Emittance Diagnostics

Slides:



Advertisements
Similar presentations
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Advertisements

ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Status of very high priority beam tuning software Special ATF2 project meeting, Korea, 1 st October 2008 Cécile Rimbault, on behalf of High Priority task.
1 Proposal for a Multi-Optical Transition Radiation System in ATF2 A. Faus-Golfe, D. McCormick IFIC – SLAC 11 June th TB/SGC Meeting.
CERN, BE-ABP (Accelerators and Beam Physics group) J. Pfingstner Beam jitter studies at ATF and ATF2 Jürgen Pfingstner Hector Garcia Morales 25 th of January.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Kicker Optics – or – Selected ATF-II EXT Line Performance Issues ATF-II Technical Review, April M. Woodley1/40.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
ATF2 Tuning Updates Glen White, SLAC Sept
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
Mark Woodley, SLACATF2 Software Review (June 18, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
First investigations of ATF2 at SLAC Axel Brachmann, Thomas Himel, Tom Markiewicz, Janice Nelson, Toshiyuki Okugi, Mauro Pivi, Tor Raubenheimer, Marc Ross,
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
Proposal of Halo collimation system for ATF2 A.Faus-Golfe, N. Fuster-Martínez J. Resta-López (IFIC) P. Bambade, S. Liu, S. Wallon (LAL) 113/02/1417th ATF2.
Emittance Measurements and Related Experimental Results 15th ATF2 Project Meeting, January M. Woodley1/44.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
EXT: Summary of activities, software development, and tuning performance 11th ATF2 Project Meeting, January M. Woodley1/29.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
Mark Woodley, SLAC5th ATF2 Project Meeting (December 19, 2007)1 ATF2 Layout/Optics (v3.8) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing.
Commissioning Hardware and IP Configuration of ATF / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)
Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?
Location of the LW detector- Simulation of the LW signals Lawrence Deacon RHUL ATF2 meeting August 23 rd 2006 KEK.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Simulation of the α, dispersion, coupling and β multiknobs in large β optics Sha Bai, Philip Bambade, Benoit Bolzon, Javier Resta Lopez
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Wakefield effect in ATF2 Kiyoshi Kubo
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
4 th ATF2 Project Meeting, 31 May 2007 A. Seryi 1 Summary of SLAC simulation study of emittance growth in the ATF extraction line SLAC team: J. Amann,
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
Integrated ATF2 Dynamic Tuning Simulations Glen White, LAL/SLAC ATF2 Software Workshop June 2008 Simulation overview. Tuning for 37nm IP vertical beam.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
IP Tuning Task Updates Glen White, SLAC January
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Summary FD Support System
ILC BDS Alignment, Tuning and Feedback Studies
Expected hardware status and Priority of the commissioning task
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
EXT Tuning 13th ATF2 Project Meeting, January M. Woodley.
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
ATF2 IP Tuning Task Simulation Updates
ILC BDS Emittance Diagnostics: Design and Requirements
Beam Optics Set-Up at SLAC End Station A
3rd ATF2 Project Meeting, December 18-20, 2006
Updates on IR and FF for super-B factory
Emittance Diagnostics
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Emittance Diagnostics
ATF2 Layout/Optics (v3.6) Existing ATF Extraction Line
Y. Nosochkov and M. Woodley (SLAC)
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
ILC Beam Switchyard: Issues and Plans
Sha Bai CEPC AP meeting Work summary Sha Bai CEPC AP meeting
Presentation transcript:

Emittance Diagnostics ATF2 Layout/Optics (v3.7) Coupling Correction / Emittance Diagnostics FONT nBPM (KEK) nBPM (SLAC) Compton / laserwire Existing ATF Extraction Line ODR Mark Woodley, SLAC July 18,2007

(v3.7) Mark Woodley, SLAC July 18,2007

Version 3.7 Changes remove EXT sextupoles remove FF octupoles and decapoles 2 new IDX skew quadrupoles in EXT for vertical dispersion correction (Okugi-san’s locations) final magnet designs selected; use correct effective lengths, bores, gaps, etc. all diagnostic and correction devices (that I know of) now in MAD decks more QBPMs added in EXT … total for ATF2 is now 34 “standard” installation for all BPMs is on downstream end of magnet … as discussed and agreed at the SLAC-ATF2 meeting last March (there are some exceptions) nomenclature for FF devices updated “FF” appended to device names as Kuroda-san suggested, “QD10” quads become “QD10BFF” and “QD10AFF” (also “QF9”, “QF5”, and “QD4”) “QD2B” (a QF) and “QF3” (a QD) become “QF3FF” and “QD2BFF” respectively Mark Woodley, SLAC July 18,2007

Tracking Results perfect machine Program σy*(rms) σy*(sig) εy Δεy nm nm nm % -------- -------- -------- ------- ----- MAD 38.261 35.524 32.8839 9.6 ELEGANT 38.401 35.551 32.9674 9.9 TURTLE 36.292 34.791 31.6332 5.4 DIMAD 38.165 36.575 32.7121 9.0 LUCRETIA SAD perfect machine 10,000 particles (Gaussian distributions; 5σ) sextupole component in SHI H-bends included multipoles in SLAC epoxy kickers, QM7R.1, BS1X, QF1, and QD0 not included no chromatic correction in EXT Mark Woodley, SLAC July 18,2007

ATF2 Inflector (v3.7) K2 BH2 BH1 6.0 m BH1 K1 BH1 (SHI “H”) strengths same as existing EXT BH2 (SHI “C”) has 110% of present strength Mark Woodley, SLAC July 18,2007

IP configuration FF: IP Area IP-BPM Monitors : 3 beam size monitors 2 C-band BPMs 1 Screen Monitor 1 ICT 1 IP-BPM S-band BPM Sweeping Magnet Honda Monitor Shintake Monitor Area Carbon Wire C-band BPM Screen Monitor C-band BPM ICT 120 100 180 100 550 100 180 135 180 100 135 150 180 155 QD0 Dump Bend C-band ref 350 200 540 390 150 605 105 705 547.5 IP-BPM 705 from Okugi-san’s 4th ATF2 Project Meeting talk IP Honda Monitor ; Moving Stage 350 nm – 1 micron ( -540mm from IP) ( Beam Vibration ) Shintake Monitor ; Sweeping Magnet < 350 nm ( at IP ) Phase Scan Carbon Wire ; Moving Stage ( micron level ) > 1 micron ( +390mm from IP) Sweeping Magnet ( sub-micron level ) Mark Woodley, SLAC July 18,2007

K1(+) K2(+) Mark Woodley, SLAC July 18,2007

– x – y σ (μm) 7 < σx/σy < 23 Mark Woodley, SLAC July 18,2007 2.55 1.24 1.27 1.26 3.82 3.76 0.85 2.20 0.42 0.86 SQ WS 90° 180° – x – y 11° 18° 28° 29° 42° 43° 80.6 10.0 154.7 6.7 88.5 11.7 153.0 6.6 86.5 σ (μm) 7 < σx/σy < 23 Mark Woodley, SLAC July 18,2007

Mark Woodley, SLAC July 18,2007

Mark Woodley, SLAC July 18,2007

Mark Woodley, SLAC July 18,2007

2nd order dispersion Mark Woodley, SLAC July 18,2007

chromaticity (EXT) Mark Woodley, SLAC July 18,2007

beam size (μm) Parameters energy = 1.3 GeV γεx = 5×10-6 m εx = 2×10-9 m γεy = 3×10-8 m εy = 1×10-11 m σz = 8 mm σδ = 0.08 % βx* = 4 mm βy* = 0.1 mm σx* = 2.828 μm σy* = 34 nm Mark Woodley, SLAC July 18,2007

Pulse-to-Pulse Feedback stabilize beam into Final Focus (especially at sextupoles) 2 dipole correctors per plane (Final Doublet phase and IP phase) 2 BPMs per plane (Final Doublet phase and IP phase) correctors and BPMs should be as far downstream as possible feedback BPMs should have no dispersion cavity BPMs used for feedback must have movers BPMs must have resolution ≤ spot size for sub-σ stabilization requires sub-micron resolution for vertical BPM at IP phase move nanoBPM setup to selected location (between QM14FF and QM13FF … it’s a tight fit) and use nBPM3 for feedback … or … could we use the IPBPM test setup here instead? use a stripline BPM for horizontal BPM at IP phase Mark Woodley, SLAC July 18,2007

IP Mark Woodley, SLAC July 18,2007 IP phase ZH ZV BPM FD phase QBPM7FF IP phase nBPM3 FD phase ZV1FF IP phase ZV11X QBPM9FF FD phase ML1FF IP phase ZH10X FD phase ZH1FF Mark Woodley, SLAC July 18,2007

Mark Woodley, SLAC July 18,2007 ZH BPM ZV BPM 1910.5 µm 7.9 µm

Version 3.7 Parts List Issues 2 new IDX skew quadrupoles (QS1X and QS2X) 2 new 20 amp bipolar power supplies (QK1X and QK4X) 4 new NKK CH horizontal dipole correctors (with 5(?) amp bipolar power supplies) 2 new NKK CV vertical dipole correctors (with 5(?) amp bipolar power supplies) QD14X running at 97% of max power supply current (see parts list … ) FF matching quadrupoles (QM16FF – QM11FF): bipolar power supplies? power supply for BDMP Alexander Kalinin’s Feedforward/Feedback devices for EXT have not yet been incorporated into the MAD decks … should they be? can they coexist with FONT? off-beamline components (detectors, gamma collimators, MONALISA, etc.) not included also see comments and notes on each worksheet of the parts list … Mark Woodley, SLAC July 18,2007

Version 3.7 Optics and Simulation Issues OTR1X … interference with DR quadrupole QM8R.1? nanoBPM setup … does it fit between QM14FF and QM13FF? (if not, move QM14FF upstream); can we use it for pulse-to-pulse feedback? should there be a location reserved for ODR? FONT kickers are not in the deck yet … need a design (30 cm striplines? FEATHER kickers? Kalinin’s feedforward/feedback devices? possible reduced (20-25%) gradient for extracted beam in QM7R.1: can’t match in EXT using only quadrupole strengths … change DR optics to compensate? simulations with estimated multipole content of SLAC epoxy kickers, QM7R.1, BS1X, and shimmed QC3s need “small spot” optics for LW1X (1 µm) operation need to redo and expand full tuning simulations MPS issues for commissioning? Mark Woodley, SLAC July 18,2007

Version 3.7 Release Files Mark Woodley, SLAC July 18,2007 Release v3.7 Files (July 18, 2007) -------------------------------------------------------------------------------- ATF2_common.xsif : MAD input file (common definitions) EXT_v3.7.xsif : MAD input file (EXT line) FF_v3.7.xsif : MAD input file (Final Focus) inrays.mad : MAD input ray definitions (10000) for tracking ATF2_v3.7.mad : top level MAD command file ATF2_v3.7.save : MAD SAVE file (for conversion to other optics program inputs) ATF2_v3.7.saveline : MAD SAVELINE file (for conversion to other optics ATF2v3.7.ppt : v3.7 overview presentation (PowerPoint) ATF2v3.7.pdf : v3.7 overview presentation (pdf) ATF2DeviceListv3.7r0.xls : detailed parts list (Excel) ATF2v3.7Layout.ppt : scaled cartoons of specific locations (PowerPoint) ATF2v3.7Devices.txt : simple text file with device names, lengths, center positions, and nearby spaces ATF2v3.7Devices.fig : scrollable beamline schematic (Matlab figure file) MagnetPositions.txt : comparison of v3.7 magnet positions to their v3.6 positions Version 3.7 Release Files Mark Woodley, SLAC July 18,2007