Status of the ASTRID2 facility

Slides:



Advertisements
Similar presentations
Institute for Storage Ring Facilities, Aarhus,
Advertisements

Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Dr. Zafer Nergiz Nigde University THE STATUS OF TURKISH LIGHT SOURCE.
1 Slow Global Orbit Feedback at Pohang Light Source (PLS) Heung-Sik Kang Pohang Accelerator Laboratory Pohang, Korea.
K. Balewski (DESY)IWBS Conceptual Design of the PETRA III Orbit Feedback K. Balewski, H.T Duhme, J. Klute, I. Krouptchenkov, R. Neumann, G. K. Sahoo,
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 13 (30/9-1/ ), ASTRID2 and its RF system.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Status and new developments at ASTRID2 ESLS XXII, Grenoble 25-26/ Niels Hertel, ISA University of Aarhus, Denmark.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
Booster Cogging Upgrades Craig Drennan, Kiyomi Seiya, Alex Waller.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
Status of the Diamond Light Source R. Bartolini Diamond Light Source Ltd and John Adams Institute, University of Oxford ILCW CERN, Geneva, 20 th October.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Vacuum Issues from the Beam Dynamics Point of View Marc Muñoz.
S.J. Brooks RAL, Chilton, OX11 0QX, UK Extending FETS with a Ring Electron models are not sufficient for simulating the beam.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
J. Pfingstner Jitter studies February 12, 2014 Optics corrections in the ATF damping ring Jürgen Pfingstner, Yves Renier.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
Experience Laurent S. Nadolski Accelerator Physics Group On behalf of the Sources and Accelerator Division.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
Operational experience of high-power RF at Diamond Light Source
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Machine Operation and Studies at SSRF Wenzhi ZHANG Dec. 16, 2013 Spain.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
Fast Global Orbit Feedback for the Australian Synchrotron Eugene Tan Accelerator and Operations 13/12/20101 ACAS Workshop on Accelerator Feedback Systems.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Operation Status of the RF Systems and Taiwan Photon Source
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
Report Technical Director Storage-Ring-Installation Completed
Operations Machine Simulator.
PETRA III, Status and Upgrade
Diamond Light Source Status and Future Challanges
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Bocheng Jiang SSRF AP group
Snr Power Supply Engineer
P. Forck, P. Kowina, M. Schwickert, R. Singh
Coupling Correction at the Australian Synchrotron
Commissioning the Fast Orbit Feedback System at SSRF
An overview the ASTRID2 storage ring and its RF system
Machine Operation and Progresses in SSRF
The new 7BA design of BAPS
Operation Progress and Upgrade in SSRF
Status and experience of Liberas at Soleil
Collider Ring Optics & Related Issues
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
Status of the ASTRID2 RF systems
PEPX-type BAPS Lattice Design and Beam Dynamics Optimization
Present Status of Orbit Stabilization at SPring-8
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Status of the ASTRID2 facility Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIV (29/11 2016), ASTRID2 facility

The ASTRID 2 facility ASTRID2 main parameters Circumference 45.71m Energy 580MeV Current 200mA Characteristic energy 257eV RF frequency 105MHz Harmonic 16 Horiz. emittance 12nmrad Straight sections 6 Length straight sections 2.82m ID’s 3 Microtron, Booster, Inj. Bl., A2 ring, 6 beamlines, 7 experiments Microtron (100MeV)

ASTRID2 Status Normal operation MTBF (estimates) 150 mA continuous TopUp Vertical beam is not completely stable at higher beam currents 6 beam lines in operation With 7 experiments 250 mA TopUp during machine physics for conditioning MTBF (estimates) ASTRID2: ~1 month ASTRID: ~1 week 3 weeks of user beam User mode plot from Y:\AccPhys\Plots\CurrentLifetime\161109-NicePlotsForESLS 250 mA during 1 week of machine studies ESLS XXIV (29/11 2016), ASTRID2 facility

Vertical beam size At high beam current the vertical beam size grows Above ~170 mA we see that the vertical beam size grows The limit has steadily been increasing since startup Believe it is due to ions captured by the beam 250 mA 150 mA Vertical Beam size Data from Y:\AccPhys\Instabilities\Vertical\160805-Testing250mA\160805_161646-MRS441_h_hSig_AccumTo250mA Variation in Vertical Beam size ESLS XXIV (29/11 2016), ASTRID2 facility

New developments Spring 2017: LOCO studies using MatLab Middle Layer 2017: Will add more power supplies to our Pole Face Strips 4 power supplies per unit (12 units) Quadrupole corrector Tune correction and ID compensation Vertical and horizontal corrector Correct errors in position of combined function dipoles Skew quadrupole Idea: Vary coupling around the ring Implementing a Fast Orbit FeedBack system Hope to have ready during spring of 2017 1 2 4 3 Picture is taken from PFW_as_V_corrector_160202_nh.docx (\\isa\data\Ast2Doc\machine\design\PFW) Upper current is 11 A, and lower current is 9 A, (i.e. 10 A ± 1.0 A) ESLS XXIV (29/11 2016), ASTRID2 facility

Orbit disturbances Disturbance from ASTRID during injections Up to ~20 µm (even after feedforward) Cars on parking lot above ASTRID2 Up to ~5 µm Fairly strong 50 Hz noise peaks 50 Hz: ~3 µm 150 Hz: ~0.4 µm 250 Hz: ~0.2 µm 350 Hz: ~0.3 µm 550 Hz: ~0.2 µm ESLS XXIV (29/11 2016), ASTRID2 facility

Orbit disturbances Average of FFT of beam positions from all 24 vertical pickups Beam position FF plot from \\isa\data\Astrid2\AccPhys\Orbit\FAdata\FOFB\161118-AllNewFOcorrectorsInstalled (FA_2016-11-18-095051-20sec_150mA_allNewFOcorPSinstalled_UBXmean_Y.png), ESLS XXIV (29/11 2016), ASTRID2 facility

Fast Orbit FeedBack Beam positions from the 10 kHz Libera Electron FA output Can use our original window frame correctors Upgraded the existing power supplies with a fast (1 kHz) analog input Will use a standard PC running LabVIEW real- time to do the calculations (5-10 kCalc/s) DACs: 4 pcs TI DAC8568 (8 ch, 16 bit) controlled via SPI from a FPGA enabled DAQ-card at a rate of 5-10 kHz ESLS XXIV (29/11 2016), ASTRID2 facility

FOFB overview 24 Libera Electron with Grouping One 10 kHz FA output Ethernet Standard PC with NI PCI-7811R LabVIEW real-time SPI-like connections 4 wire each DAC 8568 6 Power supplies DAC 8568 6 Power supplies DAC 8568 6 Power supplies DAC 8568 6 Power supplies ESLS XXIV (29/11 2016), ASTRID2 facility

FOFB status Power supplies are upgraded and tested Tested successfully that LabVIEW real-time PC can receive Libera FA data at 10 kHz DAC modules are in production Actual LabVIEW feedback program needs to be written Corrector responce plot from \\isa\data\Astrid2\AccPhys\PowerSupplies\CorrectorSupplies\160329-TestingFastCorrectorUpgrade\analyse (FastCorrector_Overall_1f.png), See ELOG http://isaelog:5717/Ast2Facility/801 Measured frequency response ESLS XXIV (29/11 2016), ASTRID2 facility

Thank you for your attention ESLS XXIII (24-25/11 2015), ASTRID2 facility