HMA Follow On Activities

Slides:



Advertisements
Similar presentations
Agenda Session (75 minutes duration, Friday sessions are 90 minutes) Co-lead introduces the session (5 minutes) –repeat of one chart from opening plenary.
Advertisements

Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
Project Execution.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
EOSC Generic Application Security Framework
Jürgen Walther Office of the Interministerial Committee for Geo Information (IMAGI) Coordination Office GDI-DE Federal Agency for Cartography and Geodesy.
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
PI2134 Software Engineering IT Telkom.  Layered technology  Software Process  Generic Process (by Pressman)  Fundamental activities (by Sommerville)
Work package in ABC III Specific Contract with PwC/interactive instruments on implementation of INSPIRE validator Clemens Portele, interactive instruments.
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
HMA 5-6 July 2010 – Slide 1 Daniele Marchionni Elsag Datamat Stefania Pappagallo Elsag Datamat HMA Follow On Task 4 - Order MTR 5-6 July 2010.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Progress Meeting 26 Nov 2008, by.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Frascati, 15 February 2012 Slide 1 DREAM Task 4 Feasibility Analysis Server and Client - Implementation plans for SPS within the DREAM project Presentation.
1 HMA Follow-on – Negotiation Meeting - Task 4 ESRIN – 24/06/2009 Issue: 1.0.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Frascati, 2-3 July 2008 Slide 1 CITE tests for and HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Nicolas LESAGE, IGN.
HMA-FO ODA, January 2011 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Acceptance.
HMA-FO ODA, February 2010 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Preliminary.
Page /06/2014HMA-S Final Presentation - 11/06/2014 HMA for Science Executive Summary Y. Coene, Spacebel s.a. C. Gizzi, Airbus Defence and Space Final.
HMA-T Progress Meeting 26 November 2008 Slide 1 IMAA-CNR activity report HMA-T Progress Meeting 26 November 2008 S. Nativi, E. Boldrini, F. Papeschi IMAA-CNR.
5 July 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) MTR 5 July.
HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
AR meeting Esrin, 26. January 2011 Slide 1 Ordering Services for EO Products Abstract (ATS) and Executable (ETS) Test Suite HMA FollowOn – Task 4 AR Meeting.
Spacebel - Hoeilaart, February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
HMA 23 Feb 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order 23 February 2011.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
FedEO KO 5 June 2007 Slide 1 FedEO Catalogue Session. …
Frascati, 2-3 July 2008 Slide 1 User Management compliance testing for G-POD HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Andrew Woolf, STFC Rutherford.
Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo.
SQA project process standards IEEE software engineering standards
HMA Follow On Activities
HMA Follow On Task 4 - Order Final Presentation June 2011
CEN 202 “Space Standardisation”
HMA AWG Configuration Management Status 1 December 2008
Technical Meeting ESA/ESRIN,
HMA Follow On Activities
WPS updates from ESA Projects
Ordering Services for EO Products SWG ATS / ETS
SQA project process standards IEEE software engineering standards
HMA Follow On Activities
HMA Follow On Task 4 - Order Final Presentation June 2011
HMA SPS Mandatory I/F Development
Ordering Services for EO Products SWG ATS / ETS
HMA Follow On Activities
HMA Follow On Activities
Overview of Progress HMA Standardisation Work
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
HMA-FO Task 1 EOP Metadata
HMA Follow On Activities
Contributions to Testing and Reference Data
HMA Follow On Activities
DREAM Project CSA-ESA Bilateral Meeting 16 February, Frascati
Pier Giorgio Marchetti, Philippe Mougnaud European Space Agency
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
Ordering Services for EO Products Abstract Test Suite (ATS)
HMA Follow-on Kickoff Meeting
OGC and activities HMA-T Phase 2 KO Meeting
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
Pier Giorgio Marchetti - European Space Agency
HMA-Testbed Project Call
HMA for Science Task 1 – Project Management
CNR-IMAA Proposal ( and )
Software Development In Agile
Presentation transcript:

HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) HMA-FO Negotiation Meeting 24 June 2009, Frascati Ricardo Moyano, DEIMOS Space Reuben Wright, DEIMOS Space Didier Giacobbo, SPOT Image Philippe Merigot, SPOT Image Corentin Guillo, Astrium

ITT and Proposal information Objectives ITT and Proposal information Team Work Breakdown Structure Deliverables Schedule Technical presentation SPOT IGSI DEIMOS ASTRIUM

Objectives This project aims at : Specification of the OpenGIS® Sensor Planning Service Application Profile for EO Sensors (OGC 07-018) Alignment of the specification with the evolving OGC “SWECommon” and SPS 2.0 Abstract Test Suite and Executable Test Suite Design, development, testing and documentation of an open source Sensor Feasibility Reference Environment Reference server and client to be used both for the testing and demonstration of the specification. All documentation will be generated following the tailored ECSS standards from the Statement Of Work.

Proposal Information: HMA-FO Team

Proposal Infromation: WBS

Proposal Information: List of Deliverables (1/2) Documentation

Proposal Information: List of Deliverables (2/2) Software

Schedule

Reviews and Payment Plan

Technical Presentation: SPOT 1/2 [WP1420] OGC Technical Committee meetings participation - SweCommon Data Model 2.0 WG - SPS 2.0 WG [WP2100] SweCommon specification completion - Finalization of the specification : GML 3.2.1, Schemas, examples… - OGC submission and follow-up [WP2220] Support iGSI to SPS specification completion - Contribute to the SPS specification document [WP2310] SPS EO specification completion - Finalization of the specification : GetSensorWorkload, validation of acquisitions, ATS… - OGC submission and follow-up

Technical Presentation: SPOT 2/2 [WP3430] Support to SFRE coding and UT - Update the SPS EO library - Provide a Notification library [WP4530] Support to SFRE Acceptance [WP5100] Additional demonstration server - SPS Server with Optical Mission Feasibility analysis [WP6200] Warranty - 6 months after the FP

Technical Presentation: iGSI [WP2210] Overall SPS specification completion SPS 2.0 development (current standard: SPS 1.0) Main work items: Harmonization with SweCommon / SweCommon services New interaction models and patterns New state transition model Updated bindings & information models OGC SPS 2.0 Standards Working Group already formed Timing: M1-M4 (SPS uses SweCommon, therefore depends on [WP2100] SweCommon specification completion) Presentation at OGC TC Meeting (Fall/Winter 2009) Submission to OGC Voting Process [WP2320] IGSI support to SPS EO Specification completion - Contribute to the SPS EO profile specification development

Technical Presentation: DEIMOS 1/4 [WP 1000] Project Office project management, product assurance and configuration management [WP 1410] DEIMOS participation in OGC Technical Committee meetings [WP 3100] SFRE Requirement Baseline generation [WP 3210] Overall SFRE Technical Specification Generation [WP 3310] Overall SFRE design 4 different configurations Will include the modelling of Sensor unavailability, Weather conditions, Station unavailability [WP 3410] SFRE server coding and unit testing [WP 3500] SFRE Client/server integration SFRE Client work by Astrium

Technical Presentation: DEIMOS 2/4 SFRE Architecture simulation will include the modelling of Sensor unavailability, Weather conditions, Station unavailability 4 missions (2 optical, 2 radar) - two will use a notification server, and two will not. SPS EO Application profile ATS is envisioned to be incorporated in that specification Conformance Testing environment consists of: the SFRE Server components the TeamEngine (Test, Evaluation And Measurement), an open source compliance test engine extended during the HMA-T project a set of scripts written in CTL (Compliance Test Language) (ie the Executable Test Suite)

Technical Presentation: DEIMOS 3/4 [WP 4100] Abstract Test Suite creation As part of the SPS EO Application profile specification [WP 4200] Executable Test Suite creation a set of scripts written in CTL (Compliance Test Language) Process as established in HMA-T [WP 4300] Conformance Testing of the SFRE the SFRE Server components the TeamEngine (Test, Evaluation And Measurement), an open source compliance test engine extended during the HMA-T project [WP 4410] Overall SFRE Acceptance aligned to ESA ECSS, the terminology and new approach used within OGC, and the new TEAM engine [WP 4440] Acceptance Test Report generation [WP 6100] DEIMOS warranty simulation will include the modelling of Sensor unavailability, Weather conditions, Station unavailability 4 missions (2 optical, 2 radar) - two will use a notification server, and two will not. SPS EO Application profile ATS is envisioned to be incorporated in that specification Conformance Testing environment consists of: the SFRE Server components the TeamEngine (Test, Evaluation And Measurement), an open source compliance test engine extended during the HMA-T project a set of scripts written in CTL (Compliance Test Language) (ie the Executable Test Suite)

Test Suite development process Technical Presentation: DEIMOS 4/4 Test Suite development process simulation will include the modelling of Sensor unavailability, Weather conditions, Station unavailability 4 missions (2 optical, 2 radar) - two will use a notification server, and two will not. SPS EO Application profile ATS is envisioned to be incorporated in that specification Conformance Testing environment consists of: the SFRE Server components the TeamEngine (Test, Evaluation And Measurement), an open source compliance test engine extended during the HMA-T project a set of scripts written in CTL (Compliance Test Language) (ie the Executable Test Suite)

Technical Presentation: ASTRIUM 1/2 [WP1430] OGC Technical Committee meetings participation - Support DEIMOS and SPOT as necessary [WP3120] SFRE RB Generation - Contribution to the RB documentation [WP3220] SFRE TS Generation - Contribution to the TS documentation [WP3320] SFRE Design - Contribution to the design of the SFRE system focussing on the client components [WP3320] SFRE Client coding and testing - Implementation and validation of the SFRE Client [WP4420] SFRE Acceptance - Contribution to the Acceptance of the SFRE [WP5100] Additional demonstration server - SPS Server environment with Radar Mission Feasibility Analysis [WP6200] Warranty - ‘Locking Points’

Technical Presentation: ASTRIUM 2/2 18