ALADIN 08/09: achievements, problems & outlook

Slides:



Advertisements
Similar presentations
Assimilation of radar data - research plan
Advertisements

LACE Data Assimilation Working Days June 2011, Budapest HARMONIE DA suite at KNMI Jan Barkmeijer With contributions from: Cisco de Bruijn, Siebren.
Basics of numerical oceanic and coupled modelling Antonio Navarra Istituto Nazionale di Geofisica e Vulcanologia Italy Simon Mason Scripps Institution.
Introduction to data assimilation in meteorology Pierre Brousseau, Ludovic Auger ATMO 08,Alghero, september 2008.
LRF Training, Belgrade 13 th - 16 th November 2013 © ECMWF Sources of predictability and error in ECMWF long range forecasts Tim Stockdale European Centre.
ECMWF long range forecast systems
Status and performance of HIRLAM 4D-Var Nils Gustafsson.
The EISCAT_3D Science Case: Atmospheric Section Ian McCrea STFC RAL.
2/06/2004ALADIN Workshop, Innsbruck1 The general problem of moist processes in ALADIN-2 J.-F. Geleyn ALADIN-2/CHMI (Prague) & Météo-France (Toulouse)
1 14tn ALADIN Workshop - Innsbruck Testing the new ACDRAG scheme in the ALPIA environment A tricky ping-ponggame Bart Catry Ghent University Belgium F.
Common HIRLAM and ALADIN-M/F physics plan (08/05) J-F Geleyn, B. Hansen-Sass, G. Hello & L. Rontu Oslo mini-workshop Mesoscale physics and diagnostic tools.
The impact of localization and observation averaging for convective-scale data assimilation in a simple stochastic model Michael Würsch, George C. Craig.
Overview of the present HIRLAM surface assimilation Mainly taken from: HIRLAM Technical Report No. 58.
QUANTIFICATION OF DIVERGENCE IN ALADIN Vanja Blažica, Benedikt Strajnar, Nedjeljka Žagar.
Prague'03 / Physics & its interfacing Physics & its interfacing – the AROME case J.-F. Geleyn & L. Gérard I) Generalities II) Challenges & likely problems.
29th EWGLAM meeting, Dubrovnik, October 2007 ALARO Physics developments Neva Pristov LACE Working group for physics.
CSE 303 – Software Design and Architecture
Data assimilation and observing systems strategies Pierre Gauthier Data Assimilation and Satellite Meteorology Division Meteorological Service of Canada.
ALADIN/AROME workshop Preliminary conclusions of the joint meeting of CSSI and LSMG April, 2003, Prague1 JOINT MEETING OF CSSI and LSMG JOINT MEETING.
ALADIN A transition year EWGLAM/SRNWP, Dubrovnik, 8/10/07.
Prague' 03 - Convergence1 Convergence between the ALADIN and AROME projects: opportunity and challenges I)Motivation II)Issues III)Partnerships IV)New.
Tropical Domain Results Downscaling Ability of the NCEP Regional Spectral Model v.97: The Big Brother Experiment Conclusions: Motivation: The Big Brother.
Météo-France / CNRM – T. Bergot 1) Introduction 2) The methodology of the inter-comparison 3) Phase 1 : cases study Inter-comparison of numerical models.
HIRLAM 3/4D-Var developments Nils Gustafsson, SMHI.
RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1.
26 th EWGLAM & 11 th SRNWP meetings, Oslo, Norway, 4 th - 7 th October 2004 Stjepan Ivatek-Šahdan RC LACE Data Manager Croatian Meteorological and Hydrological.
CCSM Atmospheric Model Working Group Summary J. J. Hack, D. A Randall AMWG Co-Chairs CCSM Workshop, 28 June 2001 CCSM Workshop, 28 June 2001.
Development of a one-dimensional version of the Hirlam-model in Sweden Background: This model has been run operationally for about nine years now. Mainly.
T. Bergot - Météo-France CNRM/GMME 1) Methodology 2) Results for Paris-CdG airport Improved site-specific numerical model of fog and low clouds -dedicated.
A Thermal Plume Model for the Boundary Layer Convection: Representation of Cumulus Clouds C. RIO, F. HOURDIN Laboratoire de Météorologie Dynamique, CNRS,
Page 1 Andrew Lorenc WOAP 2006 © Crown copyright 2006 Andrew Lorenc Head of Data Assimilation & Ensembles Numerical Weather Prediction Met Office, UK Data.
Météo-France / CNRM – T. Bergot 1) Methodology 2) The assimilation procedures at local scale 3) Results for the winter season Improved Site-Specific.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of the COSMO-1 configuration at MeteoSwiss Guy.
LAM activities in Austria in 2003 Yong WANG ZAMG, AUSTRIA 25th EWGLAM and 10th SRNWP meetings, Lisbon,
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
E. Bazile, C. Soci, F. Besson & ?? UERRA meeting Exeter, March 2014 Surface Re-Analysis and Uncertainties for.
Numerical simulations of the severe rainfall in Pula, Croatia, on 25 th September 2010 Antonio Stanešić, Stjepan Ivatek-Šahdan, Martina Tudor and Dunja.
ECMWF/EUMETSAT NWP-SAF Satellite data assimilation Training Course Mar 2016.
Characteristics of precipitating convection in the UM at Δx≈200m-2km
Soil analysis scheme for AROME within SURFEX
Recent data assimilation activities at the Hungarian Meteorological Service Gergely Bölöni, Edit Adamcsek, Alena Trojáková, László Szabó ALADIN WS /
ASCAT soil moisture data assimilation with SURFEX
Meteorological and Hydrological Service of Croatia
I. Sanchez, M. Amodei and J. Stein Météo-France DPREVI/COMPAS
Progress in development of HARMONIE 3D-Var and 4D-Var Contributions from Magnus Lindskog, Roger Randriamampianina, Ulf Andrae, Ole Vignes, Carlos Geijo,
Performance of ALARO0 baseline in pre-operational testing
met.no – SMHI experiences with ALARO
Physics developments in ALADIN: towards higher resolution
HIRLAM mesoscale report
Data Assimilation Training
ALADIN 09/10: achievements, problems & outlook
Impact of Traditional and Non-traditional Observation Sources using the Grid-point Statistical Interpolation Data Assimilation System for Regional Applications.
Highlights of activities
On the role of entrainment at the grey zone scales
How do models work? METR 2021: Spring 2009 Lab 10.
Seamless turbulence parametrization across model resolutions
Meteorological and Hydrological Service of Croatia
Recent changes in the ALADIN operational suite
Tony Wimmers, Wayne Feltz
Mark A. Bourassa and Qi Shi
Data Mining Practical Machine Learning Tools and Techniques
National Center for Atmospheric Research
Climate Dynamics 11:670:461 Alan Robock
Modeling the Atmos.-Ocean System
Peter Lean1 Suzanne Gray1 Peter Clark2
GIFS-TIGGE project Richard Swinbank, and Young-Youn Park,
Operational Aladin-Belgium
Short Term forecasts along the GCSS Pacific Cross-section: Evaluating new Parameterizations in the Community Atmospheric Model Cécile Hannay, Dave Williamson,
Development of an advanced ensemble-based ocean data assimilation approach for ocean and coupled reanalyses Eric de Boisséson, Hao Zuo, Magdalena Balmaseda.
NWP activities in Austria in 2006/2007 Y. Wang
Presentation transcript:

ALADIN 08/09: achievements, problems & outlook J.-F. Geleyn, ALADIN PM HIRLAM ASM & ALADIN Workshop, Utrecht, 12/5/2009

Main ‘achievements’ since Brussels The first version of the ALADIN 4-year plan was produced (and approved by PAC and General Assembly). The installation of a ‘gliding’ process has been postponed but hopefully for the good of the second version (see below). Our central problem in ALADIN is still the difficulty to move manpower from over-staffed to under-staffed activities => the challenge was addressed but with yet limited success. The past year has undoubtedly been marked by two influential set of events: Operational status for AROME and (full) ALARO-0; More concrete introspective steps, both internally (‘convergence’) and within HARMONIE (strategy for moist physics improvement & maintenance issues => search for ‘internal interoperability’).

Main ‘achievements’ since Brussels The ‘F-R’ financial mechanisms are stabilised: The backlog in money flow is close to be wiped out; In the 2006 kick-off year, 31 k€ of ‘flat rate money’ helped financing 14 missions and 6 scientific stays; In 2007, on the same basis, 55 k€ helped financing 13 missions and 12 scientific stays; For 2008, the realisations were of 80 k€ for 11 missions and 21 scientific stays; a procedure of ‘demand’ and ‘offer’ for the choice of the stays was succesfully implemented; For 2009, the plans are of 66 k€ for 21 missions and 16 stays (the adequation of ‘offer’ to ‘demand’ was lower, the mission demand grew again and we started saving); All this is beside RC-LACE activities (research, training) and Météo-France’s supports (maintenance, networking) as well as Partners’ other ‘voluntary’ and ‘in-kind’ efforts.

Main ‘achievements’ since Brussels Survey of the progress on the common part of the HIRLAM and ALADIN plans continues showing contrasts, which we cannot anymore attribute to misunderstanings. In fact: In Bratislava we envisaged the working practices; In Sofia we went to the methodology; In Oslo we look at the details for difficult issues; In Brussels we started assessing the outcomes, but careful inspection showed case to case discrepancies; In De Bilt we should start letting run free what already ‘matches’ and give a new (sometimes structural) kick-off to topics in need of it. Homogeneity will probably still decrease but hopefully for the long-term good of the endeavour.

AROME became operational in Toulouse on 18/12/08 Radar observation Aladin

Operational applications of ALARO-0 ALARO-0-minus-3MT Full ALARO-0 Cz 30/1/07 4/6/08 At 13/9/07 7/4/09 Sk 19/2/08 19/8/08 Hr 25/2/08 Si X 16/6/08 Be (5km) 15/1/09 The past year has been the one of the operationalisation of ‘full ALARO-0’ (i.e. including 3MT). Benefits exist for resolutions at the upper limit and in the middle of the grey zone. Belgian colleagues were the first ones to take advantage of this initial targetting of the ALARO-0 plan (going back to the Bratislava workshop). Tests at many scales are ongoing, mostly with encouraging results, but with still too much divergence between the two versions at very high resolution

ARPEGE coupling files were never so-good (absolute and relative statement valid 6 months ago and still improved a bit since [see next slide])

New ARPEGE and ALADIN-MF operational suite (4/2/2009) Modifications of the physical parameterizations Major changes for the parameterized subgrid vertical exchange treatment: Combination of a prognostic turbulent kinetic energy scheme with a parameterisation of the boundary layer top entrainment and a mass flux scheme for shallow convection. (See Eric’s talk for more details) New scheme (ECUME) to compute oceanic’s flux 6 spectral intervals (instead of 2) in the short wave radiation scheme Change of the stratospheric ozone’s climatology (Fortuin and Langematz 1994) New observations used in ARPEGE 4DVAR 64 IASI channels over sea, 50 over land and 32 over sea ice Instead of 50 channels only over sea in the previous operational version Use of MODIS wind from CMS (available more rapidly)

Some impacts of the modifications Cloud cover along the GEWEX Pacific cross section Old operational model New operational model Eastern stratocumulus are now predicted Heidke Skill Score for precipitations of the old (black) and new (red) operational ALADIN-France on August, September and October 2008 New ozone climatology: Reduction of the stratospheric warm bias

Expected improvements from 6/09 e-suite New resolution T798 L70 (10km over France) New resolution for ALADIN-MF (8km, L70) 3 updates in the 4DVAR T107/15 T224/15 T323(or T399)/25 (instead of T107/25 and T224/30) Use of linear stratiform precipitation scheme and linear GWD in minimizations Revised tuning of observation and background error variances, based on objective diagnostics. Use of a 4D-Var ensemble (with 1 minimization, instead of the 3D-Fgat ensemble), at resolution L70 T399c1 (instead of L60 T359c1), with spatial correlations for SATOB perturbations. Use of flow-dependent ensemble background error variances for all variables in the minimization (instead of only vorticity previously), with adapted spatial filtering. Reduction to 125km of the size of the thinning box for satellite data (instead of 250 km previously)

Long-lasting HARMONIE problems The ‘dynamics’ and the ‘DA ancillary’ aspects are understaffed in a long-lasting way. Computing resources for the EPS projects are still a serious concern. The situation for the ‘maintenance’ We must take the ‘best’ out of the tools available on both sides, but we do not (yet) know how to define it; We must better integrate the IFS/ARPEGE constraint in some kind of ‘a-priori’ common thinking for big developments; We have to get a symmetric change of mentality for the joint issues of ‘transversality of developments’ and ‘progression of their integration in the common code trunk’.

Long-lasting HARMONIE problems The situation for the ‘physics’ The characterisation of the lower limit of the grey-zone is still vague; The operational solution for keeping the AROME-France precipitation under control is physically not satisfying (SLHD was not develop with the horizontal smoothing of falling precipitations in mind); ALARO-0 has quite good ‘multi-scale’ results but it fails to give the same results as its ‘resolved convection’ equivalent when tried at high resolution; There is certainly an element of phys-dyn interaction to take into account when trying to improve the situation, but who knows which one? The outcome of the ‘Convergence days’ will help a better work on such issues but alas with delay with respect to the need.

Outlook (De Bilt => Krakow) Shall we correctly manage the decoupling between unproblematic and problematic issues? Shall we manage the correct bridging between ‘convergence’ and ‘internal interoperability’ (both are really ‘slang’ for far more complex processes)? Will the (postmponed) declination “Strategic Document => 4-year Plan => yearly workplan” be successful? QUO VADIS ALADIN HARMONIE (slightly modified repeat of the workshop motto from 4 years ago) ???

Try to keep a part of this mixed bag in mind during the next four days Conclusion Try to keep a part of this mixed bag in mind during the next four days and enjoy all the spirit and strength of such a big gathering of people who know how to both argue and progress together.