Awake Electrons Gun Introduction. - How works an electrons gun

Slides:



Advertisements
Similar presentations
Sept. 30, 2004 NIKHEF-1 Hans de Vries Status NIKHEF Mechanics Secondary vacuum box Bellows Vacuum system CO 2 cooling: Bart Verlaat.
Advertisements

AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Beam Therapy Equipment
F.E.T.S. Mechanical Engineering Update by P. Savage 13 th August 2008.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
AWAKE electron source New Electron Source WP at CERN
EDMS No Photoinjector General + Photocathodes presented by Konrad Elsener (CERN-AB)
ELENA – Electron Cooler Vacuum design Benjamin Moles March 26 th 2015 on behalf of Electron Cooler team : Gerard Tranquille Jean Cenede Lars Soby Lars.
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
Coherent Diffraction Radiation experiment Konstantin Lekomtsev, Grahame Blair, Gary Boorman, Pavel Karataev, Maximilian Micheler John Adams Institute at.
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
Laboratoire de Chimie-Physique CNRS – Université Paris-Sud UMR ORSAY Cs 2 Te photocathodes at ELYSE.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
TBTS Test Program & Schedule G. Riddone
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
M. FILIPPOVA CERN CLIC BE-RF RF DEVELOPMENT MEETING ON Inventory of RF components.
New Fast Wire Scanner for Booster Mechanical Design review 2016_01_ /01/19 1 On behalf of: - EN/MME: Alain Demougeot, Nicolas Chritin - BE/BI: Dmitry.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
The Development of the Microwave Vacuum Electronics at BVERI
Oscilloscope.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Adjustable tuner HENRY PRZYBILSKI / PIERRE-ALAIN LEROY.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
Teleconf ACS – FREIA 28th March 2017
Phil Oxford , june 18 Photoinjector at.
L. Gentini, A. Bertarelli, F. Carra
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
Wire Scanner / A.Demougeot
1. ELECTRON BEAM WELDING 2. FRICTION WELDING 3. FRICTION STIR WELDING
Wideband kickers Mechanical design and Fabrication
Teleconference ACS – FREIA 18th April 2017
Production and commissioning of the 2nd BGC
The situation is far better than I had thought.
EBTF Design Review Technical Meeting Group
9/10/2018 News on operation Second commissioning phase from 30th of March to 9th of April Aline Curtoni, Claire Simon, Franck Peauger, Wilfrid Farabolini.
Rf structure development meeting TBTS component status and use/test at KEK and SLAC G. Riddone, I. Syratchev
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Beam Finder Wire Assembly Undulator System
IHEP Cryomodule Status
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
Test RF gun cavity Takuya Natsui.
STATUS REPORT OF THE SPARC HIGH POWER RF SYSTEM Nov. 16, 2005 R
V.B.POLYTECCHNIC NAME : Mistry Rihen SEMISTER : 3rd DIV : B
April 19th 2017 Work Unit AIK CDR of the CDS-SL Installation integration.
Two-beam Test-stand Design and Construction Status
BGC Collaboration Meeting –
Presentation transcript:

Awake Electrons Gun Introduction. - How works an electrons gun - Required work - Input data Project - Modifications of vacuum chamber transfer - New frame - Wave Guide - Transport trolley for Transfer Chamber - Scintillator Conclusion

How works an electron gun: RF Gun & Accelerator Waves Guide Klystron Accelerator

How works an electron gun: Laser

How works an electron gun: Electrons Emission Cathodes in spares Transport Carrier Wave guide Cathode RF Gun Laser Soleinoid Mirror

How works an electron gun: Electrons Emission Cathodes in spares Transport Carrier Wave guide Cathode Canon RF Laser Soleinoid Mirror Electrons Beam

How works an electron gun: Cathodes & Transport carrier Manipulator Cathode: Copper Substratum: Cesium + Tellurium

Required work: Install in TCV4 cavern Electrons source and Wave Guide CTF2 Electrons Gun With vertical TC Shielding Awake Cavern TCV4

Required work: Install in TCV4 cavern Electrons source and Wave Guide CTF2 Electrons Gun With TC in vertical position Existing metallic structure

Required work: Install in TCV4 cavern Electrons source and Wave Guide Splitter CTF2 Electrons Gun With TC in horizontal position Wave guide elements

Input data Simplified model CTF2 Electrons Gun Some old drawings Electron Gun in operating in CTF2

Adaptation of the transfer vacuum chamber Chamber from CTF2 Flange for scintillator translator Flange for viewport Cut 4 flanges Cut bellows for UHV cleaning after machining and welding New flange and bellows Flange for Transport Carrier

New Frame Original Frame Assembled frame with positioning equipements Adjustable Base New Frame

New Frame Transport carrier Vacuum Chamber Pump Group Manipulator Electricals equipments Assembled frame with positioning equipements Adjustable Base New Frame

Wave Guide 3Ghz Circulator Phase shifter Klystron Attenuator

Trolley for TC Transport TC in horizontal position, ready for the transfert on new Electron Gun frame Lifting winch for TC transfer Trolley from CTF2 with TC in vertilcal position

Scintillator for laser positioning Scintillator: Ceramic Al203 Cathode Translator Visible beam Ultraviolet Laser (invisible spectrum) Scintillator support Cathode manipulator ViewPort

Conclusion Very interesting project because it was complete and technologicaly diversified. - Vacuum :chamber, TC, Wave guide… - Welded structure: Trolley, Electron gun Frame. - RF: Wave guide. - Laser: Scintillator - Integration of all the equipments in Awake 3D model. - Modelization and CDD archiving of old documents. Good contacts and exchanges with many people for technical advices. - Eric Chevalley and Kevin Pepitone for explanations about the RF gun operation. - Emilien Rigutto and Thibaut Coiffet for the machining and reusing of the transfer chamber. - Nicolas Sebastien Chritin for his advices and for the liberty of work that he leaved to me.