HQ02b Preload Increase - Summary

Slides:



Advertisements
Similar presentations
HQ Structure – Mechanical Model J. Schmalzle 4/8/13.
Advertisements

QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
BNL - FNAL - LBNL - SLAC Long Quadrupole Results & Status Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
BNL - FNAL - LBNL - SLAC Design and Test of the 1 st Nb 3 Sn Long Quadrupole by LARP Giorgio Ambrosio Fermilab Acknowledgement: many people contributed.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14,
ASC 2014Nb 3 Sn Block Coil Dipoles for a 100 TeV Hadron Collider – G. Sabbi 1 Performance characteristics of Nb 3 Sn block-coil dipoles for a 100 TeV hadron.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
H. Felice, D. Cheng, H, Pan, M. Reynolds, A. Pekedis, T. Lipton MQXFS1 update 07/27/2015.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
QXF protection meeting, 4/29/14HQ High Miits Study – H. Bajas, G. Sabbi 1 HQ02 High MIITs Studies Preliminary findings and next steps Hugo Bajas, GianLuca.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Long Quadrupole Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
Helene Felice Team: Dan Cheng, Daryl Horler, Paul Bish, Hugh Highley and Nate Liggins Thank you to Paolo Ferracin, Gianluca Sabbi and Franck Borgnolutti.
MQXFPM1 and MQXFS1b Test Results
TQS Overview and recent progress
TQ Program and Review Charge
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
Mechanical tolerance analysis for the MQXF prototype structures
Support structure and target pre-stress
SQXF Mirror QXFSM1 Strain Gauges
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
LARP Technology Quadrupole Review
TQC-01 SG data I. Novitski.
Mechanical Modelling of the PSI CD1 Dipole
FRESCA2 Update on the dipole design and new calculations
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Glyn Kirby Magnet AssemblyTechniques.
New Magnets for the IR How far are we from the HL-LHC Target?
MQXF coil cross-section status
CERN Accelerator School Superconductivity for Accelerators Case study 2 Paolo Ferracin European Organization for Nuclear Research.
P.Fabbricatore & S.Farinon
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
MQXFAP2 SG Readings ---Update (up to quench #22)
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Long term behavior and high MIITs test in the LARP program
Cross-section of the 150 mm aperture case
HQ test at CERN: strain and stress measurements
MQXFS6 assembly and loading
Presentation transcript:

HQ02b Preload Increase - Summary Helene Felice Team: Dan Cheng, Daryl Horler, Paul Bish , Hugh Highley and Nate Liggins Thank you to Paolo Ferracin, Gianluca Sabbi and Franck Borgnolutti for fruitful discussions on target definition

HQ02a Assembly Targets Choice made of a conservative Azimuthal Mid-plane quenches Choice made of a conservative Azimuthal target preload ~ 200 T/m In agreement with short sample prediction Target Preload at 300 K: eq shell / pole = 863 me / -450 me sq shell / pole = 66 /-63 MPa Target Preload at 4.2 K: eq shell / pole = 1905 me / -720 me sq shell / pole = 169 / -147 MPa Axial Preload in agreement with previous HQ assemblies sz rod = 60 / 160 MPa ez rod = 880 me / 2000 me Axial preload was never an issue in HQ HQ01 experience 12/12/2013 H. Felice

Proposal from 11/27/2013 meeting Assumption based on training behavior: lack of preload starting at 15 kA Spread among coils is very likely (seen during initial HQ02a preloading) Conservative approach would be: HQ02a (ref) Option1a 4.2 K Iss Option 1b 1.9 K Iss sq shell MPa 170 203 250 Preload kA 15 (ref) 16.4 18.3 Gradient T/m 186 206 Peak sq in coil at cold 3D baseline -189 -220 -265 Peak sq in coil at cold w more interception -150 -180 -227 Peak sq at 206 T/m 3D baseline (intercept) -190 (-170) -203 (-185) -220 (-205) Shim mm 390 (ref) 590 (+200) 890 (+500) Additional shim in mils mils +8 +20 Target: 200 MPa at cold 12/12/2013 H. Felice

Target and shim definition for HQ02b ~ 10 mils From model and measurements 57 me/mil Deq = 615 me HQ02a Pre test 300 K HQ02a2 post test Target HQ02b 4.2 K Target HQ02b eq shell me 822 685 ~ 1300 ez shell 100 7 ~ 10 sq shell MPa 66 54 203 98 ez remains ~ constant during loading Virgin coils Dsq measured during HQ02a cool-down Computed based on training behavior Shim increase by ~ 10 mils (250 mm) 12/12/2013 H. Felice

Increase preload on 12/09/2013 Target: 10 mils per quadrant Added in 12 steps: 3 mils per quadrant : 4 steps 4 mils per quadrant: 4 steps Bladder pressure HQ02a: up to 3000 PSI (21 MPa) HQ02b: from 3300 to 5200 PSI (36 MPa) 12/12/2013 H. Felice

HQ02b Shell measured strain after load increase Azimuthal strain Axial strain -10 me +/- 53 1270 me +/- 105 Target ~ 1300 me Shell azimuthal strain on target at room temperature 12/12/2013 H. Felice

HQ02b Shell measured stress after load increase Azimuthal stress Axial stress 33 MPa +/- 6 100 MPa +/- 10 Target: 98 MPa Shell azimuthal stress on target at room temperature 12/12/2013 H. Felice

Pole SG data Coil pole SG seem to be measuring at room temperature Coil pole average before loading -343 me +/- 199 To be compared to HQ02a post loading: -403 me +/- 181 SG seems reliable at room temperature 12/12/2013 H. Felice

Pole SG data Coil pole SG seem to be measuring at room temperature Coil pole average before loading -343 me +/- 199 To be compared to HQ02a post loading: -403 me +/- 181 Coil avg after loading -603 me +/- 150 Deq = 260 me => -26 me/mil Model predicts -30 me/mil SG seems reliable at room temperature and responsive to load SG issue might come from Temperature compensation 12/12/2013 H. Felice

Summary HQ02b has an increased preload wrt HQ02a-a2 Preload target redefined based on training performance Target reached during assembly By addition of 10 mils / 250 microns shims SG seems to be reliable at room temperature Spread in coil remains large Temperature compensation is in question 12/12/2013 H. Felice