Review of the Machine Protection System in the PS complex

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

Radiation Protection aspects of the Switch-Yard operation V. Donate, G. Dumont, Joachim Vollaire on behalf of DGS-RP.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
L4T Bending Power Converters: ‘ Implications of monitoring the current to 5% and 0.5%’ L4 BCC - 10 Nov 2011 David Nisbet TEEPC.
Signals between LHC Machine & ALICE: an Update David Evans ALICE TB 23 rd February 2006 (with input from Detlef Swoboda)
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
LLRF FOR CHOPPER Grégoire Hagmann Philippe Baudrenghien BE/RF/FB February 24th, 2013.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Stéphane Gabourin on behalf of TE/MPE-EP MPP Linac4 – 9 th July 2015 BIS installation in Linac4 For 50 MeV operation.
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
PSB ring inhibit in the Linac 4 era A. Blas PSB LIU meeting 07/03/ Summary of discussions involving (mainly): Jose-Luis Sanchez Alvarez Philippe.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Controls Issues Through the Backbone R. Steerenberg with help of many colleagues ATC – ABOC Days 23 January 2007 ATC – ABOC Days 23 January 2007.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/ BIS: Beam Interlock.
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
Status of the machines over X-mas standby period, services required and plans for rapid start-up OP Group Meeting KH.
Chapter 8. Electrical Systems
Outcome of BI.DIS Fast Interlocks Peer Review
Wednesday 3rd October - morning
Online check lists Half Sector Test
Evolution and future of the Access safety and control systems
SLS Timing Master Timo Korhonen, PSI.
ISOLDE Interlocks MSWG 13 August 2013 K. Hanke, E. Piselli KH.
LINAC4 50 MeV phase BIS STATUS
EC Activities Status for the LIU
Radiation protection of Linac4 M. Silari Radiation Protection Group
Status of the BI Work Package in the LIU-PSB frame
M.Jonker CTC MPO-WG status
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
RF operation of REX-ISOLDE
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
EN-CV interventions during EYETS for PS and PSB
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Linac 4 Devices Controls and Monitoring Status
Monday 11/07: Recovery Plenty of accesses.
Saturday 12:00 Fill 1992 in stable beams.
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Machine Protection Xu Hongliang.
Interlocking of CNGS (and other high intensity beams) at the SPS
UITF MPS system requirements
M. Zerlauth, I. Romera 0v1.
Thursday 10th May - morning
1v1.
Beam Interlocks for Detectors and Movable Devices
07/08/2010 Fill #1264 dump at 02:14:38.
The LHC Beam Interlock System
UITF Conduct of Operations Review
Operation of Target Safety System (TSS)
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Thursday
Configuration of BLETC Module System Parameters Validation
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Radiation Detectors for the PSS1 at ESS
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
SPS Injection BIS - Draft requirements
Presentation transcript:

Review of the Machine Protection System in the PS complex K.Hanke BE/OP thanks to F.Chapuis, M.Eriksson, T.Eriksson, E.Piselli, R.Scrivens, R.Steerenberg

Linac2: General Interlocks work basically well, sometimes it is difficult to tell that the external condition interlock has been activated on a beam (can this be improved, e.g. on the Vistar?). The Linac watchdog is only compatible with the FESA BCTs by using the FESA2GM backwards compatible class. CO is in the process of rewriting the watchdog to be fully compatible with modern standards, also in view of Linac4. First tests are planned for 2009. In 2009, and for the foreseeable future, there will be a radiation monitor in the access safety chain for Linac 2, to protect the Linac4 work site.  

Protection of Linac4 Construction Site Existing walls No shielding, to allow access to electrical cabinet. New shielding (concrete) height Linac4 1.6m 2.0 m 40cm ~2.2 m average 100cm D22 140cm Rad Monitor Water distribution To Source LT.BHZ20 To PS R.Scrivens

Protection of Linac4 Construction Site The civil engineering work for Linac4 requires some protection measures to protect the workers (public) from radiation during Linac2 operation. improved shielding installation of a Radiation Monitor (PAXS_22) in Linac2 klystron gallery between Linac2 line and Linac4 construction site PAXS_22 triggers the Linac2 safety chain (cutting the beam in case of losses toward Linac4 construction site – linac source timing and stopper). Operations procedure in case of beam cut by PAXS_22 in the process of being written

Booster 2008: Wrong Destination On 23/04/2008, a timing problem caused a trip of about 28 DSCs and resulted in a mis-pulsing of BT.BHZ10 (switching magnet between PS/ISOLDE); the magnet stayed with its last setting. Even though the beams with destination PS were cut, ISOLDE beam with destination DUMP was sent into the PS and lost at injection of the PS. This case is presently not interlocked, beam was stopped by the BLM (after a couple of shots).

Booster 2008: Beam to ISOLDE while Request OFF Following re‐start of the PSB after an emergency stop on Monday, 28 July 2008, beam was sent to ISOLDE while the proton request was OFF. It was found by the piquet CO that the VME crate for the external conditions was OFF. After switching it back on, the proton request worked again as it should. The VME crate for the external conditions houses the front‐end CFV‐354‐CTMECM. All external conditions enter in this crate as cables (hardware). The information on the conditions, including request ON/OFF, is sent every 1.2s via reflective memory to the MTG in the CCR (CFV‐CCM‐CTMMAINA/B). The status of the conditions is read from a work station in the CCC via a front‐end called CFV‐CCR‐CTMEMM, which accesses the MTG. CFV‐354‐CTMECM external conditions sends every 1.2s interlocks, requests & inhibits MTG control system

Booster 2008: Beam to ISOLDE while Request OFF The system is designed such that beam is inhibited if either the request is set OFF or the front‐end CFV‐354‐CTMECM is not powered, which was the case on Monday 28 July. This second condition was not taken into account correctly, and beam was sent to ISOLDE although the crate was not powered. A software bug in the system was identified and fixed by CO, the system was tested and confirmed to work correctly.

Booster 2009: New Lift Interlock High radiation level on PAXS_36 during PSB beam operation SC/RP recommendation: forbid access under floor -2 during beam operation - respect of the SC/RP recommendation - maintain the Booster availability - keep the Booster lift functional for safety and building needs solution proposed: interlock triggers the Booster safety chain if somebody goes down under the -2 floor using either the stairs or the lift. status: - stairs signal: OK lift signal: a study with EN-HM is ongoing. The idea is to modify the lift automation and to integrate the new constraints. In case the final solution cannot be implemented for the Booster start-up, a temporary solution will be applied (block the lift). PAXS_36

ISOLDE: 2008 Incidents A number of occasions where the ventilation system had problems with a broken belt (ABOC and ISOLDE tech meeting 28/10/08). The air flow went below a certain threshold which then triggered an (radiation!) alarm in the CCC, and the operators stopped the beam. However the measurement of the air flow is not interlocked and not considered part of the safety chain. It was suggested at the time by RP that the system itself should have an interlock. 23/05/08: BTY.DVT324 in fault and causes beam on target instead of converter. This was not Interlocked (but will be). 06/10/08: BTY.QDE151 power supply tripped, causing beam loss in the BTY; beam was stopped by the BLMs; not interlocked, and not included in the new interlocks

target destroyed by wrong beam ISOLDE: Wrong Beam In previous years (before 2008) on several occasions ISOLDE received beam with wrong focusing, steering or intensity. This happened e.g. when the focusing of the last quadrupoles in the BTY changed spontaneously due to re-loading archives, which could change the settings of these magnets as they are non ppm. In the course of 2007, these non-ppm quadrupoles were separated from the normal working sets. In order to change them, you need to explicitly ask for it; no such cases reported in 2008. However, the need for a real interlock became apparent target destroyed by wrong beam target converter

ISOLDE 2009: New Interlock focus/steering interlock: parameter window set by ISOLDE machine supervisor AQN must be within this range Intensity interlock: AQN ≤ set maximum value E.Piselli “supervisor GUI”

ISOLDE 2009: New Vistar HRS and GPS Vistars permanently displayed in ICR and CCC E.Piselli

PS Machine protection system worked well and did not pose any problem in 2008 In the framework of INCA the external conditions and their actions are being reviewed. The main aim is to get more transparency on the action of external conditions and more flexibility up to a certain level to make specific definitions. This work has just started, not much can be concluded yet.  

AD No problems or issues with AD protection. When FTA.BHZ6024 broke down during the 2008 start-up (in the target area), the ground fault detection worked as expected. No modifications for 2009.  

Conclusions In most cases the interlock and machine protection for the PS complex worked well Some improvements of the existing interlocks can be imagined, notably the ISOLDE ventilation. Main worries were centered around the Booster-ISOLDE interface With the new Vistar/Interlock system, to be deployed for the 2009 start-up, the situation should be as safe as it can be A number of new interlocks (Linac4 work site protection, Booster lift) will be put in place in 2009; need operational procedures.