Bihar Watershed Development Society (BWDS)

Slides:



Advertisements
Similar presentations
Govt. of Odisha Institutional and Capacity Building in Implementation of Watersheds in Odisha.
Advertisements

Presentation on BGREI NABARD Bihar Regional Office 17 May 2013.
Presentation to the Steering Committee on Integrated Watershed Management Programme Proposals for State: …….. Date: …………
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
The Social Audit Status
The structure is intended to secure minimum information for appraisal of new projects by the Steering Committee for IWMP. States are free to bring forth.
I shall pass through the world But once, If therefore There be any kindness I can show or Any good thing, I can do Let me do it now Let me not defer it.
NRHM DISTRICT ACTION PLANS PARTICIPATORY & EVIDENCE BASED PLANNING PROCESS.
Presentation on Annual Action Plan for IWMP STATE: MEGHALAYA 1.
Crops Division Department of Agriculture & Cooperation Ministry of Agriculture
CONVERGENCE OF MGNREGA DEPARTMENT OF AGRICULTURE GOVERNMENT OF TRIPURA.
West Bengal IWMP Annual Action Plan
ADOPTION OF IMPROVED TECHNOLOGY FOR EFFICIENT USE OF WATER, NUTRIENTS AND PLANT PROTECTION CHEMICALS GROUP –II Dr. D.G. Bakwad Director Hoticulture National.
Disaster Risk Reduction Experiences and Lessons Learned from MERET Arega Yirga 13 October 2014 Addis Ababa.
Brief on Project Development Objectives (PDO) The PDO describes the outcomes for which a project can be held accountable, given the project’s duration,
Presentation to the Steering Committee on Integrated Watershed Management Programme Proposals for State: …….. Date: …………
NIGERIA Developing CSA within the NAIP while reinforcing inter-sectoral consistency: progress, bottlenecks and support needs With technical facilitation.
Paramparagat Krishi Vikas Yojana (PKVY)
Integrated Watershed Management Programme State Level Nodal Agency Uttarakhand WMD, Dehradun.
Ministry of Water Resources Government of India.
1 1 STRATEGIES FOR ENHANCING FOOD GRAIN PRODUCTION Formulation of Krishi Karman Award Department of Agriculture MANIPUR.
National Conference of Project Directors of District Rural Development Agencies 23 rd June, 2011.
ABOUT BIHAR WATERSHED DEVLOPMENT SOCIETY (BWDS) AS SLNA 1.Formation of BWDS (SLNA) vide notificationNo. 264 dated Registration of the BWDS.
Objectives  Convergence of investments in irrigation  Enhance access to irrigation  Integration of water source, distribution and application  Improved.
World Bank Assisted Watershed Management Project (WBWMP) ‘Neeranchal’ in Support of IWMP Department of Land Resources Ministry of Rural Development.
Background information regarding IWMP Integrated Watershed Management Programme (IWMP) 1.A. Institutional preparedness - Physical: i. A brief description.
Krishi Karman Award Agriculture Department Odisha.
CAPACITY BUILDING PLAN MODULES OF TRAINING. Annexure.
Journey of Watershed Approach in India B. Pradhan Department of Land Resources Ministry of Rural Development Govt. of India B. Pradhan Department of Land.
Ground Realities of Convergence for Agriculture Development By Dr. J.S. Samra CEO, NRAA, New Delhi
On 20 th & 21 st Nov, 2015 at Hyderabad SLNA, KERALA.
Pradhan Mantri Krishi Sinchayee Yojana
Dr Ranu Rani Sethi Senior Scientist ICAR-IIWM, Bhubaneswar, Odisha District Irrigation Plan (A case study of Nayagarh district of Odisha)
NEERANCHAL National Watershed Management Project to support the Watershed Component of the PMKSY (erstwhile IWMP) ( )
RECENT EFFORTS AT ENHANCING SOCIAL SECURITY FOR UNORGANIZED WORKERS IN INDIA.
BS3: FINANCING OF IRRIGATION PROJECTS 6 th April, 2016 INDIA WATER WEEK by R. K. Agrawal Senior General Manager.
Format for Presentation on Innovative Practices for States TWO DAYS CONFERENCE OF CEOs OF SLNA STATE :GUJARAT TO REVIEW IMPLEMENTATION OF WDC-PMKSY (ERSTWHILE.
COMMERCIAL BANKS & ECONOMIC DEVELOPMENT. Economic Development may be defined as a process whereby an economy’s National Income is carried on from a lower.
Experiences of “Jal Kranti Abhiyan” in Indus Basin Organisation, CWC BY : SAMIR KUMAR SHUKLA DIRECTOR, M&A DIRECTORATE, CWC, JAMMU Ministry of Water Resources,
Institutionalizing People’s Participation in Water Resources Planning & Manageme nt- गाँव बढ़े तो देश बढ़े Taking Rural India >> Forward.
Pradhan Mantri Krishi Sinchayee Yojana. Land &Water Resource (2012)  Total Precipitation 4000 BCM  Utilizable 1123 BCM(SW 690, GW 433)  Utilized634.
(Additional Commissioner)
Pradhan Mantri Krishi Sinchayee Yojana
18th March,2017 Shimla, Himachal Pradsh
Integrated Watershed Management Programme- A platform for convergence
Interventions and strategies farming through better input
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
Proposals for State: ……..
Chair : Hon’ble Secretary Secretary / Chief Executive Officer (CEO)
ANNUAL ACTION PLAN INTEGRATED WATERSHED MANAGEMENT PROGRAMME
On Farm Water Conservation Mission Jalyukt Shivar Abhiyan
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)-“Per Drop More Crop”
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY)
Pradhan Mantri Krishi Sinchayee Yojana
Proposals for State: ……..
Land &Water Resource (2012)
CHIEF EXECUTIVE OFFICER STATE LEVE NODAL AGENCY TAMIL NADU
For internal circulation and discussion only
DEPARTMENTOF AGRICULTURE, KERALA
Ministry of Water Resources, River Development and Ganga Rejuvenation
Water and Economic Growth
RABI CONFERENCE Dialogue with states SEPTEMBER 19TH & 20TH ,2017 SHC
CADWM Programme and Present Day Challenges
Commissioner MoWR,RD&GR
Paramparagat Krishi Vikas Yojana (PKVY)
Presentation by Disaster Management Department, Government of Bihar
Department of Agriculture Cooperation & Farmers Welfare
Shri Vikas Deshmukh, Commissioner, Agri,
Presentation transcript:

Bihar Watershed Development Society (BWDS) PMKSY Bihar Watershed Development Society (BWDS)

Need for PMKSY Achieving the goal of bringing irrigation water to every farm, there is need to converge all ongoing efforts, put all efforts under one umbrella and to bridge the gaps through location specific innovative interventions. Government is committed to giving high priority to water security. It will complete the long pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee Yojana’ with the motto of ‘Har Khet Ko Paani’. There is a need for seriously considering all options including linking of rivers, where feasible; for ensuring optimal use of our water resources to prevent the recurrence of floods and drought. By harnessing rain water through ‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and ground water recharge. Micro irrigation will be popularised to ensure ‘Per drop - More crop’ .

Objectives of PMKSY Achieve convergence of investments in irrigation at the field level (preparation of district level and, if required, sub district level water use plans). Enhance the physical access of water on the farm and expand cultivable area under assured irrigation (Har Khet ko pani), Integration of water source, distribution and its efficient use, to make best use of water through appropriate technologies and practices. Improve on-farm water use efficiency to reduce wastage and increase availability both in duration and extent, Enhance the adoption of precision-irrigation and other water saving technologies (More crop per drop).

Objectives of PMKSY Contd. Enhance recharge of aquifers and introduce sustainable water conservation practices Ensure the integrated development of rainfed areas using the watershed approach towards soil and water conservation, regeneration of ground water, arresting runoff, providing livelihood options and other NRM activities. Promote extension activities relating to water harvesting, water management and crop alignment for farmers and grass root level field functionaries. Explore the feasibility of reusing treated municipal waste water for periurban agriculture, and Attract greater private investments in irrigation.

Objectives of PMKSY Convergence of investments in irrigation Enhance access to irrigation Integration of water source, distribution and application Improved on-farm water use efficiency Enhance the adoption of precision-irrigation Water conservation & ground water recharge Development of rainfed areas through watershed approach Extension activities & IEC application Treatment of municipal waste water for peri-urban agriculture Greater private investments in irrigation

PMKSY Started from 2015-16 Funding Pattern 60:40 DIP & SIP have to be prepared

PMKSY (Har Khet ko Pani) PMKSY( Per drop More Crop) Components of PMKSY PMKSY (Har Khet ko Pani) ü Surface Minor Irrigation AIBP ü Command Area Distribution ü Water Diversion System üMedium & Major Projects ü Lift Irrigation,Ground water dev. ü National Projects ü Traditional Water harvesting, RRR of water bodies PMKSY( Per drop More Crop) On farm water mgmt. Precision irrigation Dist./State irrg. Plan Extension Activities Coordination & Monitoring PMKSY (Watershed) Soil & Moisture Conservation Rain water harvesting Runoff Mgmt & Treatment Livelihood support activities

Districts Covered under PMKSY- WD S.No. District 1- Banka 8- Kaimur 2- Jamui 9. Patna 3- Munger 10. Nalanda 4- Gaya 11. Arwal 5- Nawada 12. Jehanabad 6- Rohtas 13. Shiekhpura 7- Aurangabad 14. Lakhisarai

Pradhan Mantri Krishi Sinchai Yojna – Watershed Development (PMKSY-WD)

Project Sanctioned under PMKSY-WD (IWMP) No. of Micro - Watersheds Sl.No. Year No. of projects No. of Micro - Watersheds Treatable Area (Ha.) Project Cost (In Lakh) 1 2011-12 40 401 191797.47 23015.688 2 2012-13 24 240 120195.54 17720.960 3 2013-14 26 267 136414.07 19973.372 4 2014-15 33 395 164719.73 23444.380 Total 123 1303 613126.81 84154.400

Pradhan Mantri Krishi Sinchai Yojana- Watershed Development (PMKSY-WD) Centrally sponsored scheme Contribution till 2014-15 - [GoI – 90% & GoB – 10%] Contribution from 2015-16-[GoI-60%&GoB- 40%] Being implemented in 8 districts of Bihar from 2011-12/ 2012-13/ 2013-14 (batch – III / IV/ V) and 6 new districts have been added in 2014-15 (batch - VI). District Watershed Committee (DWC) under chairmanship of District Magistrate monitors the watershed programme. Deputy Director, Soil Conservation of the district is over all incharge of this programme. Implementation period- 5 - 7 Years.

GoI Support GoI Fund – Project Fund – 60% (till 2014-15 it was 90%) Institutional support fund – 100% Project Fund: Expenditure on execution of project based on DPR duly approved by Gram Sabha and district level watershed committee and finally approved by BWDS management committee. Institutional Fund- For salary, TA, DA, etc for contractual experts and employees of SLNA / WCDC.

Directorate of Soil Conservation (Agriculture) Fund Flow Previous At Present GoI GoI GoB SLNA Directorate of Soil Conservation (Agriculture) WCDC SLNA PIA WCDC WC WC

Institutional Arrangement Managing Committee – Under chairmanship of Development Commissioner Headquarter Level – BWDS as State Level Nodal Agency (SLNA) along with support of 11 experts / employees. District Level – WCDC (Watershed Cell-cum- Data Centre) under District Nodal officer – cum – Deputy Director, Soil Conservation. Project Level- PIA (Assistant Director, Soil Conservation, / ASCO executes these projects). Micro watershed Level – A watershed Development Team (WDT) consisting of Agril, Finance, Engg. & Livelihood Expert helps Watershed Committee. Watershed Committee - At micro watershed level a committee of 11 members led by Mukhiya and a paid Secretary.

Staff at SLNA (Headquarter) Level S. No Designation No. of Sanctioned Posts 1 Administrative Officer 2 Technical Expert (W/s) 3 Technical Expert (Livelihood) 4 Finance Officer 5 Accountant 6 Assistant 7 GIS Expert 8 Programmer 9 Data Entry Operator Total 11

Staff at Watershed Cell – Cum-Data Centre (WCDC) District Level S. No Designation No. of District Covered No. of Sanctioned Posts 1 Technical Expert 14 1 x 14 2 Accountant 3 Data Entry Operator Total 42

Thank You