HQ Mirror Assembly R. Bossert

Slides:



Advertisements
Similar presentations
SC Magnets at Fermilab New Collaring and Coil Pre-stress Limit for a Nb3Sn Magnet Alexander Zlobin Technical Division Fermilab.
Advertisements

QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Preliminary Design of Nb 3 Sn Quadrupoles for FCC-hh M. Karppinen CERN TE-MSC.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
Superconducting Large Bore Sextupole for ILC
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
F. Borgnolutti November 14 th nd HiLumi Collaboration Meeting Frascati HQ coils: History & Performance.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
11 T Dipole Experience M. Karppinen CERN TE-MSC On behalf of CERN-FNAL project teams The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
Dipole design at the 16 T frontier - Magnet R&D for a Future Circular Collider (FCC) at Fermilab Alexander Zlobin Fermilab.
11 T Dipole Project Goals and Deliverables M. Karppinen on behalf of CERN-FNAL collaboration “Demonstrate the feasibility of Nb3Sn technology for the DS.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
Sept. 29, 2008Rodger Bossert1 Quench Positions in TQC Models Rodger Bossert Technical Division Technical Memo #TD September 29, 2008.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
HQ02A2 TEST RESULTS November 7, 2013 FERMILAB. HQ02 test at Fermilab 2  First HQ quadrupole with coils (#15-17, #20) of the optimized design o Only coil.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LQM01 Test Summary Guram Chlachidze LARP CM16 Montauk, NY May 16-18, 2011.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5.
MQXFPM1 and MQXFS1b Test Results
TQS Overview and recent progress
TQ Program and Review Charge
Model magnet test results at FNAL
TQS Structure Design and Modeling
Rodger Bossert/Shlomo Caspi
SQXF Mirror QXFSM1 Strain Gauges
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
LARP Technology Quadrupole Review
At ICFA Mini-Workshop on High Field Magnets for pp Colliders,
TQC-01 SG data I. Novitski.
Mechanical Modelling of the PSI CD1 Dipole
FRESCA2 Update on the dipole design and new calculations
EuroCirCol: 16T dipole based on common coils
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
MBHSP02 test STATUS and first results
the MDP High Field Dipole Demonstrator
MKQXF FEA Model Haris Kokkinos
MQXF updates P. Ferracin October 9th, 2014.
New Magnets for the IR How far are we from the HL-LHC Target?
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Presentation transcript:

HQ Mirror Assembly R. Bossert LARP Collaboration Meeting November 16-18, 2011

Introduction & Motivation Fermilab has implemented the “Magnetic Mirror” design for both dipoles and quadrupoles, as an efficient way to optimize and/or “pre-test” Nb3Sn coils. It is an efficient way to test new coil designs and features in a significantly shorter time period than would be necessary for full quadrupoles. Based on positive experiences gained using dipole and quadrupole mirror structures to test coils of 1m, 2m and 4m long we can: test individual coils under operating conditions similar to those of the real magnet. reduce the turnaround time, material and labor costs. scale-up Nb3Sn coil technology. HQ Mirror Assembly Rodger Bossert November 16, 2011

HQ Mirror Assembly Rodger Bossert November 16, 2011 Mirror Design TQC TQM HQM The quadrupole mirror designs TQM (for 90-mm TQ coils) and HQM (for 120-mm HQ coils) are based on the mechanical structure of the LARP technology quadrupole collar (TQC) series. Three coils, stainless steel collar blocks and preload control spacers were replaced by the magnetic mirror blocks and spacers. HQ Mirror Assembly Rodger Bossert November 16, 2011

HQ Mirror Assembly Rodger Bossert November 16, 2011 HQ Mirror Concept Horizontal “side shims” are placed here G-10 and Kapton midplane shims Side “ear” Iron Mirror Block Stainless Skin Iron Yoke HQ Mirror Assembly Rodger Bossert November 16, 2011

HQ Mirror Assembly Rodger Bossert November 16, 2011 Mirror Magnetic Flux Distribution at 20 kA Tesla 12 10 8 6 4 2 14 HQ Mirror Magnetic Flux Distribution at 20 kA HQ Magnet Magnetic Flux Distribution at 20 kA HQ Mirror Assembly Rodger Bossert November 16, 2011

HQ Mirror Coil Stress Distribution 300 K 4 K 4 K, 14 kA, 17 kA At quench current the azimuthal Lorentz force in the mirror is ~30% lower than in the quadrupole model => lower coil prestress needed. The coil stress after assembly of 120-130 MPa provides the coil compression up to 17 kA in HQM (85% SSL). HQ Mirror Assembly Rodger Bossert November 16, 2011

HQ Mirror Assembly Rodger Bossert November 16, 2011 HQM01-3 Coil Features Two HQ mirrors have been tested. Construction of a third is beginning. Mirror Coil # Strand Cable Cable Insulation Azimuthal Space for Expansion (L1/L2) Axial Gap (mm/m) Previous HQ Coils RRP w/o core S2 glass sleeve 1.9%/1.9% 1 HQM01 HQ12 RRP 54/61 SS core 5.4%/4.6% HQM02 HQ13 7.6%/6.3% 2.75 HQM03 HQ14 RRP 108/127 6.8%/6.8% 4 TABLE 1 COIL SPECIFIC FEATURES HQ Mirror Assembly Rodger Bossert November 16, 2011

HQM Coil CMM Measurements HQ13 before HQM02 at 736mm from lead end One square = 100 microns (4 mils) 100 µm 130-160 µm radially 60 µm HQ Mirror Assembly Rodger Bossert November 16, 2011

HQ Mirror Assembly Rodger Bossert November 16, 2011 HQM Shim System Upper Yoke G-10 and Kapton midplane shims Horizontal “side shims” Stainless protective shell. Transverse coil preload and support is provided by stainless steel skin. Axial preload and support is provided through end bolts in the end plates. HQ Mirror Assembly Rodger Bossert November 16, 2011

HQ Mirror Assembly Rodger Bossert November 16, 2011 HQM Coil Strain Gauges Azimuthal active gauges Axial active gauges Temperature Compensators HQ Mirror Assembly Rodger Bossert November 16, 2011

HQM01 Data During Pressing HQ Mirror Assembly Rodger Bossert November 16, 2011

HQM01 during Construction HQ Mirror Assembly Rodger Bossert November 16, 2011 12

HQM01 during Construction HQ Mirror Assembly Rodger Bossert November 16, 2011 13

HQM01-2 Mirrors Assembly Summary Cored cable. Space increased for coil expansion by increasing reaction cavity size by 1000 um (40 mils). Completed with 132 MPa azimuthal preload. End load 10 kN each end. Tested April 2011. HQM02: Cable without core. Space increased for coil expansion by removal of one turn. Increased longitudinal space in cavity from HQM01. Completed with 130 MPa azimuthal preload. End load 10 kN each end. Tested September 2011. HQ Mirror Assembly Rodger Bossert November 16, 2011 14

HQ Mirror Assembly Rodger Bossert November 16, 2011 HQM03 Mirror Status Coil HQ14 has been shipped to Fermilab. 108/127 cable No core. Cable size reduced to accommodate larger space for reaction. Further increase of longitudinal space in reaction cavity. HQ14 will be measured this week, and assembly will begin November 28. Preload goals identical to HQM01 and HQM02. Completion of magnet is expected by end of calendar year 2011. Testing will take place late January/early February. HQ Mirror Assembly Rodger Bossert November 16, 2011 15