles for coexistence system
ECE 544 Project III Description and Timeline March 23, 2018
Chapter 3 Hardware and software 1.
Building continuously available systems with Hyper-V
Operating System Chapter 7. Memory Management
Pre-Close Data Harvesting Rules to Avoid Gun-Jumping
Multithreaded Programming
FCC Narrowband Update June 24, 2004
TG1 Tutorial Review Date: Authors: May 2010 May 2010
SADC WRC-15 Preparatory Meeting
800 MHz Rebanding Mexican Border
5.00 Apply procedures to organize content by using Dreamweaver. (22%)
Mechanism for Inter-system Coexistence
NRPC WACN/SYSTEM ID ASSIGNMENT PROCESS
Cellular Systems.
Presentation transcript:

Report and Order Impact on 700 MHz Frequencies: NPSTC Regional Planning Committee Session, Atlanta GA November 12, 2007 ________ Sean O’Hara and Margaret Daly NPSTC Support Office Syracuse Research Corporation, Systems Technology Center

The FCC Order: Changes in the Band Plan As you all know by now, the FCC has made some substantial changes to the 700 MHz band plan. NB and BB now in contiguous blocks, with most NB falling on TV channels 64/69, and most BB falling on 63/68 Everything is now offset, so 1 MHz of both the transmit and receive side spectrum hangs over onto TV channels 62 and 67 respectively The pictures on the next pages show the new plan, and the shift of the narrowband channels

The FCC Order: Changes in the Band Plan Joint Nationwide BB Network

The FCC Order: Changes in the Band Plan

What Effect Does This Have on the Pool Allotments? The Pool allotments are utilized by the majority of the RPCs Combiner and separation constraints are now violated for many counties 643 Counties, or about one out of every five counties Adjacent channel separation constraints are now violated for many counties 286 Counties, or about one out of every nine counties These problems are not due to the pool allotments themselves, they are due to shifting within the Order Even RPC’s not using the pool allotments will have these issues

Changes in the Band Plan: Core Issue All frequencies on either side of this line were separated by at least 3 MHz before. That separation can now be as low as 6.25 kHz Assignments made within this 500-kHz wide zone can now be closer than normally allowed.

Areas Affected by the New Band Plan

What will be Done with the Pool? It has been decided by the RPCs that the pool should be repacked according to the new FCC plan These issues will then be resolved during the re-pack Trying to fix these issues piecemeal would very difficult Especially the interregional coordination Fixing everything together will allow the regions to move together, and eliminate delays due to individual concurrences. This time it will also be possible give each individual region a better pack based upon their local needs and plans for the spectrum NRPC / Texas Sheriffs will be sending out information forms/spreadsheet Expect that State spectrum pool will be generated as well

What Will be Different with This Pack? Soften the constraints with as much user input as we can get Give the individual RPCs, Counties, and Municipalities exactly what they want/need with respect to: Combiner Spacing Channel Width Internal Reuse, Simulcast Effects, etc Continue to take advantage of better code/algorithms and hardware Genetic algorithm techniques already on line, and much more powerful than previous techniques High power computing capabilities are available (see next slides) If possible, take into account Mexican and Canadian border sharing arrangements. These factors will offer even better packing efficiency OTHER IDEAS?

Example: High Performance Computing SRC STC Comms Group HPC Cluster 10 processing servers And adding ten more… Dual quad-core Xeon 2.66 GHz processors in each server 80 total cores 2 servers with 32 GB of RAM, 8 with 16 GB 192 GB total processing RAM 12 Terabyte Storage Effective storage space is 9.5 TB after RAID 5 losses Heterogeneous multi-boot Linux/Windows

Example: High Performance Computing Current uses SAR image formation High fidelity simulation and modeling Detailed EM modeling Spectrum engineering and system optimization 64-bit architecture 32-bit Array size 231 -1 elements 64-bit array size 248 - 1 elements 1 - Desktop 1 Dwell in ~ 7 Minutes (7 minutes/Dwell) Multi-Node Computing *Slightly under utilized the HPC systems, all blades not used. 48 Dwells in ~ 7 Minutes (8.75 second/Dwell)*

Expected Format of Pool Results CSV Data File: Comma-separated-data that can be uploaded into CAPRAD by TEQ. This format is identical to how the initial allotments were delivered. Google Earth Overlays: Overlays of service and interference polygons will be provided for all the county-like entities as either a single consolidated file, or as individual kml files. Overlays of service and interference polygons will also be provided for all the frequencies assigned, as either a single consolidated file, or as individual kml files. HTML Results Tree: An integrated and fully inter-hyperlinked html code tree will be provided, with text, tables, and graphics. The basic elements will fall into two classes: frequencies, and County entities. For each class, detailed documentation of the final results will be created. For the many large scale spectrum optimization problems that SRC has completed, this format has represented the easiest and most intuitive way to view the complex and inter-related results.

International Issues Can provide an update on Canadian Issues Someone else may provide insight on the Mexican areas Was able to clarify some issues raised last meeting that arose with Industry Canada at the September Radio Advisory Board of Canada (RABC) meetings in Toronto More bad news

Current US/Canadian LoU The current US/Canadian LoU from 2005 provides a very detailed description of Channel locations Emission limits Primary and Secondary utilization of 700 MHz in the border areas Rules for TV and LMR protection The recent FCC order in that it conflicts with the LoU in many areas Frequency availability Channel widths FCC and IC seem to agree that the Order cannot be implemented in the border areas until a new LoU or other arrangement) can be negotiated IC will not do a new LoU without their version of several rounds of public notice; between 1 ½ and 2 ½ years Late September’s meetings were the first that had this item on the agenda between the FCC and IC

The LoU: Sharing Zone 1, Sector 2 (NYS Area) TV: 63/68 TV: 64/69

The LoU: Sharing Zone 1, Sector 2 (NYS Area) Narrowband Designated In Border Area Narrowband Designated Spectrum

The LoU: Sharing Zone 1, Sector 2 (NYS Area) Wideband Designated In Border Area TV: 63/68 TV: 64/69 Wideband Designated Spectrum

The LoU: Sharing Zone 1, Sector 2 (NYS Area) TV: 63/68 TV: 64/69 Broadband Designated Spectrum

The LoU: Sharing Zone 1, Sector 2 (NYS Area) Available Before Late 2011 LoU: Narrowband Designated In Border Area New Narrowband In FCC Order TV: 63/68 TV: 64/69

The LoU: Sharing Zone 1, Sector 2 (NYS Area) Available Before Late 2011 New Broadband In FCC Order LoU: Wideband Designated In Border Area TV: 63/68 TV: 64/69

What’s Ahead Before signing a new LoU, Canada will need to work through several rounds of Gazette Notices to understand the needs/desires of Canadian public safety Already moving on this; continue to work with CTIG, RABC, etc. A new LoU needs to be developed ASAP Canada is still not clear on direction they want to go with this Border area narrowband and broadband in limbo The FCC/State Department and Canada/IC need to find a way to work within the exiting LoU somehow in the meantime if we can actually follow the new order. Having flexibility to deploy NB on WB allocations will help the narrowband deployment issues in the border areas The deployment of BB in the border areas will involve both flexibility to deploy BB on NB, and the use of secondary spectrum of some new kind of co-primary agreement put in place.