UPO meeting Nov. 29, 2013 D. Contardo, J. Spalding News

Slides:



Advertisements
Similar presentations
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Advertisements

DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
1 News and Miscellaneous UPO May Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
1 Framework Programme 7 Guide for Applicants
REVIEW OF NA61 SOFTWRE UPGRADE PROPOSAL. Mandate The NA61 experiment is contemplating to rewrite its fortran software in modern technology and are requesting.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.
Ian Bird LHCC Referee meeting 23 rd September 2014.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Cost scale for phase 2 o June Upgrade.
25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Phase 2 muon plans (presented at ECFA),  What’s new since Upgrade Week  New.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 News and Miscellaneous UPO Apr Didier Contardo, Jeff Spalding News from Oct. RRB HL-LHC Pile-up for simulation Upcoming events: DESY week – Taipei.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
SIF II Briefing Session 21 st September Briefing Session Content SIF Cycle I – overview Funding and arising issues SIF Cycle II – Process for evaluation.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
DPS/ CMS RRB-T Core Software for CMS David Stickland for CMS Oct 01, RRB l The Core-Software and Computing was not part of the detector MoU l.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
News and Miscellaneous UPO Nov Didier Contardo, Jeff Spalding 1 UPO Nov L1-Trigger TDRs -Upcoming Proposals for Phase 1 -CMS week Dec.
27-Jan-2014 Upgrade Steering Group “Update on Phase 2 TP - muons” J. Hauser, UCLA  Update on progress for TP:  2 slides follow to be shown at USG02 (Upgrade.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Marco Cattaneo, 3-June Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
Padova, 10 Febbraio 2014 ALICE ITS Upgrade Visita Referee - Sezione di Padova.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Marco Cattaneo, 20-May Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
Workshop Structure-Detector Agenda structure similar to last two meetings –Two subsystem parallel sessions today and tomorrow –ETD, DGWG, Simulation Parallel.
News and Miscellaneous Didier Contardo, Jeff Spalding UPO August 03/ UPO 08/03/12.
Bow Basin Watershed Management Plan Revised Terms of Reference
Principal Investigator ESTCP Selection Meeting
Dutchess Community College Middle States Self-Study 2015
Organization and Goals for the Workshop
Ghana Statistical Service
Taught Postgraduate Program Review
Introduction/Background Aim of the assessment was to assess the impact of the 3 institutions MOHCDGEC, PO-RALG and MOFP in the flow of funds from national.
IT-CM Group Meeting Tim Bell 12th January 2016
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
News and Misc UPO Meeting Jan 16, 2012
Updating the Regulation for the JINR Programme Advisory Committees
Tracker Upgrade Simulations Software Harry Cheung (Fermilab)
Principal Investigator ESTCP Selection Meeting
CMS November Upgrade Week
Upgrade Strategy for the Experimental Vacuum Systems
Twelfth Policy Board meeting Lima, Peru 8-9 July 2014
Francesco Forti University and INFN, Pisa
Enterprise Content Management Owners Representative Contract Approval
Strategy document for LHCC – Run 4
What Reviewers look for NIH F30-33(FELLOWSHIP) GRANTS
Status report on the activities of TF-CS/OTA
WG Belgian Grid Implementation Network Codes.
Preparations for a Lehman Review
IS&T Project Reviews September 9, 2004.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
X-DIS/XBRL Phase 2 Kick-Off
Delta Long-Term Management Strategy
Update on ATLAS insertable B-layer
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Overall Project RAG Status:
Taught Postgraduate Program Review
Preliminary Project Execution Plan
Executive Project Kickoff
Matter and Technologies
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

UPO meeting Nov. 29, 2013 D. Contardo, J. Spalding News UPO meeting Nov. 29, 2013 D. Contardo, J. Spalding News - ECFA workshop follow-up - LHCC Upgrade Cost Group - Follow-up of MB - CMS week - TP studies - TP preparation - see presentation of Jeremy

ECFA High Luminosity LHC Experiments Workshop The report on the workshop has been submitted to ECFA and presented at the plenary session on Nov. 21 - it will also be presented to the SPSC Dec. 10 and then as information to the CERN Council Dec. 13 Contains introduction Preparatory Group summaries Physics summary of all studies as a longer attachment The report has an ECFA reference It will be available in the ECFA CDS public server - temporarily you can find/reference it in the public CMS DocDB at: https://cms-docdb.cern.ch/cgi- bin/PublicDocDB//ShowDocument?docid=12141 A number of areas for improved communication or possible common actions are mentioned as well as some proposal for follow-up There is no defined framework or mandate for the cross-activities as launched for the workshop - Phil and Didier will discuss with PG chairs - within collaboration and with the workshop program committee on how to follow-up

We should expect that the TP will be similarly scrutinized Upgrade Cost Group The LHCC recommends approval to the CERN Research Board A new review group which includes members of LHCC and others will now review the cost- related information and recommend to the Research Board - chaired by Stew Smith 1. “Budget explanation and justification” section to help us understand the important requirements, tradeoffs, etc. in reaching the final design, and their impact on the cost. 2. WBS chart down to at least level 2, showing costs, allocation responsibilities, expected funding sources, bases for estimates, etc. for the major subsystems (aka parts or components) of the upgrade project. In the hope it’s helpful, I’ve drafted the attached template WBS chart to indicate what information we seek. 3. “WBS-like” manpower survey indicating the “expert” manpower resources needed, e.g. physicists, computing and software professionals, CERN technical groups, etc. [Draft template attached.] 4. Resource-loaded schedule that shows the duration of the major tasks, manpower required, and sources of the manpower. 5. Risk register, giving the likelihood and impact of each significant risk, and your strategy and plans for mitigation. [Again, a draft template is attached.] 6. List of resources requested from the upgrade common fund, e.g. receiving, installation, commissioning. 7. Spending profile by year. L1-Trigger TDR is the first project to be reviewed - cost & resource based sent last Mon. - meeting with the committee Dec. 2 - UCG will report to the LHCC at the Dec 4 meeting (and presumably to the RRB after that) We should expect that the TP will be similarly scrutinized

MB follow-up: LHCC LHCC Report to the RRB https://cms-docdb.cern.ch/cgi-bin/DocDB/ShowDocument?docid=12097 “The LHCC congratulates CMS on outlining the scope of the upgrades and providing a costing. While it is too early for detailed comments prior to the Technical Proposal, the LHCC notes that CMS seeks to maintain computing costs as they are (i.e. flat) or even decreasing. Although traditionally the computing costs are covered as operating costs. “ “ Likewise, the funding for detector R&D is traditionally outside of the formal project and thus was not covered as part of the documentation to be provided to the RRB. The LHCC notes that it would be useful to have an assessment of the areas of technical and financial risk where R&D is especially needed and the degree to which R&D programmes can be conducted in common with other experiments. The success of the upgrade depends on technical progress in all areas” “The LHCC looks forward to seeing the full Technical Proposal and accompanying physics studies, including justifications for the detailed designs proposed for all major elements of the upgrade that need replacement.” It was proposed at the management board to present our R&D activities at LHCC meeting of Mar 5 Present preview at LHCC meeting Jun 4

MB follow-up: R&Ds - Forward Calorimetry R&D programs oversight - proposal at last UPO and presented to the MB Projects/Coordinations/WGs/R&D projects Develop R&Ds programs according to CMS scope - organize and monitor progress - report regularly to CMS (dedicated presentations in upgrade plenaries) Upgrades Project Management Validate R&D programs with respect to CMS scope - interest Maintains central documentation Need to develop resource by the LHCC - You are invited to prepare material by end of January as discussed in previous UPO it could contain the following, and any other relevant information: List of the project R&Ds & relevance to the scope of the project - framework (collaborations in CMS or outside) - institutional responsibilities - resources available - milestones & schedule Forward Calorimetry It was requested at the last MB that we report in January on the review process We are in the process of setting a review committee and charge for the review As input to the charge, we need by the CMS week a written proposal of the roadmap proposal from the FD group and advisory panel

MB follow-up: Muons - Longevity - Organization in 2014 It was requested at the last MB that we clarify by March the scope of upgrades Discussion to organize for TP delivery are on going - must converge by CMS week Longevity of detectors It was requested at the last MB that we report in March on longevity aspects for all parts of CMS - and especially on ongoing studies for non obvious cases and systems - This should be part of the TP Upgrade organization for 2014 It was requested at the last MB that we clarify the organization for the forward detectors upgrade - the point for discussion was essentially the definition of a coherent configuration of all detectors for installation at P5. This was part of the proposal, it will be re-formulated and discussed. The discussion on Physics for organization for the TP studies is ongoing we expect to converge by CMS week - on scheme if not yet on names This is a good time for adjustments to the present organization as was discussed at the last UPO and well received at the MB - this must not delay the work for the TP and the present organization runs up to the time we have made a smooth transition In some places, this organization will be again reviewed once the scope of upgrades is fully defined (beyond the TP)

CMS week Dec. 9 Wednesday Dec 11 Thursday Dec 12 Friday Dec 13 Upgrade Simulation Studies (FutPhys + USSTF) 9:00-12:30 Upgrade Plenary 13:30-16:00 see next slide Thursday Dec 12 Trigger PSWG 9:00-11:00 Forward DWG 10:00-13:0 FCAL Meeting 14:30-18:30 Friday Dec 13 Upgrade Simulation Task Force Meeting 14:00-18:00 Please provide feed back if needed

CMS week Dec. 9 Upgrade Plenary 13:30-16:00 Follow-up to October Upgrade Week Proposal for presentations - should be focused and no more than 20’ :  Define detailed TP content - see presentation of Jeremy - including specific topics mentioned below Tracker (Strips and Pixels)  focus on pixel and development of software for TP studies ECAL  motivation - longevity - performance at 140 PU of current detector and upgrade of EE HCAL/HF  motivation - longevity - performance at 140 PU of current detector Forward detector  proposal of forward configuration for TP studies Muons  proposal for organization and to develop the case for DT minicrates and forward Trigger/DAQ  proposal for architecture and status of studies

TP study concerns Frank Chlebana created a twiki to list the need and people signed up https://twiki.cern.ch/twiki/bin/viewauth/CMS/Phase2SimulationTaskList Progress, but several tasks not yet populated We are trying to establish a resource loaded schedule We still miss major pieces What are the studies you want to perform and what is the software existing/missing This is needed to progress stepwise with dedicated releases and MC samples Then Final tracker BE5 geometry and working tracking at 140 PU This is preventing progress to develop overall reco and b-tagging Implementation of geometry Full/Fast Sim for shashlik EE and HCAL refurbishment This is preventing progress to develop overall reco… These two pieces are mandatory for generating MC samples for Physics motivation Then (to be developed in parallel) Pixel extension and associated reconstruction EE shashlik and HE refurbishment with extension Muon extension with matching to Pixel extension tracks And (to be developed in parallel) Generic muon chambers to demonstrate spatial vs timing resolution in fwd # of chambers… Muon Phase 1 emulation for Trigger studies - eventually Phase 2 emulations for all detectors … PFCAL and CFCAL are standalone effort but with link to development of geometries and reconstruction this should not be forgotten please report on software developments in the USSTF TPSG/TTI will provide menu and trigger thresholds including new tracker - muons - bandwidths