OAWU Conference Seaside, Oregon August 2016

Slides:



Advertisements
Similar presentations
Filing Proofs or Affidavits 2010 Utah Water Users Workshop March 16, 2010 Jared Manning Division of Water Rights.
Advertisements

U.S. Pretrial Services and Probation Office Northern District of Ohio.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Southwest Florida Water Management District Rule Development Workshop Water Use Permitting August 22, 2013.
National Pollutant Discharge Elimination System -NPDES Permit Process-
Southwest Florida Water Management District Rule Development Workshop Water Use Permitting May 2013.
STATE OF OREGON WATER EFFICIENCY STANDARDS OAWU Conference Sunriver, Oregon March 2015 Lisa Jaramillo Water Right Services Division Oregon Water Resources.
Kara Denney Industrial Wastewater Permit Writer Water Quality Division.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
ARIZONA DEPARTMENT OF WATER RESOURCES SURFACE WATER RIGHTS UNIT.
Sector Planning Process Alachua County Commission July 8 th,
Water and Wastewater Certification 1 Water & Wastewater Reference Manual.
EDMR Electronic data submittal system Jeffrey A. Ewick, Section Chief Data and Information Services Section Electronic Discharge Monitoring Report.
Taking Care of Your Water Rights: Permits, Extensions & Certificates Oregon Association of Water Utilities August 2013 Lisa Jaramillo Water Right Services.
Rule 62-40, F.A.C. – What is it? The Water Resource Implementation Rule (State Water Policy). Required by Sec , F.S. Goals, objectives and guidance.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
How do 210 Water Reuse Authorizations relate to O&G Development? Jaya Zyman-Ponebshek, P.E. Assistant Director Water Quality Division.
Public Water Supplier Considerations Rural Water Association of Utah April 25, 2013 April 25, 2013 Utah Division of Water Rights Kirk Forbush, P.E. Regional.
Surveying principles 1 Public Water Suppliers S. Ross Hansen P.E., L.S. Region Engineer 4/10/2014 Rural Water Certification Class.
1 Water Right Conveyances Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) March.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Declaring Beneficial Use in Water Use Groups R
Interdistrict Transfers of Water and Local Sources First Land Resources and Regulatory Committee November 3, 2005 Land Resources and Regulatory Committee.
STATE OF OREGON WATER EFFICIENCY STANDARDS PNWS-AWWA Conference Eugene, Oregon May 2014 Lisa Jaramillo Water Right Services Division Oregon Water Resources.
Wastewater Reuse Oregon State University GEO 300 November 3, 2004 Russell Harding Department of Environmental Quality Water Quality Division (503)
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
WATER RIGHT CURRENTS Utah Division of Water Rights September 2009.
Policy for Maintaining Instream Flows in Northern California Coastal Streams Monitoring and Reporting Provisions for Water Rights Victoria Whitney Deputy.
1 Conveying Water Rights Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) April 2013.
1. Land Conservation Act (LCA) * Public Agency Webinar Public Acquisition Notification Procedure – A Step by Step Guide * LCA, also known as the Williamson.
1 Conveying Water Rights Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) March 2012.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Water Right Transfers OAR Chapter 690 Divisions 380, 382, 385, 77 CWRE Workshops – October, 2012 Susan Douthit District Analyst.
Declaring Beneficial Use in Water Use Groups R
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
SB 536 Study and Report WateReuse Florida November 9, 2015 Janet G. Llewellyn Office of Water Policy Florida Department of Environmental Protection.
Municipal Water Rights…… Water Law & Policy Seminars March 12, 2012 Kent L. Jones, P.E. State Engineer.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
30 Texas Administrative Code Chapter 210, Subchapter E Presented by Kara Denney September 23, 2015.
Sanitary Engineering Lecture 8. Water Reuse Water reuse describes the process whereby wastewater (it's include storm water which is a term used to describe.
Contractor’s Exemption Legislative Act No
Hazardous Waste Import-Export Final Rule Requirements and Implementation December 12, 2016.
Invoicing 2016 E-rate Program Applicant Training
Oregon Water Resources District Transfers
Submittal And Review Of New And Revised Water Quality Standards
2017 Environmental Trade Fair Shannon Gibson
2017 Llano Estacado Regional Water Plan Planning Group Meeting
Water Right Transfers OAR Chapter 690, Division 380
“Whiskey is for drinking, water is for fighting over.”
Florida and Reclaimed Water
Department of Community Development
Reclaimed Water Funding
Request for Approval of Cape Fear / Neuse River Basin Hydrologic Model
Georgia Update Jeff Cown Land Protection Branch
Michigan Dept. of Environmental Quality Water Resources Division
Single Event Violations
Voting by Federal Postcard Application (FPCA)
North Carolina Division of Water Resources
Voting by Federal Postcard Application (FPCA)
Lisa Jaramillo Transfer and Conservation Section Manager Kelly Starnes
Confidentiality Frequently Asked Questions
Water Law and Management
2018 Environmental Trade Fair Shannon Gibson
Multi-Sector General Permit: MSGP
Indiana Department of Environmental Management Office of Water Quality
Partnerships Florida Department of Agriculture and Consumer Services
USES OF DOMESTIC RECLAIMED WATER
2019 Environmental Trade Fair & Conference Monica Vallin-Baez
Indiana Finance Authority (IFA)
Presentation transcript:

OAWU Conference Seaside, Oregon August 2016 The Relationship Between Extended Water Use Permits & Water Management and Conservation Plans Lisa Jaramillo Water Right Services Division Oregon Water Resources Department

Water Use Permits Upon its issuance, the water use permit will specify the deadline for: Completing construction; and Beneficially using all of the water allowed under the permit.

Permit Extensions of Time If a permit holder cannot complete construction and/or accomplish full beneficial use of water by the permit’s deadline… An Application for Extension of Time can be submitted.

Extended Water Use Permits - Municipal and Quasi-Municipal Uses - An approved Extension of Time for most Municipal Water Use Permits and some Quasi-Municipal Use Permits will: Require submittal of a WMCP within 3 years; and Limit the amount of water that may legally be diverted or appropriated under the permit. (i.e., the “Development Limitations” Condition)

“Development Limitations” Condition A “Development Limitations” condition freezes the amount of water that a water supplier is legally authorized to divert under an extended permit. Based on maximum diversion rate (or duty, if applicable) for beneficial use accomplished before the permit’s most recently authorized completion date. (i.e., before the most recent extension) Reflects the “developed portion” of the permit. Cannot exceed diversion rate limitation until authorized by OWRD through the WMCP process.

The “Developed Portion” The “developed portion” of an extended permit refers to the maximum rate (or duty) of water diverted for beneficial use before the extension. Final Order approving an Extension of Time for Municipal or Quasi-Municipal Permits will identify the developed portion of the permit in the “Development Limitations” condition.

Sample “Development Limitations” Condition Permit Extension of Time Final Order: City of Anytown – Permit S-112345 (4.0 cfs) Development Limitations: Diversion of water beyond 1.75 cfs (out of the total permitted 4.0 cfs of water) under Permit S-112345 shall only be authorized upon issuance of a final order approving a Water Management and Conservation Plan under OAR Chapter 690, Division 86 that authorizes access to a greater rate of diversion of water under the permit consistent with OAR 690-086-130(7). The required Water Management and Conservation Plan shall be submitted to the Department within 3 years of this Final Order. Use of water under Permit S-112345 must be consistent with this and subsequent WMCPs approved under OAR Chapter 690, Division 86 on file with the Department…

The “Undeveloped Portion” In contrast, the “undeveloped portion” of an extended permit is… The portion of the permit that is the difference between the maximum rate specified in the permit and the maximum rate diverted for beneficial use before the extension The Extension of Time Final Order for a municipal or quasi-municipal permit will identify the developed portion of the permit in the Development Limitations condition. This developed portion will be a quantity that is less than the maximum rate (or duty) specified in the permit and represents the maximum amount of water the supplier may legally divert following approval of the extension. Maximum Allowed Rate of Permit Developed Portion Undeveloped Portion

Water is Red Light Water? The term “Red Light Water” refers to the portion of the extended permit that the supplier is not yet legally authorized to divert… The remaining amount of water above the specified diversion rate limitation in the most recent Development Limitations condition in an Extension of Time Final Order. (i.e., the “undeveloped portion”) The portion of the extended permit not currently authorized (i.e., “Greenlighted”) for diversion in a Final Order approving a WMCP.

What is Greenlight Water? The term “Greenlight Water” refers to the quantity of water beyond the “developed portion” of an extended permit to which the supplier has obtained legal authorization from OWRD to divert. Accomplished through the WMCP process.

Sample Scenario Sample Scenario – 4.0 cfs Permit Prior to Extension of Time… The supplier diverted 1.75 cfs for beneficial use. This is the “developed portion” of the extended permit. The remainder of the permit (2.25 cfs) is frozen and cannot be diverted. This is the “undeveloped portion” of the extended permit (or “Red Light Water”).

Sample Scenario - Requesting “Greenlight Water” - The City submits a WMCP requesting and justifying the need for water in quantities above the “developed portion.” Requesting 1.25 cfs of water be “Greenlighted” under the permit. Once approved… the City is legally authorized to divert a total of 3.0 cfs. (Developed Portion + Greenlight Water = 3.0 cfs) There is still 1.0 cfs of “Red Light Water” under the permit.

WMCPs and Requests for “Greenlight Water” Authorization to divert quantities of water beyond the amount specified in a “Development Limitations” condition… May only be granted through OWRD’s review and approval of a WMCP that requests “Greenlight Water.”

WMCPs and Requests for “Greenlight Water” To request “Greenlight Water,” the WMCP must include: A quantification of the amount of water the supplier needs under each extended permit over the next 20 years to help meet its projected demands for water; and The required documentation to support and justify the need for the “Greenlight Water” and that it is the most feasible and appropriate water supply alternative available for meeting those projected demands.

Justifying a Request for “Greenlight Water” The justification for “Greenlight Water” in the WMCP needs to consider alternative water sources, including: Interconnection with other municipal water suppliers or regional water management; and Water savings from implementation of conservation measures. The WMCP also needs to describe any mitigation actions the water supplier is taking to comply with state and/or federal legal requirements related to the water source.

Authorization of “Greenlight Water” If the WMCP provides clear justification that “Greenlight Water” is necessary and that the water supplier is managing and conserving its water in a responsible manner… OWRD will issue a Final Order that: Approves the WMCP; and Includes a new “Development Limitations” condition that specifically grants authorization to a greater rate of diversion under the extended permit.

Resources Municipal Water Management and Conservation Plan Guidebook (March 2015) www.oregon.gov/owrd/docs/wmcp_guidebook.pdf

Water Supply and Conservation Team Transfer and Conservation Section Contact Water Supply and Conservation Team Transfer and Conservation Section Kerri Cope Phone: 503-986-0919 Email: Kerri.H.Cope@wrd.state.or.us Chris Kowitz Phone: 503-986-0883 Email: Chris.C.Kowitz@wrd.state.or.us

Contact Lisa Jaramillo, Manager Transfer and Conservation Section Water Right Services Division Oregon Water Resources Department Phone: 503-986-0880 Email: Lisa.J.Jaramillo@wrd.state.or.us

Registrations of Reclaimed Municipal Water Use OAWU Conference Seaside, Oregon August 2016 Registrations of Reclaimed Municipal Water Use Kerri Cope Water Management and Conservation Analyst Oregon Water Resources Department

What is “Reclaimed Water?” As defined in ORS 537.131, 540.510 and 540.610, water that has been used for municipal purposes and after such use has been treated in a treatment works (NPDES or WPCF), and that as a result is suitable for direct beneficial use that could not otherwise occur.

The DEQ/OWRD Connection Use of Reclaimed Water is authorized by a National Pollutant Discharge Elimination System (NPDES) or Water Pollution Control Facility (WPCF) permit from Oregon Department of Environmental Quality (DEQ) under their Division 55 Rules for “Recycled Water” use.

The DEQ/OWRD Connection DEQ is the state’s lead agency on water reuse. DEQ issues NPDES and WPCF permits. DEQ and OWRD use different terminology for water reuse: DEQ uses the term “recycled” water; OWRD uses the term “reclaimed” water.

What are the Benefits? Beneficial use of this water with an OWRD “Registration” provides an exemption from OWRD’s permitting requirements. Reduces the quantity of warm, nutrient-rich wastewater that is discharged into local waterbodies.

What are the Benefits? No fee required for registration, so cheaper (free!) than the OWRD water right permit process. Can be used in place of, or supplemental to, an existing water right. Can provide revenue to municipalities and help meet their DEQ permit requirements.

Who Can Use This Water? Agricultural – Irrigation (nutrient content!). Golf Courses – Irrigation for Recreation. Industry – Cooling Systems, Boiler Feed, Process Water. Municipalities, etc. – Groundwater Recharge, Fire Protection, and Irrigation (ex. city park).

The Process ORS 537.132 provides the criteria under which the use of reclaimed water is exempt from OWRD water use permitting requirements. Exempt reclaimed water use requires: A DEQ-issued NPDES or WPCF permit and; An OWRD Reclaimed Municipal Water Use Registration and a Map showing the Place of Use (POU).

A Registration of Reclaimed Municipal Water form is filed with DEQ

Cont… DEQ signs the registration form, attesting to 537.132(1)(a)(b)&(c) and DEQ forwards the form to OWRD in Salem for evaluation (537.132 defined later in the presentation). OWRD staff evaluates the registration according to ORS 537.132 and coordinates with the local watermaster to determine feasibility, etc. (60 days).

What About Existing Water Rights? ORS 540.610(2)(h) – reclaimed water used in lieu of using water under an existing water right provides a rebuttal to the presumption of forfeiture for non-use of the water right. The Registration document itself is not proof of use. The DEQ permit requires an annual report of reclaimed water use (which provides proof of documentation to demonstrate use).

Clarification Does a Registration need to be filed if the reclaimed water use will occur inside the service boundary of the municipality that produced and treated (at a WCPF) the wastewater ? A Reclaimed Water Use Registration needs to be filed regardless of whether the reclaimed water use will occur inside or outside the service boundary.

Who’s Responsible? Under ORS 537.132(2), any person using or intending to use reclaimed water shall file a Reclaimed Water Use Registration form. The Registrant is not always the landowner where reuse will occur, nor the supplier of the reclaimed water. If there are multiple users of a city’s reclaimed water, then each user will need to submit a Registration with a map.

Say what? So here’s the deal: You and your neighbor are farmers. You both want to use “Central City’s” reclaimed water in addition to your current water rights. You will each need to submit a Reclaimed Water Use Registration form with a map showing your intended place of use.

What about Downstream Water Users? The statute states: If the wastewater discharge was more than 50% of the “total average flow” of the stream for 5 or more years, affected downstream water users have preference to use of the reclaimed water.

New Registration Process As previously stated, each person using or intending to use reclaimed water completes a separate Registration form and submits it to the DEQ permit writer along with the application for a DEQ permit (NPDES/ WPCF).

New Registration Process Registration must be signed by the Registrant (the water user) and the Water Supplier. Registrant must supply a map of water right application quality (Township, Range, Section, Q-Q) showing the Place of Use (POU).

New Registration Process DEQ signs the Registration form and affirms: (537.132(1)(a)(b)&(c) ) Once the application for a DEQ permit (NPDES/WPCF) is approved; the reuse will be authorized under that permit; They have determined, in consultation with ODFW, that the reuse will not have a significant impact on fish and; The intent of reuse is to improve stream water quality.

New Registration Process Then, DEQ sends the Registration form to the OWRD “Reuse Coordinator” in Salem (that’s me). Within 60 days of receipt of the Registration the Reuse Coordinator will: Email a copy to the appropriate Watermaster and; Enter the Registration into OWRD’s WRIS database.

New Registration Process Confer with Watermaster on streamflow impacts and to existing downstream water right holders. If the reuse is for aquifer recharge, confer with the appropriate OWRD Hydrogeologist.

Letter of Acceptance/Rejection A letter either accepting or rejecting the use will be sent to the registrant, watermaster and DEQ. Registration is tracked in OWRD’s Water Rights Information System (WRIS) database.

What about WRIS? Registrations will be coded as “RM” files (example RM-210). Data will include the maximum rate of the reuse and the place of use by T, R, S, Q-Q (so the water reuse and it’s location are searchable).

What about WRIS? A scanned image of the Registration form and of the map will be available. The Registration will be tied to existing water rights located on the same land (if applicable). The Registration will be valid as long as DEQ authorizes the reclaimed water use.

RM 210

So Basically…. The “Registrant” is the user of the reclaimed water. The Registration goes to DEQ with the NPDES/WPCF application. DEQ consults with ODFW, then signs off on the Registration and sends it to OWRD. Actual use of reclaimed water in lieu of using underlying water rights provides protection from forfeiture for non-use. For water reuse to be exempt from water right permitting, both a DEQ Permit and Registration are required.

Questions? Kerri H. Cope Water Management and Conservation Specialist (Water Reuse Coordinator) Kerri.H.Cope@WRD.state.or.us 503-986-0919