Future Physics at HERMES

Slides:



Advertisements
Similar presentations
LHCb Alignment 12 th April 2007 S. Viret Coseners Forum « LHC Startup » 1. Introduction 2. The alignment challenge 3. Conclusions.
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Interactions of hadrons in the SiW ECAL (CAN-025) Philippe Doublet - LAL Roman Pöschl, François Richard - LAL CALICE Meeting at Casablanca, September 22nd.
Cluster Threshold Optimization from TIF data David Stuart, UC Santa Barbara July 26, 2007.
October 20th, 2006 A. Mazzacane 1 4 th Concept Software First Results.
Roberto Francisco Pérez Benito On behalf the HERMES Collaboration European Graduate School Lecture Week on Hadron Physics Jyväskylä, Aug 25-29, 2008 HERMES.
1 CMS Tracker Alignment and Implications for Physics Performance Nhan Tran Johns Hopkins University CMS Collaboration SPLIT
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
SSD Status P. Christakoglou (NIKHEF-UU) for the SSD collaboration Thanks to: Marco vL, Enrico, Mino, Marek and Massimo.
Beam test results of Tile/fiber EM calorimeter and Simulator construction status 2005/03/05 Detector Niigata University ONO Hiroaki contents.
Calibration of the ZEUS calorimeter for electrons Alex Tapper Imperial College, London for the ZEUS Collaboration Workshop on Energy Calibration of the.
Experimental Setup of the H8-RD22 Experiment Massimiliano Fiorini (on behalf of the H8-RD22 Collaboration) University of Ferrara – INFN Ferrara CARE HHH.
Calibration of the new Particle Identification Detector (PID) Tom Jude, Derek Glazier, Dan Watts.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
STAR Collaboration Meeting Rene Bellwied – Wayne State University July 2004 SVT Calibration and STI tracking status An update of work since the SVT review.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
Muon-raying the ATLAS Detector
A recoil detector to measure hard exclusive reaction at HERMES experiment Roberto Francisco Perez Benito Hyytiälä, September 2006 Roberto Francisco.
MINERvA Main INjector ExpeRiment for -A is the symbol for the neutrino. The beam that is sent to MINERvA is made out of neutrinos. In chemistry, an A stands.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
First CMS Results with LHC Beam
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
Mike HildrethEPS/Aachen, July B Physics Results from DØ Mike Hildreth Université de Notre Dame du Lac DØ Collaboration for the DØ Collaboration.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Ignazio Vilardi DUBNA SPIN 07, September Hermes Recoil Detector Status Ignazio Vilardi On behalf of the HERMES Collaboration DUBNA-SPIN-07 September.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
CLAS12 – CND PARAMETERDESIGN VALUE Detector typeBarrel of scintillators Angular coverage40 o to 120 o Number of radial layers3 Number of azimuthal segments48.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
Villa Olmo, Como October 2001F.Giordano1 SiTRD R & D The Silicon-TRD: Beam Test Results M.Brigida a, C.Favuzzi a, P.Fusco a, F.Gargano a, N.Giglietto.
Beam direction and flux measured by MUMON K. Matsuoka (Kyoto) for the MUMON group Contents: 1.Horn focusing effect 2.Beam stability (direction/flux) 3.Beam.
A N DY Status Commissioning with colliding beams L.C.Bland, for AnDY 27 March 2012 Time Meeting, BNL.
Mitglied der Helmholtz-Gemeinschaft Hit Reconstruction for the Luminosity Monitor March 3 rd 2009 | T. Randriamalala, J. Ritman and T. Stockmanns.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
January 2009 offline detector review - 2 nd go 1 ● Offline – Geometry – Material budget – Simulation – Raw data – OCDB parameters – Reconstruction ● Calibration.
y x Vincenzo Monaco, University of Torino HERA-LHC workshop 18/1/2005
CEPC ScECAL Optimization for the 3th CEPC Physics Software Meeting
Tracking detectors/2 F.Riggi.
RPC – status / results Blanco On behalf of HADES RPC Group
Roberto Francisco Perez Benito
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
Particle detection and reconstruction at the LHC (IV)
The Status of the Data Analysis of the Beam Test at FZJ
Hermes Recoil Detector Status
CLAS12 Analysis and First Experiment Organization
Panagiotis Kokkas Univ. of Ioannina
Detection of muons at 150 GeV/c with a CMS Preshower Prototype
MICE Collaboration Meeting
CMS Preshower: Startup procedures: Reconstruction & calibration
The Compact Muon Solenoid Detector
Deeply Virtual Compton Scattering at HERMES
HERMES Status DESY PRC May 2007 J Stewart.
5% The CMS all silicon tracker simulation
ScECAL+AHCAL+TCMT Combined Beam FNAL
HPS Collaboration meeting, JLAB, Nov 16, 2016
Geometry of experimental setup for studies of inverse kinematics reactions with ROOT Students*: Dumitru Irina, Giubega Lavinia-Elena, Lica Razvan, Olacel.
Preparation of the CLAS12 First Experiment Status and Time-Line
Using Single Photons for WIMP Searches at the ILC
Monte Carlo study of the DVCS process on nuclear target
Imaging crystals with TKR
Overview on hard exclusive production at HERMES
Reports for highly granular hadron calorimeter using software compensation techniques Bing Liu SJTU February 25, 2019.
Mini Tower Preliminary Results
LHCb Alignment Strategy
Michele Faucci Giannelli
Status of the η/η’ run (April 2009)
Presentation transcript:

Future Physics at HERMES Random Thoughts on HERMES No, I’m not speaking for 90 minutes… A Little History The Recoil Epoch (I.e., stolen slides) Concluding Remarks (sermonette) Ed Kinney University of Colorado, Boulder, USA 1 July 2007 HEDT Symposium

The Recoil Detector Epoch Physics Focus on Exclusive Reactions and GPDs DVCS 1 July 2007 HEDT Symposium

First Observations of DVCS… 1 July 2007 HEDT Symposium

Factorization 1 July 2007 HEDT Symposium

Wigner Transforms (1932) 1 July 2007 HEDT Symposium

3D Pictures of the Proton!!! 1 July 2007 HEDT Symposium

Measuring DVCS with true exclusivity Recoil Detector Measuring DVCS with true exclusivity 1 July 2007 HEDT Symposium

Recoil Detector Overview 1 Tesla Superconducting Solenoid Photon Detector 3 layers of Tungsten/Scintillator PID for higher momentum detects Δ+pp0 Scintillating Fiber Detector 2 Barrels 2 Parallel- and 2 Stereo-Layers in each barrel 10° Stereo Angle Momentum reconstruction & PID Silicon Detector 16 double-sides sensors 10×10 cm2 active area each 2 layers Inside HERA vacuum momentum reconstruction & PID HERA BEAM Target Cell 1 July 2007 HEDT Symposium

HERMES Recoil Detector timeline From 1996 through 2005 HERMES ran with the polarized H/D target. November 2005 the ABS was removed. In January 2006 the recoil detector was installed. February started data taking. Scintillating fiber detector worked immediately. Silicon detector had serious beam induced noise. Target and silicon damaged in May 2006. Modified target installed July with repaired SI. Timing problem with Photon detector also fixed in July. Full detector operations since September 2006. Timing on silicon final. 1 July 2007 HEDT Symposium

First experience with the Recoil Silicon Detector Pedestal Stability ~1-2 channel shift expected caused by HERA. Observed typically 4. Surprise! 0.5% of the strips couple much stronger to the beam. Pedestal correction due to beam current now implemented. Fine tuning still necessary. High-Low gain ratio OK. Energy Calibration Offline calibration seems not valid. Use “punch-though” point as absolute gain. Use MIP particle for a strip by strip relative calibration. Crosstalk/clustering still under study 1 July 2007 HEDT Symposium

Recoil Detector Alignment Six parameters (three translations and three rotations) which are common for all tracks are fitted Each track is fitted with a straight line taking into account alignment parameters at current iteration After iterative procedure converges it is repeated with new initial values of alignment parameters to be sure that alignment procedure does not depend on initial approach Residuals and dependence of residuals on coordinates used as a tool to check alignment procedure 1 July 2007 HEDT Symposium

Residuals for the SFT from cosmic data Parallel top =0.28mm SFT Parallel Bottom =0.31mm 1mm fibers 1 July 2007 HEDT Symposium

Data Tracking Full tracking is in production including alignment. Efficiency of the tracking algorithm studied on MC and found to be 98.4 %. Starting to study the efficiencies residuals and ghost tracks. 1 July 2007 HEDT Symposium

Running 7.4M DIS e- 2006 20M DIS e+ 2006 13M e+ 2007 maybe 20M in July 47M DIS for the unpol. Run 1M DIS ~24pb-1 ~ 1 fb-1 proposed for our recoil detector running. Not e+ e- balanced due to the initial startup problems. 10 M DIS on deuterium in addition. 1 July 2007 HEDT Symposium

Many Challenges ahead!!! Finish “Pre-Recoil” Analyses and publish! Complete the analysis commissioning of the recoil and release the first physics results!! Publish, publish, publish!!! Get your degree!!! Publish, publish, publish!!! Get your degree!!! 1 July 2007 HEDT Symposium

1 July 2007 HEDT Symposium

1 July 2007 HEDT Symposium

We must get the most from our data while the bells are still ringing!!! 1 July 2007 HEDT Symposium

To help you make great measurements!!! Why am I here? To help you make great measurements!!! Take care of paperwork :( Maintain Research Support Keep the Collaboration Involved! 1 July 2007 HEDT Symposium

A HERMES Constant Thanks to Sabine!!! 1 July 2007 HEDT Symposium

Critical Component of HERMES Success 1 July 2007 HEDT Symposium

The HERMES Research Trifecta Working on exciting physics Working with brilliant colleagues Working with colleagues who became dear friends Thanks to everyone for the experience of a lifetime! 1 July 2007 HEDT Symposium