Escalator Installation

Slides:



Advertisements
Similar presentations
Man- Basket for cranes Design Specifications Safety Work Instructions
Advertisements

General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Loading and Transporting Logs Section K of the logging code.
Subpart R Steel Erection
Skyscraper Construction
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
Split Sole 45 Degree Raker
Cranes Safety M. Zaman Bhatti Manager HSE, National Refinery Limited
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
Wall Form Design Example (Continued)
Structural Collapse Technician Training
Wall plate should measure the insertion point height plus 30” to accommodate a 30” cleat. The 30” cleat receives 20 X 16d nails. Cut the wall plate and.
1 Cranes Module 13. 2Objectives After this module you should be able to – identify the most common crane hazards – take the necessary steps to avoid those.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Senior Design: Validation of Design December 15, 2008.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Chapter 19 Floors.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
CRANE TIP OVER Date: May 12 th, INCIDENT A galloway was being pre-assembled to determine proper fit. It was then to be disassembled and sent underground.
Appendices Subpart R Steel Erection
1926 Subpart R OSHA’s Steel Erection Standard Scope
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Steel Erection These handouts and documents with attachments are not final, complete, or definitive instruments. This information is for guidance purposes.
Fall Protection.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
OK, now my favorite subject: RPCs in a shipping container
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Baseline Change Request BCR Title: EBD New 6 Ton Bridge Crane Installation BCR #: N/A Presenter’s Name: Robert Law CCB Presentation Date:
EBD existing crane details and future bridge crane upgrade Alev Ibrahimov June
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
D-R Compressor Cell RIT Senior Design Team P13458 Systems Design Review.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Mechanics of Materials – MAE 243 (Section 002) Spring 2008 Dr. Konstantinos A. Sierros.
Fundamentals of Structural Detailing
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Sling Load Capacity and Sling Angles
Fall Protection Training. - Falls remain the number one cause of fatalities in the construction industry. FALL PROTECTION FACT!!!
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
Cantilever Racks Specifications Scope: This task requires the vendor to provide hardware materials for two types of double cantilever racks for use in.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Engineering Analysis & Updated Layout Drawings SofaKing 9 March 2005.
Mezzanine Build Plans.
Warm Vessel Leveling Islands (Piers)
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
30’ Wireless Mast – Self Install
Installation Walkthrough Image Guide
Automotive Engines Theory and Servicing
ProtoDUNE – DSS Installation, Alignment and QA
SBN Far Detector Installation & Integration
SX1 manipulation VERSION 1 Version
Protective Crane Design
Tilt N’ Store Design Analysis
MAIN 220 Industrial Rigging
How to Change a Flat Tire
Assembly instructions for M-K all bolt together hoppercone kit.
F&T Inc. OVERHEAD CRANE SAFETY.
Tilt N’ Store Design Analysis
Missoula Electric Coop
Senad Kudumovic Design engineer
Neutron guide Shielding Concept
Automotive Engines Theory and Servicing
Presentation transcript:

Escalator Installation UT Austin – Robert B. Rowling Hall For EMR and DPR Review (Engineering Review Required) By: CR Watson – Tom Deer Able Machinery Movers Houston

Escalator Installation UT Austin – Robert B. Rowling Hall For EMR and DPR Review (Engineering Review Required) By: CR Watson – Tom Deer Able Machinery Movers Houston

First Step – Six rails at 8ft each need to be built and installed with an expanding bolt system. (See slide for bolt specs) A 5/16 plate is welded to one end and the other is drilled to accept 4” angle iron stops bolted with 3/8” bolts. The stops are installed after the trolley is placed onto the rail. These rails might not be accessible after the escalators are installed.

Escalator Installation Safety First Escalator Installation The equipment depicted in these scenes is not necessarily the hardware that will be used. The images are to indicate a function or intention of the rigging task. The Rigging Supervisor, On-Site Safety Coordinator, and the availability of specific equipment will determine what is actually used in the final job. Safety Last

First Step – Six rails at 8ft each need to be built and installed with an expanding bolt system. (See slide for bolt specs) A 5/16 plate is welded to one end and the other is drilled to accept 4” angle iron stops bolted with 3/8” bolts. The stops are installed after the trolley is placed onto the rail. These rails might not be accessible after the escalators are installed.

Installation Strength Rails are installed onto the ceiling using ¾” wedge bolts. The centers of the rails are the center of the ends of the escalators. This will allow approximately three feet in each direction for maneuvering the escalators into alignment and then onto their respective ledges. Trolley Stops: Installed after trolley is put on.

Rails – Each rail supports a trolley and air winch capable of handling 15,500 lbs. The estimated weights per rail when working: 392 – Rail 420 - Trolley/Winch/10ft Chain 153 – 30ft Chain 965 – Subtotal + 15,500 Escalator (Heaviest) = Total of 16,465lbs Average weight per rail when hoisting is 8,233lbs Tension Per bolt in 4000 psi concrete is 16,201lbs. 12 bolts per beam This concrete is 6000psi.

GSA SPEC FF-S-325C GROUP II, TYPE 4 CLASS 1 TECHNICAL SPECS Item Wedge Anchor Material Galvanized Steel Anchor Dia. 3/4" Anchor Length 7" Thread Size 3/4"-10 Thread Length 4" Min. Embedment 3-3/8" Embedment In Concrete 6-3/4" Max. Work Thickness 1/4" Ultimate Pullout (Lb.) 16201 Ultimate Shear (Lb.) 15126 Ultimate Shear in 3000 PSI Concrete (Lb.) Ultimate Shear in 4000 PSI Concrete (Lb.) Ultimate Tension (Lbs.) Ultimate Tension in 3000 PSI Concrete (Lb.) 13278 Ultimate Tension in 4000 PSI Concrete (Lb.) Agency Compliance UL and FM Meets/Exceeds GSA SPEC FF-S-325C GROUP II, TYPE 4 CLASS 1

REACHING THE WORK AREA In order to install the beams we need two workers to handle the beam and bolts. This will require an articulating boom man-lift. The GenieZ-40/23N RJ is shown extrapolated into the maximum reach. In the remaining images we show the beams installed with the tab stops toward the escalators, however, it was later determined they will be installed with the tab stops away from the escalators so the hoists can be installed from the open side.

INSTALLING THE HOIST The hoist and trolley combo with 10ft of chain will weigh approximately 420lbs. The chain will weigh an additional 155lbs for a total of 575lbs. This will require a spider crane to lift the hoist, trolley, and chain combination. The riggers will guide the hoist onto the beam and then attach the stops.

INSTALLING THE HOIST The hoist and trolley combo with 10ft of chain will weigh approximately 420lbs. The chain will weigh an additional 155lbs for a total of 575lbs. This will require a spider crane to lift the hoist, trolley, and chain combination. The riggers will guide the hoist onto the beam and then attach the stops.

Assembling Two Ends

Assembling The Two Ends The A-Frame hoisting system will be used to hoist and manipulate one half while the other half rests on blocks.

Assembling The Two Ends Once the two halves are joined EMR will finish connecting. Remember that workers will not be able to access the sides where two escalators are next to each other. Therefore belts or wiring that passes through these sides will need to be done before they are hoisted.

Assembling The Two Ends Once the two halves are joined EMR will finish connecting. Remember that workers will not be able to access the sides where two escalators are next to each other. Therefore belts or wiring that passes through these sides will need to be done before they are hoisted.

Assembling The Two Ends As each is finished they can be lowered onto casters to be moved and staged again until ready for installing.

Assembling The Two Ends As each is finished they can be lowered onto casters to be moved until ready for installing.

Assembling The Two Ends As each is finished they can be lowered onto casters to be moved until ready for installing.

Installation Steps Installing the Escalators

INSTALLING THE UNITS Once the two halves are assembled and the escalators readied the 1st escalator is installed into the pit up to the first level. This will be using an overhead rail and the manual gantry on casters. As the escalator is maneuvered around the first level ledge the A Frame will be able to move back and forth. Steel plate on the floor will help with load dispersion.

INSTALLING THE UNITS 1st Escalator is installed into the pit. This will be using a rail overhead and a manual gantry on casters. Steel plate on the floor will help with load dispersion.

INSTALLING THE UNITS 1st Escalator is installed into the pit. This will be using one rail overhead and a manual gantry on casters. Steel plate on the floor will help with load spread under the gantry.

INSTALLING THE UNITS 2nd Escalator is installed into the pit in the same manner. In some images the rails are missing. Since the rails might not be removed it is suggested that we build all 6 and leave them as shown.

2nd Escalator is installed into the pit in the same manner. INSTALLING THE UNITS 2nd Escalator is installed into the pit in the same manner. In some images the rails are missing. Since the rails might not be removed it is suggested that we build all 6 and leave them as shown.

2nd Escalator is installed into the pit in the same manner. INSTALLING THE UNITS 2nd Escalator is installed into the pit in the same manner. In some images the rails are missing. Since the rails might not be removed it is suggested that we build all 6 and leave them as shown.

INSTALLING THE UNITS The 3rd Escalator will now use both overhead rails. It will take approximately 1 day to move the air hoist and connect up the lines.

INSTALLING THE UNITS The 3rd Escalator will now use both overhead rails. It will take approximately 1 day to move the air hoist and connect up the lines.

INSTALLING THE UNITS The 3rd Escalator will now use both overhead rails. It will take approximately 1 day to move the air hoist and connect up the lines.

INSTALLING THE UNITS Now the 4th Escalator will be installed.

INSTALLING THE UNITS Now the 4th Escalator will be installed.

INSTALLING THE UNITS Now the 4th Escalator will be installed.

INSTALLING THE UNITS Now the 4th Escalator will be installed.

INSTALLING THE UNITS Now the 4th Escalator will be installed.

INSTALLING THE UNITS Now the 4th Escalator will be installed.

INSTALLING THE UNITS Now the 4th Escalator will be installed.

Dimension References - General Warnings and Dimension References - General

Warning: The rigging at the top of the highest lift will be close or will actually two-block the air hoist ! Therefore, the combination of lifting rigging will have to adjusted slightly less that the recommended angle.

Each Escalator has to be centered above their respective placement positions and then lowered straight down into position.

The chain will need to reach nearly the full ceiling height.

Trolleys will need to move about 3ft each way to clear the ledges.

Top escalators will need to lap over approximately 38 inches to allow the top end to clear.

The End