Validation of Forest-based Carbon Projects

Slides:



Advertisements
Similar presentations
T HE W ORLD B ANK C ARBON F INANCE U NIT I MPROVING SMALL SCALE TRANSPORTATION METHODOLOGIES : L ESSONS FROM E GYPTIAN VEHICLE SCRAPPING P O A. P RESENTATION.
Advertisements

BASELINE STANDARD UNFCCC secretariat workshop
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
Proposals for Verification of A/R Projects Alvaro Vallejo Rama Chandra Reddy Roundtable on Validation and Verification Issues in LULUCF projects Carbon.
Verification of Forest-based Carbon Projects Sebastian Hetsch Carbon Management Service TÜV SÜD Industrie Service GmbH Roundtable on Validation and Verification.
1 MEANS TO REACH REDUCTION TARGETS AND IDENTIFICATION OF WAYS TO ENHANCE THEIR EFFECTIVENESS AND CONTRIBUTE TO SD THE FUTURE CDM Presented at the In-Session.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Current CDM experiences HeidelbergCement
Carbon credits - origination to commercialisation© 2007 EcoSecurities Group plc Market and Methodologies Meet Ocean Fertilization Till Neeff – EcoSecurities.
Katoomba Group Training Initiative Climate Change, Markets and Services Welcome and Introduction Course Introduction and Guidelines Participant Introduction:
Geoinformatics based LULUCF inputs for CDM Project of ITC - PSPD, Bhadrachalam CDM Barrier removal – Meet III Forestry and Ecology Division National Remote.
María Paz Cigarán National Environmental Council (CONAM) June 12, 2003 NATIONAL STRATEGY STUDY Clean Development Mechanism - NSS PERU.
Energy efficiency measures in the public building sector: the DEEP project Freiburg, 14 June 2007 Philipp Tepper Sustainable Procurement ICLEI - Local.
Validation & Verification Report Templates – RIT Perspective Vinay Deodhar, RIT, AP Member Module March 2012 First SDM JCW, Bonn, Germany.
An introduction to the monitoring of forestry carbon sequestration projects Developing Forestry and Bioenergy Projects within CDM Ecuador March, 2004 Igino.
Baseline Methodology ARNMB0010 Xiaoquan Zhang and Bernhard Schlamadinger.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 9.1 „Application of Sampling in.
Page 1 Scope 2 Emissions Accounting & Reporting 15 th May 2014
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
Expert Group Meeting ‘Using Energy Management Standards to stimulate persistent application of Energy Efficiency in Industry’ Alexandre V. MELLO Environmental.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
Harnessing the carbon market to sustain ecosystems and alleviate poverty Project Cycle and Project Design Document Project Cycle and Project Design Document.
Perspectives on Validation in LULUCF projects. Established on July, 1, 2004 JACO CDM Japanese Major Companies of Which business fields are finance, construction,
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
Harnessing the carbon market to sustain ecosystems and alleviate poverty Monitoring of AR Projects Monitoring of AR Projects BioCarbon Fund Training Seminar,
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
Roundtable on Validation and Verification Issues in LULUCF Projects The World Bank, Washington DC August 24-25, 2009 Issues in Validation of A/R Projects.
AIT Case Study 2: Afforestation & Reforestation Project Sudhir Sharma, AIT.
1 UNFCCC Workshop on Reducing Emissions from Deforestation in Developing Countries 30/08-01/9/2006, Rome, Italy Overview of scientific, socio- economic,
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Verification from PPs perspective Round table on A/R CDM projects Carbon Finance Unit – World Bank August 24&25, 2009 Walter Oyhantçabal A/R WG.
Challenges of CDM Implementation in Indonesia Architrandi Priambodo.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 8.1 „Additionality in the context.
14 November 2006 UNFCCC Side Event, COP/MOP, Nairobi Development and Implementation of a JI Track 2 project Manfred Stockmayer Director Camco International.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Conclusions Buenos Aires, – December 5 th, 2004 CDM Methodologies and Project Design Workshop for CDM Project Developers.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Validation and Verification of CDM projects SGS Climate Change Programme Shivananda Shetty Business Manager – SGS India Syed Khursheed Zaidi Operation.
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
How much technology transfer takes place in the CDM? TETRIS conference, Brussels, November 30th, 2006 Heleen de Coninck.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Monitoring and MRV context of the Country National Forest Inventory (NFI): the previous NFI has not covered some forest type (the sampling strategy did.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
Uncertainties in methodology interpretations for project developers based on an example Roundtable on Validation and Verification Washington,
Template Contents of the Low Carbon Development Strategy (LCDS)
Standardized baselines
L. Radulov, A. Nikolaev Black Sea Regional Energy Centre
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Role of Parties involved in JI-projects: Sweden
The revised Periodic Reporting Questionnaires: general features Alessandra Borchi Policy and Statutory Meetings Section UNESCO World Heritage Centre.
Kenya’s REDD+ Readiness Activities
Determination / Verification under JI - Challenges and Pitfalls
Baseline setting and monitoring under JI compared to the CDM approach
Q&A sessions at UNFCCC SB26
DEVELOPMENT OF MRV-SYSTEM & REL/RL IN TANZANIA
Small Scale Projects – Learning from the CDM Paul Soffe
Basics of Energy Management
Small-Scale Projects Under JI
Costs and Benefits associated with the implementation of the Water Framework Directive, with a special focus on agriculture Summary & recommendations.
Development of determination and verification manual (DVM)
Presentation transcript:

Validation of Forest-based Carbon Projects Sebastian Hetsch Carbon Management Service TÜV SÜD Industrie Service GmbH Roundtable on Validation and Verification of LULUCF Projects 24 August 2009

TÜV SÜD Carbon Management Service Department in the TÜV SÜD Industry Service 50 Professionals HQ (Munich) Worldwide >100 Auditors Active in CDM Projects (all 15 scopes), Renewable Energy and GHG Inventory

General Impressions Mostly high quality projects with ecologic and social co-benefits Large number of AR methodologies, with little differences. (ACM important step) Limited number of consultants working in the field, expanding slowly. Project participants on the ground with vague knowledge on process and requirements Limited interest of compliance market, due to a) small volumes up to 2012, b) unclear demand (i.e. no EU-ETS) and c) unfamiliarity with AR-CDM

Validation Experience - I Challenges in PDD and Project Development: 30-40 % of all requests are on formal aspects (i.e. participants table, dates, version numbers, etc) Boundary delineation often difficult and time consuming, but important for validation and verification (consider use of GIS) Eligibility assessment often difficult, in particular when nation forest definition differ from national CDM forest definition

Impressions on Eligibility Potential confusion of CDM forest definition with other national forest definitions Partially crown cover not put to relation to minimum forest area but entire plot. Discrete parcels smaller than minimum area Information sources used: Mostly remote sensing, and mostly with well developed expertise Partially not the “right“ dates available for images (e.g. early 90ies). Consistency of image resolution (e.g. Landsat, 30m) and min. area partially item of discussion.

Validation Experience - II Baseline assessment, often stepwise approach not applied, general baseline study ahead of final stratification Additionality: mostly barriers (in particular financial) in future potentially more investment analysis

Validation Experience - III Calculation tools complicated to apply -> use of standardized tools Monitoring in old methodologies too bulky (close to 100 parameter) -> reduction in number of parameters (as ACMs)

Summary and Discussion Still little, but growing experience in PDD development / AR-CDM framework Still many inconsistencies in methodologies through updates and EB decisions not considered Methodological tools help to ease the process Consolidated Methodologies (and SSC) are a major improvement (monitoring & use of tools)

Summary and Discussion Capacity building on key concepts / Guidelines for AR project development including lessons learned: for project developers for traders and buyers

Thank you for your attention Sebastian Hetsch TÜV SÜD - Carbon Management Service sebastian.hetsch@tuev-sued.de www.tuev-sued.de/climatechange