Various Views From CAD Layout Emphasis on the relative locations of

Slides:



Advertisements
Similar presentations
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Advertisements

Grimsby Secondary School
Isometric and Oblique Pictorials
Using the Alphabet of lines. Drawing should be near bottom left corner. The front view shows how wide and how tall the object is.
Architectural Drawing
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Use the 3 ratios – sin, cos and tan to solve application problems. Solving Word Problems Choose the easiest ratio(s) to use based on what information you.
Google Sketchup. What is Sketchup SketchUp is a very powerful 3-D modeling software of the type used by architects and drafters. In three dimensional.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
8-4 Angles of elevation and depression. Objectives Solve problems involving angles of elevation and angles of depression.
Warm up Find the missing side.. Skills Check CCGPS Geometry Applications of Right Triangle Trigonometry.
The HESSI Imaging Process. How HESSI Images HESSI will make observations of the X-rays and gamma-rays emitted by solar flares in such a way that pictures.
1. From a point 80m from the base of a tower, the angle of elevation is 28˚. How tall is the tower? x 28˚ 80 Using the 28˚ angle as a reference, we know.
Sectional Elevations.  Used to show the insides of an object by drawing it as if it had been chopped.  Will appear in the General and Credit exams.
University of Houston Passage measurements and ½ inch width 79 and ½ inch height Elevator cabin measures 56 ½ x 79 ½ inches.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
Solving Word Problems Use the 3 ratios – sin, cos and tan to solve application problems. Choose the easiest ratio(s) to use based on what information you.
Girls On The Run Los Angeles
Introduction For Whom Features challenges Future Work Used Technology
Static picture effects for PowerPoint slides
Animated picture effects for PowerPoint slides
TRAFFIC LAWYERS OF TEXAS
PERSPECTIVES & ELEVATIONS
HAMLET By William Shakespeare
Static picture effects for PowerPoint slides
Physics Careers February1st, 2017
Volumes Of Solids. 8m 5m 7cm 5 cm 14cm 6cm 4cm 4cm 3cm 10cm.
Smart Graphic Layout TOPIC statement
РОСІЙСЬКА МОВА Кількість завдань - 51 Час на виконання – 150 хв.
. ..
ФІЗИКА Кількість завдань - 34 Час на виконання – 180 хв.
سید محسن هاشمی نسب و رضایی
Custom animation effects: curve up and grow (Intermediate)
PowerPoint Heaven PowerPoint Heaven. PowerPoint Heaven PowerPoint Heaven.
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
1.
Compass Cyber Security Consulting
Mrs. Stone’s Mime’s (Pantomime)
Les Verbes ER LCHS NOW SHOWING Marquee with 3-D perspective rotation
You’re a Junior! (Basic) Animated 3-D cube with changing pictures
Let’s start at where we left out just now
SES First Grade Field Trip
TEXT TEXT TEXT Animated rectangles curve up and grow in sequence
Balancing Chemical Equations
موضوع بحث: تعریف علم اصول جلسه 43.
اشاره به نتایج قیاس های فقهی گاهی، حکم شرعی است
علم اصول، «نفس قواعد» است نه «علم به قواعد»
نظریات پیرامون «تمایز علوم»
گزارش فعالیت سه ماهه دبستان ابن سینا
نظریات پیرامون «تمایز علوم» بررسی دلایل عدم احتیاج علوم به موضوع
نظریات پیرامون «تمایز علوم» بررسی دلایل احتیاج علوم به موضوع
Navigation Compass and Map NORTH WEST EAST SOUTH
first line of text goes here
Static text effects for PowerPoint slides
Warm up Find the missing side.
Volumes Of Solids. 8m 5m 7cm 5 cm 14cm 6cm 4cm 4cm 3cm 10cm.
Angles of Elevation and Depression
Equator Prime Meridian Relative Absolute Location Location Parallels
Smart Graphic Layout TOPIC statement
Volumes Of Solids. 8m 5m 7cm 5 cm 14cm 6cm 4cm 4cm 3cm 10cm.
ONE NIGHT ONLY! CJMS Talent Show Friday, December 11
Depression and Elevation
نظریات پیرامون «تمایز علوم» بررسی دلایل احتیاج علوم به موضوع
قاعده لا ضرر، تنها در شبهات حکمیه جاری است
Picture with watercolor overlay background (Advanced)
Please Do Now / Dec. 2, 15 Log into computer Go to
جلسه 34.
Balancing Chemical Equations
The Future Begins Today, Not Tomorrow. Labor 2018
1 ج : اشاره بعضی از اصولیون به تعریف ترکیبی آخوند با «یک لفظ»
Presentation transcript:

Various Views From CAD Layout Emphasis on the relative locations of CRT coverage and TPC Active Detector Volume

Legend – identification of parts View from South (view in the Beam direction) Overburden (first layer) Top CRT (flat portion) Side Walls Top CRT (angle portion, on the long sides) Vent Duct Vent Duct Side CRT (long side in three sections, middle section slides in front of the upst and dnst sections thus a small horizontal gap between them) Stairs to Top of Warm Vessel Mezzanine Level Active Volume (field cage) Argon Volume (interior of cryostat) Cryostats Insulation Warm vessel (dark red lines)

Legend – identification of parts View looking west (Beam direction is left to right) Side CRT (long sides – shaded areas) upst section middle section dnst section The sections overlap slightly Top CRT (flat) (dashed line) Top CRT (on north wall) Top CRT (angle, long sides – shaded area) Top CRT (on south wall, vertical portion) Walls Overburden (layer 1) Cryogenics Area Active Volume (field cage) Argon Volume (interior of cryostat)

South wall – coverage on angled wall?? View looking west (Beam direction is left to right) If the south wall Top CRT is placed on the angled portion of the wall, then there is a gap in coverage on the vertical portion wall, red circle on the left side below and illustrated by the yellow trajectory. This gap exists because of decisions to raise the ledge and in turn raise the elevation of the flat portion of the top CRT. But really this CRT panel location is wrong - - the angled portion of the south wall was never intended to hold Top CRT. Instead the short end walls just below the ledge hold top CRT panels in a vertical orientation – where the red and green circles are, and also as shown on the previous slide Walls Overburden Cryogenics Area Active Volume (field cage) Argon Volume (interior of cryostat)

Play with Trajectories View looking west (Beam direction is left to right) Download this power-point, and play with the yellow lines, to show various cosmic particle trajectories. Not as accurate as a Monte Carlo, but provides a basic view of overall coverage

Head Height on Access Stair The skinny blue rectangle represents a 6-foot tall person standing on the access stair, just one step below the top of the detector This particular diagram shows an angled CRT module on the angled wall - - but ignore that; it won’t be located there - - and even without it, there is only 6-ft of vertical height between the angled wall and the stairs The stairs shown here are “standard” rise and tread width. The tread rise and width can be adjusted to some extent, but past some point they cease to be called “stairs” in terms of what is allowed for a major egress passage, from a safety point of view These stairs will be the main method of access to the top of the detector A second access point on the opposite end is also being examined, but since it must be made to fit around the cryogenics also located there, this access is more likely to be a steeper ladder style of stair Of more interest for today is the very skinny tan rectangle The thin tan rectangle represents a Top CRT module, hanging vertically on the south upper wall. The module clearly interferes with the stair access Solution – don’t hang a module above the stair; come up with alternative coverage for this small gap There are various other places where we will have small gaps – particularly on the north side where the cryogenics is located South Mezzanine And Access Stair

Rendered view Of the corner where the access stair is located Various layers of the detector are shown “peeled back”. In reality we won’t be attaching TPC readout mini-crates (blue boxes, upstream end) onto the chimneys while a portion of the warm vessel roof is not yet installed (downstream end) The upstream end shows Top CRT “sample coverage”, with just a single Top-Angle panel, and just two rows of Top-Flat panels. The South Wall vertical panels show a necessary gap above the stairs which access the top of the detector Rendered view Of the corner where the access stair is located Access stair, in the upstream west corner

Same viewpoint, zoomed in a bit more Also note there is no attempt yet to show how the Side CRT is arranged on the South Side