CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept

Slides:



Advertisements
Similar presentations
6.5 River Stability and Bank Protection John Ratsey
Advertisements

Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
DINGMANS CREEK RIGHT BANK RIPARIAN VEGETATION PLANTINGS, WITH SOME SOIL CHOKE & PLANTING OF EXISTING Rt. 209 DELAWARE WATER GAP NATIONAL RECREATION.
Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012.
Gravel Mining Ryan Kindt Kristina Lowthian CIVE 717 April 9, 2012 Gualala River, California fly-over, Courtesy: Jamie Hall.
Rock Riffle Design Course
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
SAND THE FOOT OF KANOPOLIS DAM, KANSAS Let’s build Engineered Rocked Riffle #5 the most upstream of the five riffles that will be constructed.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Articulating Concrete Mattress (ACM) Systems
THE ENGINEERED FLOODPLAIN BENCH. Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either.
TRADITIONAL WINDROW & TRENCH-FILL REVETMENTS, & A NEW INVENTION, VEGETATED TRENCH-FILL REVETMENT {All 3 are classified as “Setback Revetments”}
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
DIFFERENCES BETWEEN BENDWAY WEIRS & ROCK VANES/BANK BARBS {All are redirective methods}
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.  Bank erosion is threatening a farm road  NRCS –Environmental Quality Incentives Program {EQIP} cost.
LOCKED LOGS (LL). THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
POPLAR RIVER, LUTSEN, MN. SEPARATING THE MEGA-SLIDE FROM THE RIVER (AND MORE) By the stream dream team.
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
ICE DAMAGE REDUCTION PROJECT- CHAUTAUQUA MOUTH (LAKE ERIE) WESTFIELD, NY Pix by Dave Spann.
SKUNK RIVER PIPELINE PROTECTION PROJECT NEAR DENMARK, IOWA SUB MAR.
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
SUB MAR West Fork of Beaver River West Point, OH. Pre-project pictures. Note eroding outer bank.
West Fork Beaver River, West Point, OH. Constructed Sept Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
SINGLE STONE BENDWAY WEIRS
An Experience In Conducting A Longitudinal Profile… A Study of the Response of San Pedro Creek to the US Army Corps of Engineers (USACE) Flood Control.
Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews.
BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
THE STEP- BY STEPS: as posted on the FTP site. Cross-section of Eroded Bank.
McKinstry Creek, Delevan, NY This was a complete stream and floodway realignment. Constructed June-July The stream had been straightened prior.
Lake Tahoe Stream Channel Load Reduction and Costs Virginia Mahacek Valley & Mountain Consulting September 2007 Focus Team Workshop 1.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
GRADE CONTROL: the VIFFLE {Combo of the cross- Vane & rocked rIFFLE}
McKinstry Creek NYS DOT Mitigation Project STREAM & RIPARIAN COORIDOR RESTORATION, WETLAND REWETTING, VERNAL POOLS, “RPM” PLANT EXPERIMENTAL TEST PLOTS,
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Half-Drowned Bushes with Traffic Control Stones & additional plantings.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
Headcut gets taller & ACM mat flips out of the upstream key trench of the downstream pipe crossing, which causes problems. Project.
GRADE CONTROL.
GOAL & FUNCTION-BASED DESIGN FOR RIPARIAN & STREAM SYSTEMS THE EIGHTEENMILE CREEK PROJECT PHASE I CONSTRUCTED AUG-SEPT 2003 PHASE II.
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
ONONDAGA CREEK, NEAR SYRACUSE, NY
VINES – THE OVERLOOKED RESTORATION TECHNIQUE
When should you fix a stream????
SINGLE STONE BENDWAY WEIRS
Module # 8 Channel Evolution Implications & Drivers of Instability
Module # 16 Restoring Functions to Streams Through Design
Iowa’s River Restoration Toolbox Level 1 / Base Training
When should you fix a stream????
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY.
In-Stream Structures & Grade Control
Guadalupe Williams Pipeline Crossing, South of Victoria, TX
Presentation transcript:

CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept. 2002 Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream

Functions of Bendway Weirs on the West Fork Beaver River: Main function is realignment of the thalweg through the bend and also center the thalweg within the channel immediately downstream of the bend where a pipeline was exposed by erosion. The pipeline cover was protected with Articulated Concrete Mattress (ACM). Secondary function was to provide some bank stabilization within the bend.

West Fork of Beaver River West Point, OH. Pre-project picture. Looking US at an eroding outer bank. SUB MAR

NOTE: We did not build the two upstream Bendway Weirs SUB MAR NOTE: We did not build the two upstream Bendway Weirs

Close-up of Bendway Weirs SUB MAR Close-up of Bendway Weirs

Looking DS at three Bendway Weirs, constructed Sept 2002 Pix by derrick 9-2002 SUB MAR

Looking DS at the same 3 Bendway Weirs 5 years after construction Looking DS at the same 3 Bendway Weirs 5 years after construction. Fines in BW’s have washed out, but well graded 18 to 24 inch stone is stable & bank is stable. Pix by derrick 9-17-2007 SUB MAR

Looking US at two low elevation Bendway Weirs, two years after construction, 05/11/2004. SUB MAR

Looking US at the same two low elevation Bendway Weirs, five years after construction, 9/17/2007. Note stable flat angle, vegetated bank. SUB MAR

Close-up of the DS low-elevation Bendway Weir, five years after installation. Pix by derrick 9-17-2007 SUB MAR

Great aquatic habitat due to the deep pools created by the Bendway Weirs. These pools were full of high quality fishes, indicating that water quality is excellent. {5 years after project completion} SUB MAR Pix by derrick 9-17-2007

WE ARE DOG TIRED, THIS PROJECT IS DONE !! Cleophus Speed Elvis Derrick “Based on the interagency publication, Stream Corridor Restoration: Principles, Processes, and Practices, this introductory training covers: Stream corridor ecosystems and their components Ecological processes, structure & functions Characterization and analysis of stream corridors Development of a restoration plan Design, implementation, monitoring, and Integrated, iterative, adaptive, flexible approaches”.