Jean-Sebastien Graulich, Geneva

Slides:



Advertisements
Similar presentations
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
Advertisements

Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
MICE DAQ and Controls ReviewJean-Sebastien GraulichSlide 1 DAQ Overview o Terminology o Requirements o Front End Electronics o Trigger System o DAQ Hardware.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
STaRBoard Jamal Rorie 5/09/06 Physics 476. Why do we need ToF info? Used to determine species of particle –Central Drift Chamber records path –ToF records.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
5/9/03Andrei Sukhanov. Phobos BWMeeting1 Andrei Sukhanov – measurements, analysis Ioury Sedykh – software, calculations Piotr Kulinich – measurements,
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
16th May 2007 MICE tracker phone meeting 1 Setup test bench/ Installation DATE Hideyuki Sakamoto 16 th May 2007 MICE phone meeting.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
C.Beigbeder, D.Breton, M.El Berni, J.Maalmi, V.Tocut – LAL/In2p3/CNRS L.Leterrier, S. Drouet - LPC/In2p3/CNRS P. Vallerand - GANIL/CNRS/CEA SuperB -Collaboration.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
"North American" Electronics
Tracker readout, DAQ, C&M and calibration
Beam detectors performance during the Au+Au runs in HADES
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
AHCAL Beam Interface (BIF)
Alternative FEE electronics for FIT.
ETD meeting Electronic design for the barrel : Front end chip and TDC
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Luminosity Monitor Status
F.Guber, A.Ivashkin INR, Moscow
Hall A Compton Electron detector overview
Status of the TOF Detector
Status of n-XYTER read-out chain at GSI
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
CLAS12 Timing Calibration
BESIII EMC electronics
Particle ID Diagnostics in the MICE Beamline
Trigger issues for the CALICE beam test
Electronics and DAQ Summary
HallD Collaboration Meeting Jefferson Lab December 11-13, 2003
RPC Electronics Overall system diagram Current status At detector
ZDD status BESIII Collaboration Meeting, September 2012
Presentation transcript:

Jean-Sebastien Graulich, Geneva DAQ fo KL and TOF Jean-Sebastien Graulich, Geneva General Information Status of Synchronization problem FEE for TOF2 MICE CM25 Nov 2009 Jean-Sebastien Graulich

Jean-Sebastien Graulich Reminder TOF Front End KL Front End MICE CM25 Nov 2009 Jean-Sebastien Graulich

Jean-Sebastien Graulich Issues (1) Cross Talk Possible sources Splitter RC Shaper Twisted pair cable Affecting both TOF and KL Cabling done in such a way that Requiring coincidence between opposite PMTs reduce the effect strongly but not completely Needs some dedicated studies Action: A better splitter is under production in Geneva MICE CM25 Nov 2009 Jean-Sebastien Graulich

Jean-Sebastien Graulich Cross Talk Consequence: Dead Channel unnoticed ! (rate != 0) Counts - S6 in TOF 1 (ch 73) - Disconnected in the hall - Probably for the entire September run TDC01 Channel Number Counts MICE CM25 Nov 2009 Jean-Sebastien Graulich TDC00 Channel Number

Jean-Sebastien Graulich Issues (2) Discriminator dead time Minimum width of logic signal after discriminator: 100 ns Double pulse resolution: 110 ns In a given TOF PMT, it is IMPOSSIBLE to see two hits in the same burst ! Complying with specifications but a real limitation MICE CM25 Nov 2009 Jean-Sebastien Graulich

Jean-Sebastien Graulich Issues (3) Noise in FADC Fluctuating baseline Seems to be time correlated with the particle trigger Affects Charge resolution Needs dedicated studies MICE CM25 Nov 2009 Jean-Sebastien Graulich

Synchronization Problem TOF and KL FEE in different VME Crates Each crate receives separate DAQ trigger at the end of the spill Perfect Synchronization needed for correlation between TOF and KL MICE CM25 Nov 2009 Jean-Sebastien Graulich

Understanding the Problem Synchronization can be lost because of Unstable electronics in DAQ trigger distribution Unstable behavior of the VME/Pci Interface The DAQ software release the busy and enables the DAQ trigger receiver channel after readout Must go through the VME/Pci Interface It happens that one of the two commands is not executed properly… Unpredictable Cured only by a power cycle Has to be monitored MICE CM25 Nov 2009 Jean-Sebastien Graulich

Number of LDC receiving a DAQ Trigger per DAQ event DAQ Trigger Monitor counts Number of LDC receiving a DAQ Trigger per DAQ event # of DAQ Triggers LDC Number MICE CM25 Nov 2009 Jean-Sebastien Graulich

Particle Trigger monitor Counts TDCs V1724 FADCs Scalar ch0 V1731 FADC Equipment number # of Part Triggers LDC Number MICE CM25 Nov 2009 Jean-Sebastien Graulich

Jean-Sebastien Graulich FADC behavior During September Run One FADC didn’t accept particle triggers at all I am suspecting a hardware failure Another FADC missed all the particle triggers for 1 single spill at the beginning of the run and then behaved normally Need to be sorted out with CAEN I need help here MICE CM25 Nov 2009 Jean-Sebastien Graulich

Jean-Sebastien Graulich FEE for TOF2 Needs (ignoring cabling and HV) 1 TDC V1290 5 FADC V1724 Splitters and Shapers available in Geneva To be shipped Issues NIM crate room Not sure the power supply will stand a full load VME crate room All TOF TDC must be in the same crate TOF FADC will go to KL crate A major update of crate layout is necessary ! MICE CM25 Nov 2009 Jean-Sebastien Graulich

Jean-Sebastien Graulich Summary TOF0/1 and KL in good shape Cross talk needs attention Synchronization has to be monitored TOF2 installation is not trivial MICE CM25 Nov 2009 Jean-Sebastien Graulich