EHN 1 CO2 Leaks inside the beam lines

Slides:



Advertisements
Similar presentations
General Rules Compressed gases and cylinders must be properly stored, transported and used to prevent injury and accidents. Compressed gases and cylinders.
Advertisements

Oxygen Concentrators.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Health and Safety Manual Section C3 Cryogens. Cryogens  Fluids which at ambient temperature cannot be liquefied solely by pressure  Include liquid oxygen,
02/06/20141 WHAT ITEM IS COMPOSED OF ? INTEGRATION MODEL DETAIL MODEL SKELETON 3D ENVELOP PART 1 PART 2 PART XXX… EQUIPMENT ITEM INTEGRATION OFFICE RESPONSIBILITY.
Blabo® Automated Tank Cleaning ExxonMobil 2009 Article Electrical standards Designed for operation in hazardous areas. Constructed for zone 1, and some.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
COSHH Control of substance hazardous to health. Becky-May Head & Teresa Brazier.
DGS/SEE Flammable Gas Safety – an update. DGS/SEE New Chemical Safety Rules New SR-C, Chemical Agents. GSI-C1, Prevention and Protection.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
J. Pedersen EN DSO Performance Scientific performance Measurable, reproducible, controllable: Documented presence! Technical performance Measurable,
LH2 Safety Issues for MICE 1.O2/LH2 separation 2.No Ignition sources near LH2 3.Adequate ventilation 4.Affects: Windows: absorbers and vacuum Primary and.
Metal Fabrication Oxygen & Acetylene Integra ® Cylinders 2014.
GAS FREE INSPECTION 7.4. ENABLING OBJECTIVES DESCRIBE the pre-inspection procedures and safety precautions when conducting GFE operations DESCRIBE the.
SOME CEDAR NEWS Lau Gatignon / EN-MEF TD meeting 12/07/2011  Summary of HAZOP and Zoning meeting  Forthcoming CEDAR related work at CERN.
Clean up your act! Do you have a garage or basement that looks like this? Do you know where to get rid of all of this stuff?
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
1.Definition 2.Examples 3.Hazards 4.Signage 5.Rule and permit 6.The role of the TSO HSE Unit - Olivier Prouteau CONFINED SPACES Updated in January.
Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
PROTECTING THE WORKER PROTECTIVE CLOTHING Need for clothing
NA CONSOLIDATION & SAFETY SYSTEMS
Test beam check list Michael JECKEL EN-EA-EC.
CRG - TM Special OdH Introduction
Use Of Personal Protective Equipment
Safety Topic Are YOU The Hazard? Quality Testing Services.
ODH Risk Assessment underground gallery B887-EHN1
Neutrino Platform Overall Protodune Risk Mitigation Plan O
Dielectric Oil Installations
Chemical Safety Course (TSOs)
Safety Documentation EHN1
Gas System Commissioning
ATLAS Safety EP-ADO Meeting EDMS: 11 July 2017.
Chemical Safety Course (TSOs)
Budget specification EHN1 Extension: Infrastructure (WG2)
EN-CV Progress EHN1 Extension Project
Tracker cooling loop “check out” draft for discussion
Lead bricks painting General procedure and its practical application
East Area Renovation Project team #6 Launch safety agreement
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
Safety rules for works supervisors
HL Consolidation Day Analysis of needs from BE-ICS
Test beam check list Michael JECKEL EN-EA-EC EDMS:
7 Powerful Electrical Safety Slogans.
U.S.D.A. FOREST SERVICE REGION 6
DID YOU KNOW IT’S NOT JUST WHAT TO WEAR, IT’S ALSO WHEN AND WHERE TO WEAR IT. The above is true of all Personal Protection Equipment. And it’s particularly.
For questions or more information, Contact EHS at
Tapping a Pipe.
For questions or more information, Contact EHS at
(name) (number) Hazard Analysis and Risk Assessment Operations
ODH Phase 1 Hazard Analysis, Monitor Placement, Installation Progress.
Parker domnick hunter. Safety of Electrical and
North Area Safety Review 2019
Summary of the presentation:
Access Control for CERN Experimental Areas
Risk Management Student Powerpoint
EA Equipment for East Area Renovation
Edwards S1, Arklay C1, Crameri S1, May A2, van Driel R1 and Hyatt AD1.
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

EHN 1 CO2 Leaks inside the beam lines D.Jaillet EN-EA-CT

CO2 Leak in H8 (PPE148) Middle June leak of CO2 inside H8 (PPE148) CO2 gas pipe disconnected to the XCET 042.519 CO2 manual valve open (Leak flow estimated: ~ 12m3/h) A2 and EDMS 1817641 v.1(Incident report) PPE 148 :XCET PPE 158 :Panneaux CO2 EDMS : 1810223 v.1

Proposal:ODH-CO2 Hazard in beam lines ODH Risk assessment(Should be performed): PPE 148 PPE 132 PPE 124 PPE 152 Mitigation measures: Portable/fix detector + Signage of the PPE(Risk of oxygen deficiency-Risk of high CO2 concentration) Flow monitoring Locking the valves (Request to be open) EDMS : 1810223 v.1

Reminder/Recommendation Personal protective equipment Follow the safety rules Do not touch if you don't know HSE will send a SAFETY BULLETIN about the compression fitting connector  Check them If you need help(Gas for experimental area ) Contact gaz.service@cern.ch EDMS : 1810223 v.1

Thank you