Rainfall-Runoff Modeling (2)

Slides:



Advertisements
Similar presentations
Hydrology Rainfall Analysis (1)
Advertisements

Hydrology Rainfall - Runoff Modeling (I)
Hydrology Rainfall - Runoff Modeling (II) Synthetic unit hydrographs
Hyetograph Models Professor Ke-Sheng Cheng
STATISTICS Joint and Conditional Distributions
Unit Hydrographs Ch-7 (Streamflow Estimation)
Hydrologic Analysis Dr. Bedient CEVE 101 Fall 2013.
Unit Hydrograph Reading: Applied Hydrology Sections , 7.5, 7.7,
HYDROLOGY (670441) Philadelphia University Faculty of Engineering
CHARACTERISTICS OF RUNOFF
R AINFALL -R UNOFF M ODELING O F W ADI Z IMAR. Prepared by Ahmad Tallal Abu-Hamed Mohamed Nemir Mohsen Osama Omar Nazzal Under the direction of Dr. Sameer.
Unit Hydrograph The Unit Hydrograph Unit Hydrograph Derivation
Watershed Management Runoff models
Applied Hydrology RSLAB-NTU Lab for Remote Sensing Hydrology and Spatial Modeling 1 Rainfall-Runoff Modeling (2) Professor Ke-Sheng Cheng Dept. of Bioenvironmental.
Unit Hydrograph Reading: Sections , 7.5, 7.7,
Unit Hydrograph Theory
Transforming the Runoff
Lecture ERS 482/682 (Fall 2002) Rainfall-runoff modeling ERS 482/682 Small Watershed Hydrology.
UH Unit Hydrograph Model Response Functions of Linear Systems Basic operational rules:  Principle of Proportionality: f(cQ ) = c  f(Q)  Principle of.
Synthetic Unit Hydrographs
CE 3372 – Lecture 10. Outline  Hydrology Review  Rational Method  Regression Equations  Hydrographs.
Hydrology & Water Resources Engineering
Estimating Qmax Using the Rational Method
Simulating the Hydrologic Response
Evaluation for the Effects of Flood Control
Precipitation Types Important for Real Time Input and Forecasting
HEC-HMS Runoff Computation.
Urban Storm Drain Design: Rainfall-Runoff relations.
ERT 246 Hydrology & Water Resources Engineering Siti Kamariah Md Sa’at School of Bioprocess Engineering, UniMAP.
DES 606 : Watershed Modeling with HEC-HMS Module 8 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Hydrologic Analysis Dr. Phil Bedient Rice University.
Engineering Hydrology Discussion Ch. #6 Hydrographs
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Synthetic UH Definition: Synthetic Hydrograph is a plot of flow versus time and generated based on a minimal use of streamflow data. Example: A pending.
Basic Hydrology: Rainfall-Runoff – I
LibHydro.
Hydrological Forecasting. Introduction: How to use knowledge to predict from existing data, what will happen in future?. This is a fundamental problem.
CHAPTER 6: Hydrographs Engineering Hydrology (ECIV 4323) -1 Instructor: Dr. Yunes Mogheir 2015.
HYDROGRAPH is a graph showing the rate of flow (discharge) versus time past a specific point in a river, or other channel or conduit carrying flow. It.
Hydrology & Water Resources Engineering ( )
Sanitary Engineering Lecture 4
UNIT – III FLOODS Types of floods Following are the various types of floods: 1.Probable Maximum Flood (PMF):This is the flood resulting from the most sever.
HYDROLOGY Lecture 10 Unit Hydrograph
Rainfall-Runoff modeling
Kristina Schneider February 27, 2001
Modified Rational Method
Routing surface runoff to a basin outlet
STATISTICS POINT ESTIMATION
Modified Rational Method for Texas Watersheds
Modified Rational Method for Texas Watersheds
Hydrologic Analysis (Bedient chapter 2)
Basic Hydrology & Hydraulics: DES 601
FLOOD ROUTING Topic 5 River/Stream Routing Muskingum Method.
Using a unit hydrograph to determine storm streamflow
Rainfall-Runoff Modeling
Hydrologic Analysis PART 1
Precipitation Analysis
Hydrograph Computation
Dr. Phil Bedient Rice University
Stochastic Hydrology Hydrological Frequency Analysis (I) Fundamentals of HFA Prof. Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering.
Hyetographs & Hydrographs
Hydrographs-Cont..
Floods and Flood Routing
Find: Qp [cfs] shed area tc C 1,050 1,200 1,300 1,450 A B C Q [acre]
Preciptation.
Preciptation.
Preciptation.
Preciptation.
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
Stochastic Hydrology Simple scaling in temporal variation of rainfalls
Presentation transcript:

Rainfall-Runoff Modeling (2) Professor Ke-Sheng Cheng Dept. of Bioenvironmental Systems Engineering National Taiwan University

Peak flow estimation Rational method Empirical method Unit hydrograph technique

The concept of Isochrones Let’s assume that raindrops fall on a spatial point x within the watershed require an amount of travel time t(x) to move from point x to the basin outlet.

Contour lines of the travel time are termed as isochrones (or runoff isochrones) of the watershed. The highest value of isochrones represents the time of concentration of the watershed. Assume the effective rainfall has a constant intensity (in time) and is uniformly distributed over the whole watershed, i.e.,

If the effective rainfall duration tr = 2 hours, what is the peak direct runoff at the basin outlet? When will the peak flow occur? When will the direct runoff end?

The time of peak flow occurrence is dependent on the relative magnitude of Ai’s.

If the effective rainfall duration tr = 10 hours, what is the peak direct runoff at the basin outlet? When will the peak flow occur? When will the direct runoff end?

The watershed storage effect is neglected.

Under the assumptions of constant intensity and uniform spatial distribution for effective rainfall, the peak direct runoff occurs at the time t = tc, if the duration of the effective rainfall is longer than or equal to tc.

However, for storms with duration shorter than tc, the peak flow and its time of occurrence depend on relative magnitude of contributing areas (Ai’s).

Rational method for peak flow estimation Consider a rainfall of constant intensity and very long duration occurring uniformly over a basin. The runoff gradually increases from zero to a constant value as shown in the following figure.

Practical application of the rational method for peak flow estimation Calculating the time of concentration, tc. Determining the average rainfall intensity i from the IDF curve using tc as the storm duration and a predetermined return period T. Calculating the runoff coefficient, c. Calculating the peak direct runoff In engineering practice, it is normally restricted to catchments with basin area not exceeding 15 km2. For areas with complicated landuse/landcover condition, applications of the rational method should be restricted to even smaller catchments.

Unit hydrograph of the modified rational method Original rational method only estimates the peak flow. It does not yield a complete runoff hydrograph. Neglecting the watershed storage effect. 2tc tc+tr

Synthetic unit hydrographs For areas where rainfall and runoff data are not available, unit hydrograph can be developed based on physical characteristics of the watershed. Clark’s IUH (time-area method) SCS unit hydrograph Linear reservoir model (Nash model)

Clark’s IUH (time-area method) The concept of isochrones Isochrones are lines of equal travel time. Any point on a given isochrone takes the same time to reach the basin outlet. Therefore, for the following basin isochrone map and assuming constant and uniform effective rainfall, discharge at the basin outlet can be decomposed into individual contributing areas and rainfalls.

Contributing area and contributing rainfall

Using the basin isochrone map, the cumulative contributing area curve can be developed. The derivatives or differences of this curve constitute the instantaneous unit hydrograph IUH(t). Time base of the IUH is the time of concentration of the watershed.

If the effect of watershed storage is to be considered, the unit hydrograph described above is routed through a hypothetical linear reservoir with a storage coefficient k located at the watershed outlet. For a linear reservoir with storage coefficient k, we have

Consider the continuity of the hypothetical reservoir during a time interval t.

Example. A watershed of 1000-acre drainage area has the following 15-minute time-area curve. The storage coefficient k of the watershed is 30 minutes. Determine the 15-minute unit hydrograph UH(15,t).

Area between isochrones t = 0 and t = 0. 25 hr is 100 acres Area between isochrones t = 0 and t = 0.25 hr is 100 acres. Since we are interested in the unit hydrograph UH(15-min, t), the rainfall intensity in the time period (0.25 hr) should be 4 inch/hr. Therefore, the ordinate of UH(15-min, t) at time t = 0.25 hr is: 4 inch/hr  (1/12 ft/inch)  (1/3600 hr/sec)  100 acres  (43560 ft2/acre) = 403.33 cfs

Synthetic unit hydrographs Clark’s IUH (time-area method) SCS unit hydrograph Linear reservoir model (Nash model)

SCS unit hydrograph Note: tb > tr+tc. The SCS UH takes into account the storage effect.

Misuse of SCS UH – an example tc=0.5

Synthetic unit hydrographs Clark’s IUH (time-area method) SCS unit hydrograph Linear reservoir model (Nash model)

Nash’s linear reservoir model Consider a linear reservoir which has the following characteristics:

Summary of the Conceptual IUH model Assumption: Linear Reservoir S(t)=kQ(t)

Relationship between IUH and the S curve

The Nash Linear Reservoir Model

The above equation represents a gamma density function, and thus the integration over 0 to infinity yields 1 (one unit of rainfall excess).

Parameter estimation for n and k The IUH of the n-LR system is characterized by a function which is identical to the gamma density. =M1 =M2

The direct runoff can be expressed as a convolution integral of the rainfall excess and IUH, i.e. If the direct runoff hydrograph (DRH) is divided by the total volume of direct runoff, it can be viewed as a density function. Thus, denotes a density function of a random variable t. The first moment of this rescaled DRH is

The second moment of the rescaled DRH is Similarly, the first and second moments of the rescaled effective rainfall can be respectively expressed as

It can be shown that Thus, given the ERH and DRH, the parameters n and k can obtained from the above equations.

Calculation of

Calculation of

坡地開發滯留池之水文設計 Hydrological Analysis for Detention Pond Design in Hillslope Development

坡地開發水文設計相關規範

現行設計規範之檢討

逕流量分析 (水土保持技術規範第 十七條 ) 洪峰流量之估算,有實測資料時,得採用單位歷線分析;面積在一千公頃以內者,無實測資料時,得採用合理化公式(Rational Formula)計算。合理化公式如下:

滯洪設施規劃設計原則 (水土保持技術規範第 九十五 條 ) 滯洪設施規劃設計原則 (水土保持技術規範第 九十五 條 )

滯洪量之估算 (水土保持技術規範第 九十六 條 )