Safety approval of the installed copper cooling pipes

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Brazing is a metal-joining process. Brazing is when a filler metal or alloy is heated to its melting temperature above 450 °C.°C It is then distributed.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Absorber/vacuum windows and absorber assembly 1.Window Requirements 2.MICE experimental constraints 3.Welded vs. non-welded windows 4.Installation 5.Testing.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
CMS Pixel Technical Board Meeting – Dec. 16, Forward Pixel Cooling System Information Joe Howell.
2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN  The objectives  Module positioning.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
ZTF Cryostat Finite Element Analysis Andrew Lambert ZTF Technical Meeting 1.
Overview of basic issues.   The design of the (Outer) Tracker Upgrade for phase 2 has been ongoing for more than 4 years  So far the (implicit) assumption.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
14 May 2009Hans Postema - CERN CMS Upgrade Workshop Tracker Phase I upgrades 14 May
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Cooling System Solutions
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
The integration of 420 m detectors into the LHC
Installation of the T600 at Fermilab CSN2, September 22,
1 2S Module meeting, 24 September 2012 S tudies on module support inserts Refers to work by Riikka Häsä, Helsinki Institute of Physics, summer student.
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Documentation on present system and piping layout P. Tropea Tracker Upgrade Engineering and Cooling 12 November 2008.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
Air condition installation
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Pixel Cooling Upgrade (2013) 1 December 20081Hans Postema - CERN.
SPS High Energy LSS5 Thermal contact & cooling aspects
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
Stave thermal analysis Cooling connections CO2 warm Test
Michael A. Green and Heng Pan
SIS 100 Vacuum chamber Recooler String system Components
For the CMS Pixel detector
Installation of the T600 at Fermilab
Status of Cooling Development in Karlsruhe
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Service channels between Tracker and PP1
Ti/SS transitions A.Basti INFN-PISA*
Service channels between Tracker and PP1
Proximity Cryogenics P&IDs meeting
For the CMS Pixel detector
cooling for BGV modules
Forum on Tracking Detector Mechanics - Bonn, May 2016
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
From Design to Installation courtesy R. Folch S. Atieh TS / MME
update on UT cooling system
The 11T cryo-assembly: summary of design and integration aspects
Pixel CO2 Cooling Status
Recirculating CO2 System
Members of project: Christian Brosch Andreas Maier Tamara Bubeck
Status Report on Fermilab CO2 cooling activities
Second Meeting of the Material Budget & Engineering Working Group
Status and Prospects of Tracker Services Hans Postema (CERN)
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
For the CMS Pixel detector
Presentation transcript:

Safety approval of the installed copper cooling pipes CO2 Cooling Safety approval of the installed copper cooling pipes CMS upgrade meeting 28 January 2009 Hans Postema - CERN

Cooling Pipes The currently installed cooling pipes are virtually impossible to replace People ask: “Is this really the case” Please have a look at the following slides 28 January 2009 Hans Postema - CERN

Empty YB0 – far left 28 January 2009 Hans Postema - CERN

YB0 – fully cabled 28 January 2009 Hans Postema - CERN

YB0 - numbers Tracker cooling pipes below all the cables HB: 180 cables, 180 optical fiber cables EB: 1600 cables, 180 optical fiber cables Tracker: 3000 cables, 640 Optical fiber cables 9 month plus, installation time Removing and reinstalling ~10 year old EB cables is inviting trouble 28 January 2009 Hans Postema - CERN

Re-use of installed pipes The currently installed pipes are OD=14 and OD=16 mm copper pipes with a wall of 1 mm Cannot be used for 2 phase CO2 cooling without special precaution But can be used when the system design takes care that pressures remain below a limit Avoiding 100+ bar pressures is also advantageous for detector design 28 January 2009 Hans Postema - CERN

Storage tank The system contains a cooled storage tank When system is inoperative, all liquid is condensed in the tank, all warm components are filled with gas (Standard for cryogenic systems) A very similar system is used for the CDF COT flange cooling, same concept, different fluid, different temperature. See next slide 28 January 2009 Hans Postema - CERN

CDF – COT endplate cooling Courtesy Richard Schmitt FNAL 28 January 2009 Hans Postema - CERN

Which pressures Strong request for detector operation with coolant at +15 C. Avoids condensation during the installation and testing phase. For this a safety valve setting at 57 bar, corresponding to +20 C seems acceptable. Normal operation is below 0 degree C, which corresponds to 35 bar 28 January 2009 Hans Postema - CERN

Operation modes Normal operation, system cooled by commercial chiller, CO2 temperatures between 0 and -20 C, pressures 35 to 20 bar Testing during installation, system cooled by chilled water, temperature +15 C, pressure 50 bar Storage during shutdown, cooled by standard CERN chilled water system, temp +5 C, 40 bar 28 January 2009 Hans Postema - CERN

Meeting with CERN safety Meeting with Benoit Delille on 5/12/2008 Using French safety code CODAP-2000 Stress limit during operation: UTS/4 Stress limit during test: UTS/2.6 Thus pressure test at 1.43x max. operating pressure 28 January 2009 Hans Postema - CERN

CERN safety, question 1 Check that the stress at 57 bar is indeed 44 MPa, including possible thermal effects, including the brazed connections. 28 January 2009 Hans Postema - CERN

CERN safety, question 1 (2) A qualification program was set up for for the brazed connections. The testing was performed by TS-MME-MM The last report in the test series was: Metallurgical qualification of Cu brazed assemblies for the cooling circuit of the CMS tracker 14-05-07 EDMS number 842794 Available at: http://cern.ch/Postema/CO2_cooling/copper_tube/ 28 January 2009 Hans Postema - CERN

CERN safety, question 1 (3) Follow up QA took place and was documented Last report in this series was: Follow-up of witness samples of Cu brazed assemblies for the cooling circuit of the CMS tracker 08-08-07, week 31/07 EDMS number 861965 Available at: http://cern.ch/Postema/CO2_cooling/copper_tube/ 28 January 2009 Hans Postema - CERN

CERN safety, question 1 (4) An overview of the complete documentation is described in: Brazed_connections.doc Available at: http://cern.ch/Postema/CO2_cooling/copper_tube/ Conclusion: All brazed connections are stronger than the copper pipe material 28 January 2009 Hans Postema - CERN

CERN safety, question 1 (5) Pipes are supported in Aerogel insulation material and can slide freely. The longest straight sections are about 4 m radially out along the YB0 iron and about 5 m along the vac tank of the CMS coil Thermal contraction of copper from +20 to -20 is 680 micron/meter 4 mm contraction is easily absorbed by the Aerogel, no additional stress in pipe material 28 January 2009 Hans Postema - CERN

YB0 – fully cabled 28 January 2009 Hans Postema - CERN

Pipe trays and insulation Final holding strap Insulation: Aerogel Spaceloft 9251, k=0.013 W/m*K (against 0.04 W/m*K of Armaflex). Dusty and difficult material to handle, but excellent performance. All parts enclosed in polyethylene bags, sealed, then adhesive vapor barrier around Pipe comb Nuts to be welded on the Vacuum tank 28 January 2009 Hans Postema - CERN

CERN safety, question 2 Check that this stress level is below UTS/4 for the type of copper that is currently installed. Reply: Certificate of the copper tube material received from Christian Saint-Jal (CERN). http://cern.ch/Postema/CO2_cooling/copper_tube/ Minimum tensile strength 220 MPa 44 MPa below 220/4=55 MPa 28 January 2009 Hans Postema - CERN

CERN safety, question 3 When calculating the pressure test, can you consider a maximum stress of UTS/2.6? A maximum stress during operation of UTS/4 and a maximum test stress of UTS/2.6 implies that the pressure test takes place at 1.43x operating pressure. Max. operating stress at 57 bar = 44 MPa Stress during pressure test 1.43x44=63 MPa 28 January 2009 Hans Postema - CERN

CERN safety, question 3 (2) Factory test Rp 0.2 = 75 MPa Test by Stefano Sgobba Rp 0.5 = 106 MPa Pressure test at 1.43x operating is thus in principle acceptable, still below elastic limit Since the stress during test is rather close to the elastic limit, we would like to propose the following: 28 January 2009 Hans Postema - CERN

CERN safety, question 3 (3) Our proposal: Test one equivalent circuit in the lab at 1.43x maximum operating Test all circuits installed in CMS at 1.25x maximum operating 28 January 2009 Hans Postema - CERN

Meeting with Safety 23/1/09 Dear Hans, Last week, you showed me your presentation which concerns the cooling circuits for the CMS pixels. For a design pressure of 57 bar, the level of stresses you mention (44MPa) is below the limit of 217/4=55MPa.For the test pressure of 1.43*57 bar, the level of stresses (63 MPa) is below the limit of 217/2.6= 83MPa. As the design looks fine for these conditions, I accept that a test at 1.43 times the design pressure is done on a representative piece of equipment in a lab (with representative supports, ...). I would like to add a destructive test of that piece of equipment under pressure (test carried out with water). For the pipes already installed, as you will carry out the tests with gas for cleanliness, please take 1.25 times the design pressure as test pressure. Can you also make sure that in the whole installation, there is no possibility of having cold gas-liquid trapped (between valves for example). In such case, protections against overpressure (safety valve or rupture disc) have to be installed. Looking forward to the tests, Benoit Delille 28 January 2009 Hans Postema - CERN

Summary With this system design, max coolant temp at 15 degrees C and safety valve at 57 bar, the currently installed copper tubes can be approved by CERN safety We will build one equivalent circuit for destructive testing by CERN safety We will pressure test the installed copper tubes with gas at 1.25x57=71 bar 28 January 2009 Hans Postema - CERN

Conclusion The most crucial step towards a CO2 cooling system has been achieved With this approval, the road to CO2 cooling for the CMS Tracker is OPEN! 28 January 2009 Hans Postema - CERN