Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Waste Isolation Pilot Plant Subcontractor Technical Representative Training Best Practice Presentation February 23, 2009 Marty Gonzales Washington TRU.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
1 MOSS ADAMS LLP | 1 Case Studies in Contract Close Out Audits May 2014.
Project Cost Management Estimation Budget Cost Control
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
Construction Work Packaging
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Introduction This presentation is intended as an introduction to the audit process for employees of entities being audited by MACD. Please refer to the.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Alpha Contracting Sole Source Negotiations between Government and Industry (13 CFR (c)(2))
What is project management?
Office of Procurement Services.  Vendor Application Website: 
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Business Continuity Planning 101
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
Construction Work Packaging
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
PROJECT COMMUNICATION PROCEDURE AND DOCUMENT MANAGEMENT
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Seminar On Energy Audit Submitted To: Submitted By:
EIA approval process, Management plan and Monitoring
CONTRACT ADMINISTRATION
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Content of Tender Dossier - Instructions to Tenderers - Tenders
Establishing and Managing a Schedule Baseline
Chisinau, Republic of Moldova 2017
Monitoring and Controlling the Project
Project Integration Management
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Information Technology Project Management – Fifth Edition
(Additional materials)
Flooding Walkdown Guidance
COMPREHENSIVE PLAN 2017 AMENDMENT PROCESS and DOCKET
Temporary Works Co-ordination
Leading Indicators and Dashboarding for Advanced Work Packaging
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Quality Management Systems – Requirements
Management of Change Report Errors to Management.
Infectious Disease Bureau,
Project Management Process Groups
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
How to conduct Effective Stage-1 Audit
Construction Contract Administration
Managing Project Work, Scope, Schedules, and Cost
Second Avenue Subway Project Execution Strategy
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Project Name Here Kick-off Date
Presentation transcript:

Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations

Contents Introduction to Change Management Importance of Change Management Process to Manage Changes Responsibilities Methodology Conclusions

Change Management Change Management is an Inevitable Project Requirement because, any project that has ever been completed has almost certainly had changes to it’s scope

Introduction

Change Management What is change? Change is an authorized alteration to base line scope of work initiated by any party involved in the Project (or) Change is defined as any deviation from the contractually agreed project scope, schedule or cost.

Change Management Changes can be different Contract Changes Internal Changes

Change Management Types Scope Change Schedule Change Cost change Interdependence change (i.e., Scope, schedule and cost changes are interdependent and a change to one will frequently cause changes to one or more of the others) It is important to understand difference between a development and a change

Importance

Change Management Necessity Modern day challenges in Project Execution Reduced timelines from Project Feasibility study to Implementation Less developed Front End Packages to Detail Engineering Early commitments on Procurement of Materials Early commitments on booking Fabrication yards, site contracts In Summary, controlled change management is necessary to meet the final Project Objectives

Process

Change Management Address all aspects The basis for a good change management system starts with the establishment of the scope baseline. A good scope change control system is one that makes sure that all of the stakeholders concerned with the change are made aware that it is being submitted, agreed upon, processed, disapproved or approved, and implemented. Change management must be careful to ensure that budgets, schedules, performance, and documentation are all changed to reflect the change.

Change Management Identification of Changes should be timely….

Change Management Identification of Changes should be structured….

Change Management Change Management Objective is to safeguard interests of all stake holders….

Change Management Sequence Identification Trigger events Formal instructions External Conditions Contract terms Errors/Omissions Pre-AFD and Post AFD changes have difference in the way they are dealt with

Change Management Sequence Notification Substantiation Formal Raising

Responsibilities

Change Management Responsibilities PM PEM Change Coordinator To Select, establish and implement an effective and appropriate system of Change control either database or manual system for the project and to discuss and agree with the client. PEM To Maintain change awareness in project engineering personnel and monitor for change activity. Change Coordinator To administer the change control procedure and change control databases where used.

Change Management Responsibilities Functional Leads/ All Project Personnel To Monitor their own scope of work, identify potential changes and bring them to the notice of their discipline group manager using change flags. Functional Manager/ Leader To review change flags raised by their group and bring valid flags to the attention of Area Project Engineer/ Change coordinator. Area Project Engineers To accept or reject change flags raised by managers and other discipline group leaders and to issue accepted change flags to the change coordinator.

Methodology

Change Management Methods of Change Control Review of Design Basis A review of key design documents shall be carried out at project outset against the agreed technical basis Client Changes Project personnel shall bring all potential changes initiated by the client to the attention of their PM or PEM using change flags.

Change Management Methods of Change Control Internal Changes Key design documents Project specific listing of key design documents shall be developed under the control of PEM for change control process immediately following the establishment of the document management system. Once a key design document has been issued AFD it shall be deemed “ frozen”. Any subsequent proposed internal changes (excepting to incorporate supplier/contractor data) shall be subject to formal change control using change flags.

Change Management Methods of Change Control Detail documents Internal changes to detail documents are unlikely to have significant impact at least until the documents have been released “ AFC”. Personnel shall however be alert to exceptional cases- ( Advance Revision notices) 3D CAD Model files Model files shall be considered to be in a state of development until agreed comments resulting from the formal client model reviews have been incorporated. Files shall thereafter be electronically “locked” and subject to formal change control.

Change Management Methods of Change Control Engineering Flow Diagrams Engineering flow diagrams are key design documents for which the state of development at each revision is specifically defined. Design growth trending Significant change impact may result from small cumulative changes such as Growth in I/O count for instrument control systems Growth in Electrical load requirements Growth on bulk material quantities taken off Growth in Piping Isometric drawing count Growth in estimated utility consumptions. Reports shall be provided to the Change coordinator at least monthly to enable an analysis of the reason for any design growth to be performed.

Change Management Methods of Change Control Engineering Flow Diagrams Internal Change Review Meeting To reinforce the change control process, PM shall hold internal Scope revalidation meetings on a regular basis. This meeting shall review all issued design documents and any other means of communication where change may result. This meeting shall call upon individuals, as necessary , to provide information or clarification on a issue that may result in a change flag. Changes to AFC documents: Any proposed Internal changes to a document AFC shall only be accepted if The plant would otherwise constitute a health/ safety hazard The plant would not otherwise confirm to agreed specs. There is a clear and well defined financial advantage to making the change which clearly overweighs the change impact by a significant margin.

Conclusion

Change Management Conclusion Meeting Project Objectives should be priority Must address interests of all Key stake holders Trust between stake holders (Client, Contractor, Vendors, subcontractors) is key for successful change management Change Management Process should be well documented and should stand for audit trail