Beekeeping Sample Site Plan Sketch

Slides:



Advertisements
Similar presentations
CBJ Planning Commission Presentation November 9, 2010 Subdivision Ordinance Revision Update.
Advertisements

110 Pine Street Residential Apartments Zoning Bylaw Amendment.
Zoning Amendments 2015 Changes to Dimensional Requirements.
City of Rehoboth Beach Managing Impacts of Current Development Trends on Residential Neighborhoods: Issues and Possible Solutions City of Rehoboth Beach.
Draft Zoning Code City Council Work Session June 21, 2007.
City of Waynesboro Entrance Corridor Design Guidelines.
Proposed CBS Municipal Plan and Development Regulations Amendments for Backlot Development Municipal Plan Amendment No. 9, 2015 Development Regulations.
Planning & Community Development Department Villa Esperanza Services Master Plan September 29, 2014 City Council.
City of Rehoboth Beach Managing Impacts of Current Development Trends on Residential Neighborhoods: Issues and Possible Solutions City of Rehoboth Beach.
St. Albans Guide to the Rewrite Process ZONING & SUBDIVISION REGULATIONS.
1837 Pine Street Project Overview Pine Street - Site Plan 2.
Fences in Front Yards and Along Saltwater Canals City Council Workshop March 31, 2015.
Chapter 14 Legal Descriptions and Site Plan Requirements.
Draft Zoning Code Planning Commission Work Session June 20, 2007.
Neighborhood Commercial on 5601 North Pine Hills Road Small Scale Land Use Amendment Application for.
Site Plan Requirements © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture.
April 17, 2007 BCC Called Public Hearing on BZA #VA February 1, 2007 Applicant: Towanda Hannah.
Parkside Development Standards Colorado Springs Together Offices Monday, September 24, 2012 Tuesday, September 25, 2012.
Phillips Ave. Fire Station. The Fire Station: Phillips Ave. Fire Station RFP to be issued  Retain Historic Building  Allow Residential Use – Single.
Shady Acres Dallas Township Zoning. The Concept The following project will be displayed as a proposed development in the Dallas Township. It will be composed.
Integrating Uses.
416 & 422 Grand Blvd LLC 416 & 422 Grand Blvd. Venice CDP A-5-VEN CDP A-5-VEN August 12, 2015 W 21d & e.
Proposed LDC Amendments to Setbacks for Swimming Pools and Standards for Accessory Uses City Council Workshop November 10, 2015.
Design Standards in Saint Paul Proposed Design Standards Zoning Amendments October 16, 2009 Department of Safety & Inspections / Department of Planning.
Historic Review Board Continued Public Hearing: DR – th St. October 20, 2015.
Nantucket Planning Office 2010 ATM Warrant Article Review January 21, 2010.
Places of Assembly December 5, 2006 Open Discussion.
SITE/PLOT PLANS APPLICATIONS OF TECHNOLOGY. DESIGNING A BUILDING ON A SITE Architects must consider the following about a site when designing a building.
Historic Review Board Public Hearing: DR – th St. September 15, 2015.
Allen Variance Application No. VR-SBK Application Request  Variance for an oversized detached garage in the Single-Family Residential (SFR-3)
Community Development Department Variance to 20 ft. Street Side Setback 1 Windsor Place APP. NO Variance to 20 ft. Street Side Setback 1 Windsor.
Community Meeting May 22, 2013 City of Richmond Department of Planning & Development Review.
Public Hearing Seattle Ridge Preliminary Plat/ Planned Area Development PP December 18, 2013.
Project Profile: Four-Star NGBS Certified Development Developed by Craftsmen Developers Infill site selected acre site 42 waterfront townhome lots.
Overview of Residential Reconstruction in Needham Lee Newman Town of Needham Director of Planning and Community Development.
To provide for alcohol-free commercial uses that serve as a transition between commercial districts and one- and two-family residential areas. PURPOSE.
Residential Infill Project Scale of Houses (a primer) Stakeholder Advisory Committee October 6, 2015.
DOMESTIC USE OF CHICKENS Proposed options to amend Chapter 7 of the Municipal Code June 8, 2009 Work Session.
How Closely We Live With Each Other
Public Hearing Amendments to Chapter 38 Horizon West Development Standards Orange County BCC May 24, 2016.
July 4, 2017 AURORA UNITED CHURCH + SOUTHBOUND DEVELOPMENT LTD Yonge Street, 55&57/57A Temperance Street, 12&16 Tyler Street General Committee Meeting.
City of East Palo Alto Planning Commission
ACCESSORY DWELLING UNITS: CLEARING UP THE CONFUSION
GRAPHIC ANALYSIS of EXISTING DOWNTOWN DENSITY
Montecito Board of Architectural Review August 10, 2017
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
rezoning Petition # The Drakeford company
Washoe County Board of Adjustment
Planned Unit Development (PUD)
Marina Del Palma Comprehensive Plan & Zoning Map Amendment
Variance Case VA vary the side yard setback from 8 feet to 5 feet for a first floor addition on the main house expand the second floor to be in-line.
Title 19: Subdivision Code
Enjoy Island Time… 212 E Arctic Avenue ~ Great beach access! ~
RESIDENTIAL DESIGN PROJECT
Arbors at Bittersweet Woods.
Site Analysis ID 240 Spring
City of Santa Cruz Accessory Dwelling Unit Development Program
Changes to Pace Master Campus Plan 1. Pod A Tear down Randall House, build new Lower School building in its place. Add new parking in front. 2.
Zoning We are about to build The Woodlands Community to the City of Mississauga development standards. ARCH – Architectural Studio 2.
VR-SBK Rear Yard Setback 2 Felshire Lane Medeiros Property
3 Solving Application Problems.
Site Plan Requirements
Proposed Zoning By-law Amendment & Future Consent Application
Clarke Street Rezoning Bylaw 3161
1-7 Perimeter, Circumference, and Area
City Commission Workshop
115-Unit Mixed-Use Project (711 E
12 D. Variance Request – 211 Jennifer Lane
Amendment to Vancouver Municipal Code Title 20 pertaining to RV and Boat parking and design standards parking in residential areas March 22, 2016 Vancouver.
WEST HALF OF LOT B CONCESSION 1 MARY C. JOYCE-SMITH, MCIP RPP
Presentation transcript:

Beekeeping Sample Site Plan Sketch The sketch must include: Location of house and surrounding structures Location of all equipment/hives for beekeeping Water source Flyaway barrier Your lot lines Setbacks 5 ft. (from rear yard property line) LOTLINE 10 ft. (from side yard property line) 25 ft. (from a principal residential dwelling on an abutting lot) clean/fresh water source Principal Residential Dwelling LOTLINE LOTLINE Deck (6ft. In height) flyway barrier: blocking view from street or sidewalk AND adjacent properties closer than 25 ft. House 15 ft. (from a public sidewalk) DRIVEWAY SIDEWALK SIDEWALK STREET

Beekeeping Sample Site Plan Sketch The sketch must include: Location of house and surrounding structures Location of all equipment/hives for beekeeping Water source Flyway barrier Your lot lines Setbacks