Introduction to Methods Engineering

Slides:



Advertisements
Similar presentations
Process Selection and Facility Layout
Advertisements

McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
INTRODUCTION TO MOTION AND TIME STUDY By Kanchala Sudtachat 1.
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
What We Believe At Wegmans, we believe that good people, working toward a common goal, can accomplish anything they set out to do. In this spirit, we set.
Chapter 15 Work Flows Focus: This chapter describes the basic tools and techniques for analysis.
1 IS 4420 Database Fundamentals Chapter 2: Database Development Process Leon Chen.
© The McGraw-Hill Companies, Inc., Operations Consulting & Reengineering Chapter 8 {Chase & Acquilano} - Handout.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Management 11e John Schermerhorn
13.1 © 2007 by Prentice Hall 13 Chapter Building Systems.
1 EI441 Work Analysis and Design Text book: Motion and Time Study by R.M. Barnes, 7 th ed. (1980). Topics: 1.Introduction, Productivity, Definition and.
Introduction to Systems Analysis and Design
David O’Sullivan Industrial Automation (IE423 Computer Integrated Manufacturing) (IE215 Design and Make) David O’Sullivan
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Manufacturing Engineering Department Lecture 1 - Introduction
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
How to Effectively Implement Set-up Reduction in Any Organization.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
Dr. Osama Al-Habahbah Automation Chapter 1 Introduction.
1313 CHAPTER SYSTEMS ANALYSIS AND DESIGN. © 2005 The McGraw-Hill Companies, Inc. All Rights Reserved Competencies Describe the six phases of the.
GROUP MEMBERS Ahsen Ali 11-IE-06 Mohsin Tariq 11-IE-22
Chapter 10 – Facility Layout
IE 101 Facilities Location and Design By Assist.Prof.Dr. Nureddin KIRKAVAK Department of Industrial Engineering.
7 Design of Work Systems.
Industrial Engineering I
Chapter 10 – Facility Layout
Chapter 4 Process Design.
7-1Design of Work Systems William J. Stevenson Operations Management 8 th edition.
Facility Layout Chapter 10 pages , ,
7-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Using Information Technology Pertemuan 12 Chapter 11 Information Systems.
Using Information Technology Chapter 11 Information Systems.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
L Productivity »definition »measures l People as key resource »Quality of Work Life »Work design –job content –work environment –work methods l Total Quality.
Facility Layout Chapter 10 pages ,
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
PRESENTATION ON Time and Motion Study BY:- KANIKA SOOD 108K18 AASHI AGARWAL 108K22.
Consulting and Reengineering
Systems Analysis and Design
Traditional Approaches to Facility Layout
Job Design Job design involves specifying the content and methods of job What will be done Who will do the job How the job will be done Where the job.
1 Methods Engineering & Layout Planning Chapters: 8.Introduction to Methods Engineering and Operations Analysis 9.Charting Techniques 10.Motion Study and.
SMU SE – LMMFC Collaboration Project Task 1 Approach and Process Systems Engineering Program Engineering Management, Information and Systems Department.
Chapter 12 THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition Chapter Achieving World-Class Operations.
Chapter 1 Introduction to Systems Design and Analysis Systems Analysis and Design Kendall and Kendall Sixth Edition.
Job Analysis. The process of collecting and organizing information about jobs performed in the organization and the principle elements involved in performing.
1 Using Information Technology Chapter 11 Information Systems.
IT Project Management, Third Edition Chapter 8 1 Chapter 5: Project Quality Management.
MANUFACTURING PROCESSES Chapter Seven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
7-1Design of Work Systems  Job design involves specifying the content and methods of job. IN general the goal of the job design is to create a work system.
Chapter 1 Assuming the Role of the Systems Analyst.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Facility Layout Chapter 10 pages , ,
7 Design of Work Systems.
Introduction to Motion and Time Study
Chapter 3: Cost Estimation Techniques
7 Design of Work Systems.
Operations Consulting and Reengineering
Object-Oriented Software Engineering Using UML, Patterns, and Java,
The University of Jordan Mechatronics Engineering Department
WORK STUDY.
Predetermined Motion Time Systems
FACILITY LAYOUT Facility layout means:
(Lecturer in Mech. Deptt.)
Summer Training Department of Industrial Engineering
Production and Operations Management
Chapter 7 Process Management.
Chapter 13 Building Systems.
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

Introduction to Methods Engineering and Operations Analysis Sections: Evolution and Scope of Methods Engineering – part 1 How to Apply Methods Engineering – part 1 Basic Data Collection and Analysis Techniques – part 2 Automation and Methods Engineering – part 2 Methods Engineering: هندسة الأساليب؛ هندسة طرق العمل

Introduction to Methods Engineering and Operations Analysis Evolution and Scope of Methods Engineering

Methods Engineering Analysis and design of work methods and systems, including the tooling, equipment, technologies, workplace layout, plant layout, and work environment Other names for methods engineering: Work study Work simplification Methods study Process re-engineering Business process re-engineering

Objectives in Methods Engineering Increase productivity and efficiency Reduce cycle time Reduce product cost Reduce labor content Q: what is the difference between productivity and efficiency?

Other Objectives Improve customer satisfaction Improve product and/or service quality Reduce lead times and improve work flow Increase flexibility of work system Improve worker safety Apply more ergonomic work methods Enhance the environment (both inside and outside the facility) Lead time: مدة الانجاز/مدة الإتمام/فترة الإنتاج

Operations Analysis Study of an operation or group of related operations for the purpose of analyzing their efficiency and effectiveness so that improvements can be developed Objectives in operations analysis Increase productivity Reduce time and cost Improve safety and quality Same basic objectives as methods engineering Q: what is the difference between efficiency and effectiveness? (see figure)

Methods Engineering Can be divided into two areas: Methods analysis Methods design

Methods Analysis Concerned with the study of an existing method or process Objectives: Eliminate unnecessary and non-value-adding work elements Combine elements and operations Rearrange elements into more logical sequence Simplify remaining elements and operations

Methods Design Concerned with either of the following situations: Design of a new method or process Required for new product or service and there is no existing precedent Method must be designed from scratch, using best existing practice for similar operations Redesign of an existing method or process based on a preceding methods analysis

Introduction to Methods Engineering and Operations Analysis How to Apply Methods Engineering

Systematic Approach Define the problem and objectives Analyze the problem Formulate alternatives Evaluate alternatives and select the best solution Implement the best method Audit the study A systematic approach is more likely to yield operational improvements than an undisciplined approach

Techniques of Methods Engineering Data gathering and statistical tools Charting and diagramming techniques Motion study and work design Facility layout planning Work measurement techniques New approaches Facility layout: تصميم الرافق / المصانع

Charting & Diagramming Techniques Network diagrams Traditional industrial engineering charting techniques Operation charts Process charts Flow diagrams Block diagrams Process maps Note, the next chapter (chapter 3) is dedicated to charting methods

Motion Study and Work Design Concerned with basic motions of a human worker while performing a given task Examples of basic motion elements: Reach Grasp Move Release Guidelines for work design include “principles of motion economy” Note, motion study will be treated in details in chapter 4

Facility Layout Planning Facility layout refers to: Size and shape of a facility Arrangement of the different departments and equipment within the facility Problem area includes: Design of a new facility Installing new equipment, retiring old equipment Expanding (or contracting) an existing facility

Work Measurement Techniques Four basic work measurement techniques: Direct time study Predetermined motion time systems (PMTS) Standard data systems Work sampling PMTS and work sampling can be used in methods engineering to make improvements in the work methods Note, there is a special chapter dedicated to each of these 4 basic work measurement techniques (chapter 5 – 8)

New Approaches Lean production Based on the Toyota production system Embraced by U.S. companies due to its success at Toyota Six Sigma and other quality-focused programs Widely adopted in industry for improving quality of work processes

Selecting Among Alternative Proposals Need for a systematic procedure to decide among alternative proposals To begin, list the technical features and functional specifications for the application Must features Desirable features Criteria matrix to evaluate alternatives Drop candidates that do not satisfy “must features” Develop scores for desirable features

Evaluation of Robots for Welding Note, above is called a “rates method” of evaluating design alternatives; There is also a “weights and rates method” (i.e. where features are not all equally-weighted)