ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.

Slides:



Advertisements
Similar presentations
EIS/Solar-B: EIS information that was sent to System Side EIS subsystems: EIS consists of three EIS subsystems. (a) STR: Structure, (b) HAR: Harness, (c)
Advertisements

Corner Raft Conceptual Design Corner Raft Conceptual Design Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
M2FS: Michigan/Magellan Fiber System. M2FS (Michigan/Magellan Fiber System) Fiber-fed MOS w/2 independent and identical spectrograph arms 256 total fibers.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
SLAC June Gpix Camera Camera DAQ/Control System SLAC Program Review T. Schalk CCS team.
Cryostat Assembly 17 September 2008 Martin Nordby, Rafe Schindler, Gary Guiffre, Rick Van Berg.
Integration and Test 14 October 2008 Martin Nordby.
Camera Electronics Systems September 2008 Rick Van Berg.
Control Software Integration German Schumacher T&S Software Lead.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
MCAO Adaptive Optics Module Mechanical Design Eric James.
I&T and Operating and Support Hazards Martin Nordby Chief Mechanical Engineer LSST Camera Safety Review August 18, 2015 R1.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Telescope Integration and Tests Tuesday Afternoon.
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
COSMO Large Coronagraph Preliminary Design Review
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
1 Board Telescope & Site Tucson, Arizona July 18-20, 2011 LLST Control Software Review Resources Tucson, January
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
LSST SLAC Office of Communications August 8, 2016 Communications Roadmap.
Commissioning Planning
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning Status Update & Overview Charles (Chuck) Claver LSST System Scientist SAC Meeting March 5, 2017.
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
LSST External Communications Suzanne Jacoby, Andrew Gordon Communications Leads at LSST and SLAC August 17,
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Camera Maintenance and Access
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
ComCam Interfaces Travis Lange ComCam TDR May 10, 2017
GLAST Large Area Telescope:
Mike Anerella December 17, 2013
Systems Engineering, Verification, and Commissioning for LSST George Z
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning: FY18 Planning
ComCam Utilities Travis Lange Scott Newbry Camera I&T Mar. 6, 2017
Alistair Walker Version 3 December
LSST Commissioning Kevin Reil LSST Commissioning Camera Rep
ComCam Cryostat Justine Haupt Mar. 6, 2017
Chuck F Claver LSST System Scientist & Commissioning Lead
LDF “Highlights,” May-October 2017 (1)
Camera to Top End Assembly Integration Travis Lange Camera I&T M. E
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Management Breakout: DOE Budget Summary Vincent Riot LSST Camera Interim Project Manager LSST Commissioning Plan Review January 24-26, 2017.
Management Breakout: MREFC Budget Summary Victor L
LSST Control Software Integration Francisco Delgado OCS Software Manager LSST Commissioning Plan Review January 24-26, 2017.
Software & Hardware for Wavefront Estimation Pipeline Development Te-Wei Tsai Software Engineer Joint Technical Meeting March 6, 2017.
Launch and On-orbit Checkout
FourStar 4K x 4K JHK imager
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Vendor Interactions Paul J. Lotz.
Operator Training Requirements
LUSI Controls and Data Systems W.B.S. 1.6
NEH - Status Stefan Moeller.
Question 1: Contingency for “extra” year
ATST Instrument Interface Overview
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15

Message box example for short highlighted messages. Agenda ComCam Team Brief ComCam Description Review division of responsibilities between Camera and T&S Review Schedule Camera Project T&S Project Interfaces Message box example for short highlighted messages.

ComCam Description The LSST Commissioning Camera (ComCam) is a single raft 9-CCD instrument that will be used during the Project’s 6-month Early Integration and Test period

Message box example for short highlighted messages. ComCam Team Camera Kevin Reil LSST Camera Commissioning lead Travis Lange Lead engineer on the Camera I&T team Scott Newbry Mechanical engineer on the Camera I&T team Justine Haupt Mechanical engineer from BNL Tony Johnson Manager of the Camera Control System subsystem Mike Huffer Manager of the Camera DAQ Margaux Lopez T&S James Howard ComCam CAM, Mechanical engineer Gary Poczulp Optical Shop Supervisor Ming Liang Optical Engineer Paul Lotz Software Engineer Te-Wei Tsai Oliver Wiecha Electrical Engineer Message box example for short highlighted messages.

ComCam Responsibilities Telescope & Site Camera Commissioning ComCam Integrating Structure Utility Box Refrigeration Pathfinder Volume Message box example for short highlighted messages. Corrector Optics, Shutter and Filter Changer Cryostat Stage Assy

ComCam Responsibilities Telescope & Site Camera Commissioning ComCam Integrating Structure Front End Assy L1-L2 Assy Filter Changer Shutter Alignment Fiducials Cryostat Raft Tower Cryotel Coolers Ion Pump Turbo Pump Roughing Pump Vacuum Quality Monitor L3 & Cryostat Front End Flange Utility Box Filter Control HCU Raft Power OTM Power Utility Box Thermal Control Ion Pump Pwr Turbo Pump Controller Refrigeration HCU HCU (FT) AC → DC Control Network Switch (Fiber→ Eth) Dynalene Coolant Distribution MCM Shutter Control & HCU Filter Control & Refrigeration Pathfinder Test Dewar Heat Exchanger (x2) Thermal Load (x2) L3 & Cryostat Front End Flange Message box example for short highlighted messages. Filter Control

ComCam Responsibilities - Software Telescope & Site Camera AOS w/ ComCam WFS Guiding Camera Control System CCS-Shutter CCS-Filter Changer CCS-Raft CCS-Telemetry CCS-MCM-OCS Message box example for short highlighted messages.

Message box example for short highlighted messages. ComCam Schedule Coordinate separately maintained schedules between Camera and T&S Key Dates Ship Shutter to SLAC: 6/14/2017 √ Ship Filter Changer and Controller to SLAC: 2/1/2018 Ship L3 cell to SLAC: 7/1/2018 Preship review from SLAC to Tucson: 2/4/2019 (earlier if possible) CCS and DAQ installed in Tucson (?) All software ready: 2/4/2019 (?) Ship Cryostat to Tucson: 2/5/2019 Preship review: ComCam to Chile: 4/29/2019 Ship ComCam to Chile: 5/4/2019 ComCam ready for onsite tests: 7/29/2019 Message box example for short highlighted messages.

Message box example for short highlighted messages. ComCam Schedule Camera Project ComCam Schedule T&S Project ComCam Schedule Message box example for short highlighted messages.

Interfaces

Interface and Collaboration Diagram ICDs between components are listed: LSE-67: ICD between TCS and CCS LSE-68: Camera Data Acquisition Interface LSE-69: ICD between CCS and DM LSE-71: ICD between OCS and CCS LSE-72: ICD between OCS and DM LSE-73: ICD between TCS and OCS LSE-75: ICD between TCS and DM LSE-73 LSE-71 LSE-75 LSE-72 LSE-67 LSE-75 LSE-68 LSE-69

Backup Slides

Questions Reviews: What reviews do we need? Should we have a dedicated annual ComCam All Hands Meeting? Who is in charge of writing the comprehensive test plan in Tucson? Who will be in Tucson to perform the ComCam tests?

Ownership <-> CCIS and cable wrap

Utilities

What interface details are needed for the DOE Comcam PDR?

Integration and Test in Tucson

Integration and Test in Tucson

Mounted to the Integrating Structure

Section View

Mounted to the Integrating Structure

ComCam Shutter -Received from Bonn Shutter June 2017 -Semi-custom moving slit type with 236 mm aperture -Minimum exposure < 1ms -Programmable blade trajectory

Detector Raft & FOV Field of View Single raft

ComCam Optical Design