MVD Mechanics update EXTERNAL FRAME: NEW DESIGN

Slides:



Advertisements
Similar presentations
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Advertisements

Analysis of Simple Cases in Heat Transfer P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Gaining Experience !!!
One-Dimensional Steady-State Conduction
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
THE VACUUM BOX FOR COMPASS CRYOSTAT MUNICH 23/10/2007 G. GIRAUDO I.N.F.N. TORINO 1.MECHANICS – OVERWIEV 2.WINDOWS 3.INTEGRATION WITH HODOSCOPE.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
Proposed Conventional Sextupole for Installation at A0 Introduction (Dean Still) Reasons for installation- Reduce I in S6 feeddown sextupole circuit at.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
ATLAS Inner Detector thermal study. The Inner Detector.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
1 2S Module meeting, 24 September 2012 S tudies on module support inserts Refers to work by Riikka Häsä, Helsinki Institute of Physics, summer student.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
XXXIX PANDA COLLABORATION MEETING GSI-DECEMBER 2011 B. GIRAUDO / D. ORECCHINI CENTRAL SUPPORT FRAME STRUCTURAL ANALYSIS FIRST APPROACH AND PRELIMINARY.
HL-LHC-UK Thermal Shield Update Niklas Templeton 07/03/2016.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
G. GiraudoGSI-Darmstadt MVD updates Thermal properties improvement Thermal properties improvement Cooling circuit test (Torino) Cooling circuit.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Progress and prospects in thermo-mechanical activities at Valencia Carlos Lacasta, Arantza Oyanguren 7th International Workshop on DEPFET Detectors and.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
Updates on Vertex Detector NA61/SHINE Collaboration meeting, Wrocław Oct. 8, 2013.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
BGV 23-feb-2016CERNMassimiliano Ferro-Luzzi 1 BGV cooling : status and plans reporting on behalf of EN-CV (Sylvain Nichilo & Olivier Crespo-Lopez)
Stave thermal analysis Cooling connections CO2 warm Test
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
For the CMS Pixel detector
P. Sutcliffe Liverpool University
Feedback on transfer line sizing and flow calculations for UT
SVT Mechanics & Beam Pipe
A PRELIMINARY THERMAL STUDY FOR L3 CGEM BOARD
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Status of GASPARD mechanics
Ti/SS transitions A.Basti INFN-PISA*
Update of MVD services and requests
FEE COOLING UPDATE CGEM Workshop - IHEP - June 13th 2017
Local Supports for Inclined Layout: CERN Update
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
For the CMS Pixel detector
Micro Vertex Detector of PANDA Strip Detector
UPDATES on INSIDE MECHANICS
Pixel cooling specifications
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
SiD Solenoid Status and Plans
Integration – preliminary ideas on routing and tests
Integration issues at IHEP
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
Thermal Shield Connection Study
update on UT cooling system
Hybrid Mechanical/Thermal Design ideas
SIT AND FTD DESIGN FOR ILD
Work packages status in Torino and perspectives
Stainless Steel Water Well Casing.
Recirculating CO2 System
Pixel Detector System (Barrel & Forward)
For the CMS Pixel detector
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Table 3. Main properties of the thin brass electrode
Presentation transcript:

MVD Mechanics update EXTERNAL FRAME: NEW DESIGN CENTRAL DETECTORS INTEGRATION COOLING OF THE SERVICES (GBT & DC-DC CONV.) G. Giraudo FRASCATI 9 SEPTEMBER 2014

EXTERNAL FRAME: NEW DESIGN New disks configuration Frame longer Windowing optimization G. Giraudo FRASCATI 9 SEPTEMBER 2014

EXTERNAL FRAME: NEW DESIGN Disks connection to the frame  screws Disks position  internal bosses (machined) G. Giraudo FRASCATI 9 SEPTEMBER 2014

EXTERNAL FRAME: NEW DESIGN G. Giraudo FRASCATI 9 SEPTEMBER 2014

CENTRAL DETECTORS INTEGRATION COOLING MANIFOLDS DC-DC CONVERTERS 162 PRESSURE SENSORS GBTs ROUTING OF THE SERVICES: STILL OPEN ISSUE G. Giraudo FRASCATI 9 SEPTEMBER 2014

CENTRAL DETECTORS INTEGRATION MVD’s SERVICES NEEDS WELDED BOSSES LENGTH +200 mm G. Giraudo FRASCATI 9 SEPTEMBER 2014

COOLING OF THE SERVICES (GBT & DC-DC CONV.) 88 DCDC boards/twin bar 24 twin bars  2112 DCDC boards Aluminium alloy  bar Stainless steel (AISI 316)  tube 16 GBT boards/bar 12 (6+6) bars  192 GBT boards Aluminium alloy  bar Stainless steel (AISI 316)  tube G. Giraudo FRASCATI 9 SEPTEMBER 2014

DC-DC Converter Boards COOLING OF THE SERVICES (GBT & DC-DC CONV.) Ideal contact between tube and bar glue layers ignored DC-DC Converter Boards Bars Al-alloy 175 W/m∙K Tube SS (AISI 316) 6x5 (mm) Thermal contact area 1 cm2 Power flow 3 W/cm2 Tot. power 132 W Water temp. 18 oC Water flow rate 0.9 l/min G. Giraudo FRASCATI 9 SEPTEMBER 2014

COOLING OF THE SERVICES (GBT & DC-DC CONV.) Ideal contact between tube and bar glue layers ignored GBT Boards Bars Al-alloy 175 W/m∙K Tube SS (AISI 316) 6x5 (mm) Thermal contact area 2 cm2 Power flow 1 W/cm2 Tot. power 64 W Water temp. 18 oC Water flow rate 0.9 l/min G. Giraudo FRASCATI 9 SEPTEMBER 2014

What’s next? Services routing optimization Beam & Cross Pipe modification Construction of one DCDC converter bar (Thermal study) Detailed study of carbon paper thermal properties Tests of thermal film glue Results of the last two point will be reported at the next C.M. G. Giraudo FRASCATI 9 SEPTEMBER 2014