City of Greeley Prepared for the Water Quality Control Commission

Slides:



Advertisements
Similar presentations
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
Advertisements

Antideg and Municipal Stormwater Discussion Sept. 23, 2009.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee August 24, 2010 Metro Permit Reissuance Proposed.
Overview of CWA Section 316(a) Evaluations of Power Plants with Thermal Discharges in Maryland Presented at EPRI Workshop on 316(a) Issues: Technical and.
BEFORE AFTER. New Effluent Limitation Guidelines On November 28th, 2008, the EPA issued a proposed regulation which strengthened the existing National.
Lunenburg CWMP Phase II – Management Techniques and Alternatives Identification and Screening Lunenburg Comprehensive Wastewater Management Plan Workshop.
The WQCD Permitting Perspective Janet Kieler Permits Section Manager.
The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
Water Quality Trading Claire Schary Water Quality Trading Coordinator U.S. Environmental Protection Agency, Region 10, Seattle, WA Region 10, Seattle,
Draft Phase II Small MS4 General Permit Water Quality Monitoring & Assessment Jonathan Bishop Chief Deputy Director Director State Water Resources Control.
The Nevada Department of Agriculture Water Quality Program The Nevada Department of Agriculture has been involved in groundwater protection since 1990.
Upper Blackfoot Mining Complex
Implementation of Antidegradation Policies for Indiana Waters.
Use Attainability Analysis City of Conrad Ann Harrie and Bob Bukantis WQS Section, MT DEQ June 28, 2007.
Item No. 13 Recommendation to the State Water Resources Control Board Regarding the Section 303(d) List Lahontan Water Board June 19, 2014 Carly Nilson.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
Youghiogheny River Lake Storage ReAllocation for Downstream Water Supply by Werner C. Loehlein, P.E.
Water Supply Planning Initiative State Water Commission November 22, 2004.
At a watewater Treatment plant near you Clean Water Act  Goal –Fishable –Swimmable  Classifications –Aquatic life –Recreation –Water Supply –Agriculture.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
Teresa Marks Director 1. o The Clean Water Act of 1972 requires states to establish water quality standards (WQS) for all waterbodies within the state.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
Aquatic Life Selenium Standards Cottonwood Creek Drainage Cherry Creek Segment 4b Regulation 38 June 9, 2015.
Town of Milliken Regulation No. 38 Rulemaking Hearing June 8-10.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Sammamish River Diel Dissolved Oxygen and pH Study September 21, 2005.
1 INTEGRATED WATER RESOURCES MANAGEMENT STRATEGY IN GHANA Water Resources Commission.
Water Quality Control Commission June 8/9, In 2009, the Commission adopted a temporary modification for Segment 15 based on Water Effects Ratio.
MIG 2 - Water Quality and Quantity Study Plan Review April 2, 2008.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
Council Workshop, June 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0 MGD.,
Notebook Ref Summary of the Issue Part of a Tier II antidegradation review should incorporate the consideration of feasible alternatives, some of.
Met by Conference Call Aug 29 Six states participated. Have asked EPA to assign a representative. Agenda for the call: Reviewed status of proposed 2013.
Briefing Current status of data collection and proposal on existing system of river classification systems and associated water quality standards Department.
1 Responding to Comments Janet Cox TMDL/Planning Communications Region 2.
Antidegradation and Alternatives Analysis Mary E. Gardner Regulatory Programs Administrator Littleton/Englewood WWTP Colorado.
WQCD Response: Selenium/Misc. 1. Reverse Osmosis Treatment Colorado currently has 42 RO treatment plants. Attractive for communities with lower source.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
A quantification of groundwater seepage during drought and its importance for water quality modeling in the St. Vrain watershed Hannah Chapin Thomas Gerber.
STREAM MONITORING CASE STUDY. Agenda  Monitoring Requirements  TMDL Requirements  OCEA Initial Monitoring Program  Selection of Parameters  Data.
Date Planning for Compliance with the Final 316(b) Phase II Regulations For APPA – March 8, 2004 David E. Bailey EPRIsolutions.
Report of the NPDES Subcommittee October, August 19 Conference Call Mercury Discharges from Power Plants Proposed Ammonia Criterion Temperature.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
TMDL for Diazinon in Chollas Creek Watershed TMDL for Diazinon in Chollas Creek Watershed Linda Pardy (858) Jimmy.
Cottonwood’s Proposed Site-Specific Selenium Standards in the Cherry Creek Basin Comments Presented by: Cherry Creek Basin Water Quality Authority Regulation.
Connie Brower NC DENR Division of Water Resources.
WQBELs Karen Holligan September 23, WQBELs – A Four-Piece Puzzle Numerical criteria (toxic pollutants) Water body quality Effluent fraction Bioavailable.
Tom Reeder Division of Water Resources.  SGWASA = South Granville Water & Sewer Auth.  Provides water & sewer service to south Granville County, Stem,
3 Old Dominion University Lake Gaston Project Field Trip November 1, 2014 Thomas M. Leahy, P.E. Director of Public Utilities.
AEMCPresentation to GWCFPAGE 1 AEMC and Rule changes Presentation to AEMO Gas Wholesale Consultative Forum Kamlesh Khelawan Director This presentation.
TEMPORARY MODFICATIONS FOR SULFATE AND SELENIUM IN LOWER ARKANSAS RIVER SEGMENT 1A SHOULD BE ALLOWED TO EXPIRE.
Regulatory Roadmap: Power sector environmental rules
City of Black Hawk & Black Hawk / Central City Sanitation District
Strategy Formulation Process Workshop B
Amendment to the Cooperative Agreement with Elsinore Valley Municipal Water District for Upper Temescal Valley Salt and Nutrient Management Plan Jayne.
Water Quality Control Commission Hearing June 8, 2015
Water Quality Credit Trading
Unresolved Reg 2 Issues and Triennial Review Preview Raymond E
Report of Proceedings Surface Water Quality Standards Triennial Review Environmental Management Commission November 13, 2014 Steve Tedder – EMC Hearing.
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Preparing a River Basin Management Plan What are the open questions?
WESt Sammamish park project
Westcas position paper
AICE QUESTION.
` Permitting Workshop Water Quality Control Division cdphe.state.co.us/wq Pueblo, Colorado May 18, 2005.
The implementation of the NUTS 2010
AOITI WG3 Privacy-in-IoT Taskforce
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

City of Greeley Prepared for the Water Quality Control Commission IN THE MATTER OF THE ADOPTION OF REVISIONS TO THE CACHE LA POUDRE SEGMENT 12 IN THE CLASSIFICATIONS AND NUMERIC STANDARDS FOR THE SOUTH PLATTE RIVER BASIN, LARAMIE RIVER BASIN, REPUBLICAN RIVER BASIN, SMOKY HILL RIVER BASIN, REGULATION #38 (5ccr 1002-38) Prepared for the Water Quality Control Commission June 2015

Summary of Temperature Issues Greeley proposes a temporary modification to the temperature standards on Segment 12 of the Cache la Poudre River with the following terms: Daily maximum temperature (DM) = current condition Weekly average temperature (WAT) = current condition Compliance issues Demonstrated/predicted compliance issue, as evidenced by five years of effluent, upstream and downstream temperature data Significant uncertainty regarding the extent to which existing quality is the result of natural or irreversible human-induced conditions, as demonstrated by upstream summer temperatures City of Greeley

Temperature Data Collection and Assessment City of Greeley

Compliance Issue City of Greeley

Plan to Resolve Uncertainty Temperature Data Collection and Assessment Collect additional temperature data for Segment 12 at additional locations upstream of discharge point Investigate cause of upstream temperature exceedances to determine if an ambient based site-specific standard is appropriate Aquatic Life Data Acquire fish and macroinvertebrate data in Segment 12 to determine if recalculation is appropriate Evaluate for evidence of a balanced, indigenous aquatic life population Feasibility Studies Evaluate the technological, economic, and environmental feasibility of alternate temperature management strategies. Regulatory Involvement Continue to participate in the Basic Standards Workgroup and the Permit Issues Forum’s discussions of temperature standards City of Greeley

Summary A temperature temporary modification is appropriate based on demonstrated/predicted temperature issues An expiration date of 12/31/2020 is appropriate to allow time to resolve uncertainty in Segment 12, both upstream (Fort Collins) and downstream (Greeley). Due to winter issues upstream and summer issues downstream, a year-round temporary modification of current condition for temperature in Segment 12 is appropriate. City of Greeley