09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.

Slides:



Advertisements
Similar presentations
09/02/2006HV, LV systems status for Magnet Test1 Hardware needed for CC Green barrack Balcony barrack W+1W+2 Y+2 HV LV EASY link s10 s11 s V three-phase.
Advertisements

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
The Alice-ToF HV system and the PVSS control system E. Scapparone for the Alice-Tof group DCS Workshop, June 16 - The ToF High Voltage layout ; - Component.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
FP420 Low and high voltage supply Henning E. Larsen, INFN/Univ. of torino April
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Detector Control System
Cables for the RE4 Upscope in CMS
LKr status R. Fantechi.
ATLAS MDT HV – LV Detector Control System (DCS)
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
RPC Barrel HV & LV system Lappeenranta University
Cosmic Ray Tracker and Detector Control System at the GIF++
HV & LV status LV system in W+1 and W+2 is OK
RPC HV&LV systems Introduction Detector description Requirements
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
CSC Electronics Installation and Commissioning CSCE I&C
Regional Cal. Trigger Milestone: Production & Testing Complete
RPC Detector Control System
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
RPC Detector Control System
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
RPC Detector Control System
HV & LV status LV system in W+1 and W+2 is OK
RPC Detector Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta

DT setup for Magnet test Subsystems centrally controlled HV LV Minicrates (DAQ and trigger) RunControl 09/02/2006 HV, LV systems status for Magnet Test

Magnet test and cosmic challenge We plan to have 3 DT sectors in 2 wheels (YB+2 and YB+1) ~ total of 14 DTs. HV needs: 1 SY1527, 5 A876 and 14 A877. We are ready to use a version of HV DCS which is completely integrated with the DCS of CMS (done in January 2005). This version uses FSM and Configuration and Condition DBs. We can access our data also from Oracle with ROOT. LV Needs: 2 A3486, 1 A1676A, 5 A3009, 8 A3050, 2 A3100. We just received part of this material and have developed the PVSS control project for this EASY equipment. 09/02/2006 HV, LV systems status for Magnet Test

HV, LV systems status for Magnet Test HV Hardware setup Global HV+ Global HV- LV A877  powers 1 DT A876 HV THETA HV PHI1 HV PHI2 MacroChannels (Set ON/OFF, RuP,…) HV LAYER1 OutputChannels (Set V0, i0…) Wires1 Wires0 Cathodes Strips 09/02/2006 HV, LV systems status for Magnet Test

HV, LV systems status for Magnet Test HV Magnet Test YB+1 HV +,- (x5) Counting room 1 Kerpen LV (x5) SY1527 A877 A877 A877 A877 A877 Patch panel A876 A876 A876 A876 A876 5 A876 Comm. (x2) 1 LV Novacavi 5 A877 HV- HV+ LV 1 Comm. Novacavi Comm. YB+2 HV +,- (x9) A877 Comm. (x3) Patch panel Patch panel A877 A877 A877 A877 A877 A877 A877 A877 1 Kerpen 1 Comm. Novacavi 2 LV Novacavi 1 A876 = 1 Comm. 4 LV 4 HV+ 4 HV- LV (x9) 9 A877 09/02/2006 HV, LV systems status for Magnet Test

HV, LV systems status for Magnet Test LV Magnet Test (solution 1a) Counting room Comm. Comm. EASY 3000 A3486 A1532 A1676 Serv. Serv. CH0 48 V Power Comm. 48V Comm. EASY 3000 IN OUT Serv. A3486 Serv. CH0 CH1 EASY 3000 Comm. IN Patch panel ? Serv. 48 V Power 09/02/2006 HV, LV systems status for Magnet Test

HV, LV systems status for Magnet Test LV Magnet Test (solution 1b) Counting room Comm. Comm. EASY 3000 A3486 A1532 A1676 Serv. Serv. CH0 48 V Power Comm. 48V Comm. EASY 3000 IN OUT Serv. A3486 Serv. CH0 CH1 EASY 3000 Comm. IN Patch panel ? Serv. 48 V Power 09/02/2006 HV, LV systems status for Magnet Test

HV, LV systems status for Magnet Test HV Sector Test HV+ x 4 HV- x 4 4 A877 A876 A877 A877 A877 A877 SY1527 LV x 4 Comm. 1 A876 = 1 Comm. 4 LV 4 HV+ 4 HV- 09/02/2006 HV, LV systems status for Magnet Test

HV, LV systems status for Magnet Test LV Sector Test LV Rack 48 V Serv. (cable missing) A1676 48 V Serv. SY1527 Comm. EASY 3000 Comm. (flat 50 pins) (cable missing) A3486 48 V Power A1676 can be housed in the same SY1527 also used for the A876 (HV) 09/02/2006 HV, LV systems status for Magnet Test

HV, LV systems status for Magnet Test HV hardware SY1527 1 A876 5 A877 14 Crates 3 HV cables Patch panels Counting room 2 Patch panels Wheels 2 Kerpen cables ~ 100 m 2 Novacavi LV cables ~ 100 m 3 Novacavi communication cables 2 Cables in counting room HV cables (SHV connectors) ~ 2 m 28 LV cables ~ 2 m 14 Communication cables ~ 2 m 5 Cables on wheels HV cables (SHV connectors) ? m 28 LV cables ? m 14 Communication cables ? m 5 Communication cables ~ 10 cm 9 09/02/2006 HV, LV systems status for Magnet Test

HV, LV systems status for Magnet Test LV hardware SY1527 1 A1676A 1-2 A3486 2-3 EASY 3000 3 A3009 5 A3050 8 A3100 2 Now Missing A1676 1 A3486 1-2 Easy 3000 1 A3009 4 A3050 6 LV Cables Communication Cables SCEM 04.22.22.750.9 ~ 100 m 2 Cables SCEM 04.22.22.750.9 ~ 2-3 m 2-3 48V Service Cables (connectors PP75 -> PP45) ~ 100 m 2 Cable (banana plug -> PP45) ~ 3 m 1 Cables (connectors PP45 -> PP45) ~ 2-3 m 3 48V Power Cables (connectors PP75 -> PP75) ~ 2-3 m 3 09/02/2006 HV, LV systems status for Magnet Test

Magnet test and cosmic challenge We want to test the complete HV chain using the final Kerpen and Novacavi cables, and the patch panels which connect the A876 boards located in the control room to the A877 boards located in the racks on the detector balconies. We have to prepare the cables (material is available) and the patch panels. Will use 2 rack mounted PCs: 1 for the HV control and one for the DT supervisor and the LV control. 09/02/2006 HV, LV systems status for Magnet Test

Some slides from PVSS HV control software running at SX5 control room 09/02/2006 HV, LV systems status for Magnet Test

HV, LV systems status for Magnet Test 09/02/2006 HV, LV systems status for Magnet Test

HV, LV systems status for Magnet Test 09/02/2006 HV, LV systems status for Magnet Test

HV, LV systems status for Magnet Test 09/02/2006 HV, LV systems status for Magnet Test

HV, LV systems status for Magnet Test 09/02/2006 HV, LV systems status for Magnet Test

HV, LV systems status for Magnet Test 09/02/2006 HV, LV systems status for Magnet Test

HV, LV systems status for Magnet Test Conclusions For the magnet test we plan to power a total of 14 DTs in sector 10 of wheel YB+1 and sectors 10 and 11 of wheel YB+2. The HV system used will be the final one manufactured by CAEN. PVSS project with FSM integrated with the central CMS DCS will be available for both HV and LV systems. First prototype PVSS project already running at SX5. We are missing some EASY modules. We did not order 1 A3009 and 1 A3050. Want to use final cables, patch panels, etc. which so far we are missing for both HV and LV. 09/02/2006 HV, LV systems status for Magnet Test