WEST RAND DISTRICT MUNICIPALITY

Slides:



Advertisements
Similar presentations
AMERICAN EXPERTISE AND TECHNOLOGY IN WASTEWATER AND WATER SECTOR WASTEWATER AND WATER INVESTMENTS IN TULCEA COUNTY, ROMANIA.
Advertisements

Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
1 Scope 1.18km of sewers (500mm to 3000mm dia) 2.2 lift stations 3.Demolition of 4 pumping stations – Jurong West, Jalan Bahar, Corporation and International.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
JULY BUDGET WORKSHOP NO FISCAL YEAR ENTERPRISE FUNDS Innovation will serve to keep the plan in the forefront of all that we do. Our actions.
INFRASTRUCTURE DEVELOPMENT BILL 15 JANUARY 2014 Tshidi Moalusi and Zama Nkabinde Group Legal Services Group Governance Portfolio.
SIP 18 WATER AND SANITATION MASTER PLAN Water and Sanitation Master Plan NDHS and DWA Water & Sanitation Master Plan.
1 WATER POLLUTION & WATER CHALLENGES PUBLIC HEARINGS 18 JUNE 2008 NGWATHE LOCAL MUNICIPALITY Presented By Mr. M.J. Toona.
DWA CORPORATE IDENTITY Presented by: Johan Maree Deputy Director: Media Production 12 December 2012 RBIG, NTP AND ACIP Quarterly Workshop GAUTENG Presented.
DEPARTMENT OF COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS PRESENTATION TO THE PORTFOLIO COMMITTEE Municipal Infrastructure Grant (MIG) Projects and.
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
11 ICLEI / NMBM DROUGHT / FLOODING WORKSHOP WATER & SANITATION B.J. Martin 25 September 2013.
2006 Technical Affairs Water Projects Department.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
WS Infrastructure Programme
TECHNICAL OVERSIGHT MONITORING AND SUPPORT VISITS ON REGIONAL PROJECTS: 2014/15 Prepared by: R. Gillmer Chief Engineer : Technical Support 21 August 2014.
Orange County Utilities Department Water and Wastewater Budget Challenges March 9, 2010.
1 O.R TAMBO DISTRICT STATUS ON WATER QUALITY Presentation to: Parliamentary Portfolio Committee on Water Affairs and Forestry Date: 18 June 2008 By: Executive.
14/10/2015European Agency for Reconstruction1 Water & environment.
SUMMARY OUTCOMES OF THE PROVINCIAL WATER INDABA Some emerging issues for the sector WSLG 19 November
City of Greeley Water & Sewer Department ● th Street, Suite 300 Greeley, CO ● (970) Making More Water Available.
DWA CORPORATE IDENTITY Presented by: Johan Maree Deputy Director: Media Production 12 December 2012 RBIG, NTP, ACIP, MWIG Quarterly Workshop Western Cape.
1 Presentation to the Portfolio Committee: Water & Environment Presentation by Mr Trevor Balzer Programme Manager: Special Projects 16 – 17 March 2010.
Nancefield station precinct
WS Infrastructure Programme Quarterly Workshop GAUTENG REGION Presented by: Jabulani Maluleke RBIG Project Manager: Date: 31 – 01 October 2013.
PRESENTATION TO PARLIAMENT 14 May Amounts allocated as per the DORA.
DCoG Presentation to the Appropriations Committee HEARINGS ON THE MEDIUM TERM BUDGET POLICY STATEMENT 2 November 2010.
MHLATHUZE WATER PRESENTATION OF THE 2006/2007 ANNUAL REPORT TO THE PORTFOLIO COMMITTEE Presented by: Ms Dudu Myeni (Chairperson) Mr Lawrence Nachito (General.
1 Presentation to the Portfolio Committee: Water & Environment Presentation by Mr Trevor Balzer Programme Manager: Special Projects 16 – 17 March 2010.
Progress Report: Bulk Infrastructure Task Team Premier’s Co-ordinating Forum November 2009.
1 Response to Financial and Fiscal Commission Submission for The Division of Revenue 2010/2011 Presentation to Select Committee on Finance 06 August 2009.
MUNICIPAL STATUS QUO REPORT:FOCUS ON SERVICE DELIVERY AND FINANCIAL MANAGEMENT PRESENTATION TO PARLIAMENTARY POTFOLIO COMMITTEE ON CoGTA 23 JUNE 2015.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON SPORT AND RECREATION MUNICIPAL INFRASTRUCTURE GRANT By Molatelo Montwedi Date: 14 June 2005.
6/3/11 1 DEPARTMENT OF WATER AFFAIRS “Progress in the Accelerated Community Infrastructure Programme (ACIP)” Briefing to the Select Committee on Land and.
PRESENTATION TITLE Presented by: Name Surname Directorate Date Briefing the Portfolio Committee on Water and Sanitation on Interventions to improve water.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
Gauteng Department of Human Settlements Presentation 4th Quarter Report April 2016.
WATER DEMAND MANAGEMENT INITIATIVES RETROFITTING OF HOUSES.
Capital Expenditure Programme Tariff Consultation 10 October 2016
Asset Degradation Modelling at Townsville Water
I INTRODUCTION AND PROVINCIAL CONTEXT
Presented by Wiseman Sibiya
Municipal Water Infrastructure Grant (MWIG)
Portfolio committee May 2007 MEC JF van Wyk
OBJECTIVES To find assistant with allocating the right sampling points according to SANS 241 To find assistant with WSP.
Water and Wastewater Rates
RAND WATER’S PRESENCE IN Mpumalanga
Public Works/Municipal Utilities Department
LEPELLE NORTHERN WATER BOARD ANNUAL REPORT 2015/16 & DWS INTERVENTION PROJECTS 24 FEBRUARY 2017.
Overview of the CoJ Water & Sanitation Master Plan
TSHWANE BETHAL CARLETONVILLE JOHANNESBURG VEREENIGING SASOLBURG WINTER VELD RUSTENBURG BRITS HEILBRON Service Area Consumers million Area
Overview of the Tshwane Water & Sanitation Master Plan
Municipal Infrastructure
WATER SUPPLY & SEWERAGE AUTHORITY Bethlehem-Biet Jala-Biet Sahour
Gauteng Department of Human Settlements
Water and the medium term budget policy statement
Capricorn District Municipality
HOUSING PERFORMANCE REPORT 07/08 (3rd Quarter)
OPERATIONAL AND FINANCIAL HIGHLIGHTS 2001/2002
Capital Expenditure Programme
Recognising and managing the key challenges in water service delivery
WASTEWATER MANAGEMENT 19 September 2018
Best Practices in Operation and Maintenance of Waste Water Treatment
Capital Expenditure Programme
Green Drop KPA Score Allocation
Parliamentary climate change hearings
Gauteng Department of Local Government
PARLIAMENTARY PRESENTATION 6TH MAY 2008
City of Spruce Grove Capital Region Partners Presentation 2019
Presentation transcript:

WEST RAND DISTRICT MUNICIPALITY GAUTENG REGIONAL WORK SESSION FOR DEVELOPING THE NATIONAL WATER & SANITATION MASTER PLAN WEST RAND DISTRICT MUNICIPALITY DATE: 16 AUGUST 2017

INDEX Background Water & Sanitation Programmes Challenges

BACKGROUND The West Rand District Municipality consists of the following: Mogale City Local Municipality Rand West City Local Municipality (Randfontein & Westonaria) Merafong City Local Municipality All LM’s are WSA’s

WATER & SANITATION PROGRAMS WITHIN THE WEST RAND LM PROJECT NAME SIZE BUDGET BUDGET ALLOCATED MCLM Lindley / Muldersdrift Area - Reservoirs 3 x 15-20Ml R 100M No Lindley / Muldersdrift Area – Bulk pipe lines +- 50km R 125M Hekpoort Area - Reservoirs 1 x 10-15Ml R 35M Hekpoort Area - Bulk pipe lines +- 30km Magaliesburg & Tarlton Area - Reservoirs 2 x 10-15Ml Magaliesburg & Tarlton Area - Bulk pipe lines +- 15km R 70M Kagiso & Krugersdorp Area- Reservoirs Kagiso & Krugersdorp Area- Bulk pipe lines +- 20km R 50M

WATER (Cont.) LM PROJECT NAME SIZE BUDGET BUDGET ALLOCATED RWCLM Westergloor Reservoir 6,8Ml R 150M No Finsbury Reservoir 3,0Ml R 50M Zuurbekom Reservoir 22Ml R 120M Bekkersdal Reservoir 12Ml R 30M Reservoir Zone Metering - MECLM Fochville / Koksi Area – Reservoir & Water Tower 30Ml R 159M Varkenslaagte & Khutsong South Reservoir & Bulk Pipe Lines 11,75Ml R 76M Khutsong Reservoir & Bulk Pipe Lines R 85M Wedela Reservoir – PRV Refurbishment R 1M

SANITATION LM PROJECT NAME SIZE BUDGET BUDGET ALLOCATED MCLM Lindley Wastewater Treatment Works & Reclamation Facility 200Ml/day R 1,5B No Muldersdrift Bulk Outfall Sewer - Pine Haven to Lanseria Various R 116M Hekpoort Wastewater Treatment Works & Reclamation Facility 7Ml/day R 178M MIG BP Hekpoort Bulk Outfall Sewer with pump-stations - R 45,4M Magaliesburg Wastewater Treatment Works R 60.8M Magaliesburg Bulk Outfall Sewer from Tarlton & Koster R 64,2M Flip Human Wastewater Treatment Works Reclamation of effluent to Zuurbekom GIFA to assist with Bankability & Feasibility Studies Accredited Water & Sanitation Laboratory R 50M

SANITATION (Cont.) LM PROJECT NAME SIZE BUDGET BUDGET ALLOCATED RWCLM Zuurbekom Waste Water Treatment Works 80Ml/day R 1,0B DWS Upgrade Randfontein WWTW 30Ml/day R 150M No Upgrade Badirile WWTW 10Ml/day R 100M MIG BP Refurbishment Sewer infrastructure: Mohlakeng, Toekomsrus & Bekkersdal Various R 200M R 1,2M design from MIG MECLM Upgrade Koksi WWTW & Pump Station 7,5Ml/day R98,5M Varkenslaagte & Khutsong South WWTW & Outfall Sewer (800mm dia). R 375,7M (Total Three Phases). Refurbishment Oberholzer / Carletonville WWTW – Mechanical & Electrical Components - R2,0M Refurbishment Wedela WWTW –Electrical Components & Upgrade Outfall Pipe Line R50M

CHALLENGES Funding – capital & Operational Shortage of skills – Technical & Operational Drought – Water Restrictions Electricity cost Land availability Ageing Infrastructure Dedicated Water Loss Divisions Telemetry Equipment

Thank You