TANB Integration – LS2 BLM Relocation Proposal C4R8 and C4L8

Slides:



Advertisements
Similar presentations
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Concept for the New Detector Chamber at the ESR Ion beam Internal Target Region  Lab *)  Flange axis Covered  range Flange size in mm A90° – 80°83°95°
Very Forward Detectors Workshop on beam position monitoring and detector alignment.
1 BLM 2 BLM 4 BLM 2 BLM 2( BLM+SEM)3 BLM 2 BLM 4 BLM 3 BLM1 (BLM+SEM)3 BLM 2 BLM 1 SEM 1 BLM 1 (BLM+SEM) 1 BLM BPM 1 BLM 2 BLM 4 BLM2 BLM 2( BLM+SEM)3.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
3/7/2002SLTC1 An LHC Beam-Beam Long- Range Simulator for the SPS Miniteam: J-P Koutchouk/BI, G. de Rijk/MS, F. Zimmermann/AP Tech. Coordination: J. Camas/BI.
Magnet Motion Produces Luminosity Loss. NLC Feedback Operation Kicker Gain Bunch Charge Measure deflected bunches with BPM and kick other beam to eliminate.
Alice overview New detector and chamber ALICE TC.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
23 rd WP8 Bi-weekly meeting Lukasz Krzempek (TE-VSC-DLM) TAS-Q1 – vacuum equipment design.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
Mechanical Integration for the AD at LNL. Overview New reaction chamber and beam-line Telescopic Beam Line Beam Dump Summary.
FP420 R&D Project – Brainstorming session on mechanics 28 March 06 1 D. D. INFN To/CERN PH CMM FP420 Integration Environment.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
TAS-Q1 Status & what if exercise Etude [HL-LHC] TAS-Q1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
The reading is 7.38 mm. The reading is 7.72 mm.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Blind area specification from Doros MD
Collimation Activities during EYETS
TCT BLM response from tertiary halo at 6.5 TeV
L. Gentini, A. Bertarelli, F. Carra
Alignment of VSC components along LSS 1&5
ELENA installation and commissioning status
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Installation of an Instrument on a CERN machine
Preliminary Y-chamber specifications – First draft
Components for the Machine-Interface Regions
Transfer line test: Beam stability measurements
M. Alcaide Leon, Paolo Fessia
LHC Beam Vacuum activities during YETS LS2
Region between TAXN and D2 in HL-LHC IR1/5: Implications on Collimator Design Alessandro Bertarelli, L. Gentini (EN/MME) On behalf of the LHC.
M. Alcaide Leon, Paolo Fessia
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
NSW envelopes New Small Wheel 15/02/2013 M. Ciapetti - G. Spigo.
SPS Planning for the EYETS Meeting 8 (07/12/2016)
A very first look at siting issues
New Design for Beam Test Structure
The 11T cryo-assembly: summary of design and integration aspects
Control systems plans & activities for HL-LHC during LS2
Disabling Rules.
CNGS Proton Beam: Introduction
LARP Phase II Secondary Rotatable Collimator
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
WP3 Meeting – December the 10th 2015 H. Prin
BLM planning 24/02/2014.
LHCb VErtex LOcator ENGINEERING DEPARTMENT
LS1 status 28/04/2014.
IR2 aperture measurements: results, actions and proposal
Two-beam Test-stand Design and Construction Status
HL-LHCV1.4 (BI) R. De Maria WP13 meeting 3/9/2018.
LS3 Study & Readiness Meetings
HL-LHC - WP15 modifications Coffrets Prise C4L8
HL-LHCV1.4 (BI) R. De Maria WP13 meeting 3/9/2018.
L. Gentini, M. Giovannozzi, M. Gonzalez, M. Krupa, H. Mainaud Durand,
Presentation transcript:

TANB Integration – LS2 BLM Relocation Proposal C4R8 and C4L8 M. Gonzalez de la Aleja, P. Santos Diaz 18/09/2017

LS2 - TANB area - C4R8 BLM relocation proposal for L8 LS2 layout TCTPV *According to 3D model for L8, distance between BLM axis and Beam axis: 170mm Proposal LS2 layout Present BLM* ≈ 200mm Min. distance needed: 30mm Proposal: Move BLM: - about 200mm towards the TCT (-y) - some mm towards the QRL (-x) Bake-out jacket (20mm thickness) ≈ 240mm TCTPV Just a minimum distance of ≈ 30 mm around the ion pump must be respected. 170mm IP8 Ion pump BPM y BLM really close to the new BPM position for LS2 layout x

LS2 - TANB area - C4R8 BLM relocation proposal for L8 LS2 layout TCTPV Min. distance needed: 30mm The aim is to provide an easier access for: - installation of bake-out jacket - Alignment of BPM Bake-out jacket (20mm thickness) Access for baking-out and BPM alignment ≈ 240mm TCTPV BPM alignment IP8 Ion pump ≈ 515 mm BPM alignment BPM y x

LS2 - TANB area - C4R8 BLM relocation proposal for L8 LHC Pictures L8 (Sept 2016) BLM Cable trays

LS2 - TANB area - C4R8 BLM relocation proposal for R8 LS2 layout TCTPV *According to 3D model for R8, distance between BLM axis and Beam axis: 190mm Proposal LS2 layout ≈ 150mm Present BLM* Min. distance needed: 100 mm Proposal: Move BLM: - about 150mm towards the TCTPH (y) Bake-out jacket (20mm thickness) TCTPV 190mm IP8 BPM Ion pump y x

LS2 - TANB area - C4R8 BLM relocation proposal for R8 LS2 layout TCTPV Bake-out jacket (20mm thickness) Access for baking-out ≈ 285mm TCTPV IP8 BPM ≈ 300mm Ion pump BPM alignment New BPM support y x

LS2 - TANB area - C4R8 BLM relocation proposal for R8 LHC Pictures R8 (Sept 2016) BLM Cable trays