Document Evaluation Process May 2005 Revision

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
EMS Checklist (ISO model)
ISO 9001:2000 Documentation Requirements
1 The aim…. ‘to enable assessors to objectively assess a laboratory’s compliance with the new standards’
EPSON STAMPING ISO REV 1 2/10/2000.
Environmental Management System Bruce Barnard Terry Parish Teresa Woodley.
The ISO 9002 Quality Assurance Management System
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
Legal & Administrative Oversight of NGOs Establishing and Monitoring Performance Standards.
ASPEC Internal Auditor Training Version
Financial Audit Autonomous Bodies Internal Control and Risk Assessment Session Internal Control and Risk Assessment.
Internal Auditing and Outsourcing
Introduction to ISO New and modified requirements.
Introduction to Software Quality Assurance (SQA)
Basics of OHSAS Occupational Health & Safety Management System
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Internal controls. Session objectives Define Internal Controls To understand components of Internal Controls, control environment and types of controls.
GUIDELINES ON CRITERIA AND STANDARDS FOR PROGRAM ACCREDITATION (AREA 1, 2, 3 AND 8)
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Important informations
Hazards Identification and Risk Assessment
BSBPMG505A Manage Project Quality Manage Project Quality Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG505A.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
QUALITY MANAGEMENT STATEMENT
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
S5: Internal controls. What is Internal Control Internal control is a process Internal control is a process Internal control is effected by people Internal.
ISO Registration Common Areas of Nonconformances.
SAM-101 Standards and Evaluation. SAM-102 On security evaluations Users of secure systems need assurance that products they use are secure Users can:
OHSAS Occupational health and safety management system.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Presented By Copyright 2011 Concord Associates Pte Ltd ConSASS Audit and Auditor’s Key Observations.
What is ISO Certification? Information is a valuable asset that can make or break your business. When properly managed it allows you to operate.
Internal Control. McGraw-Hill/Irwin © 2004 The McGraw-Hill Companies, Inc., All Rights Reserved. 7-2 Summary of Internal Control Definition A process...designed.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Unit Guide C ertificate IV in Project Management Qualification.
SUNY Maritime Internal Control Program. New York State Internal Control Act of 1987 Establish and maintain guidelines for a system of internal controls.

OH&S Management System
UNDERSTANDING ISO 9001:2008.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Internal Control Principles
Best Practices in Performing DSA Legacy Reviews
ISO/IEC
ISO 14001: 2004 Environmental Management Review Presentation
The ORR/RA and the Authorization Basis May 2005 Revision
Integrated Management Systems
Conduct of the Review May 2005 Revision
Readiness Review Course
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
Documenting the Review May 2005 Revision
Training Course on Integrated Management System for Regulatory Body
OH&S Management System
FORMAL SYSTEM DEVELOPMENT METHODOLOGIES
Air Carrier Continuing Analysis and Surveillance System (CASS)
The Quality System Chapter 13
Safety Assessment Efficiency Group 2 - Exercise 1
USNRC IRRS TRAINING Lecture18
Quick Facts Health & Safety Management
How to conduct Effective Stage-1 Audit
TS Training Presented by: Internal Auditor Training.
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
Process and Procedure Documentation
Radiopharmaceutical Production
Risk Management NDS Forum June 23rd 2010.
Presentation transcript:

Document Evaluation Process May 2005 Revision 8T8L May 2005 Revision

Upon successful completion of this topic, you should be able to: Describe the preparation for onsite document review Discuss the ORR/RA principle of sampling versus auditing Discuss the complete trail sampling technique Discuss good Team Member record / note keeping practices related to records review 8T8L May 2005 Revision

Review Preparation Flow Chart Requirements Objective Core Orders, Codes, Criteria Requirements Standards, Regulations Identification of Required Program & Processes Identification of important implementing Procedures / Policies Identification of important Systems, Structures, Components Identification of important Job Factors 8T8L May 2005 Revision

Review of Procedures What procedures* are required? * All documented, implementing mechanisms . . . Implement Regulatory Drivers . . . Programs and Processes . . . Implement Commitments . . . DSA/SAR / TSR / Accident assumptions; BIO / JCO / FHA, and EIS; List A/B, WSS, S/RIDs; Company / Operations Office procedures & requirements . . . Control Procedures, those not specifically required, but needed because of complexity, variability, risk, quality: Control and guide ops and activities to achieve desired outcome 8T8L May 2005 Revision

Review of Procedures (continued) Document Reviews do not have to be line by line copies of Order or regulatory driver, but must: Detail the mechanisms to fulfill the intent and requirements of the regulatory/contract driver . . . Detail the mechanisms and requirements to adequately control and document the activity . . . Focus on implementation . . . 8T8L May 2005 Revision

Review of Procedures (continued) Define the responsible individual(s) for each specified requirement . . . Be adequately communicated to and understood by those identified individuals . . . Comply with form and content guidance consistent with department and local expectations . . . 8T8L May 2005 Revision

Programs to Control Procedure Adequacy Review system: Procedures are adequate? V&V in the field? Configuration control: Procedures relate to systems; commitments identified? Formal change control? Adequate supervisory control: Ensure adequate implementation & performance of procedures? Issue and use procedures ensure only current revision in use? Training / Qualification and Assessment programs: Ensure procedures are adequately understood? 8T8L May 2005 Revision

Performance Review Flow Top Tier Requirement Performance Review Flow DOE / Operations Office Requirement Requirement Specific Contract (what) Requirements Company Policy / Procedure Manual Implementation Specific Project Procedures (how) Line Instructions Result Project Records

Sampling Not a complete document audit . . . Sample and expand if needed . . . Sampling may include complete vertical slice: Engineered change; USQ screening; Work package; 8T8L May 2005 Revision

Your Notes Detailed enough to reconstruct . . . Be able to describe the hierarchy and flow of requirements from highest directive to implementation . . . 8T8L May 2005 Revision

Step 1 -- Preparation At the programmatic or activity level select the target document(s) for review: Which are the best indicators of the program? Which are important to: Environment, safety and health? Safeguards and security? Mission? Prioritize documents to review . . . 8T8L May 2005 Revision

Step 1 -- Preparation (continued) Communicate with site counterpart to determine: appropriate site documents; custodians & control mechanisms of documents. Communicate with Team: avoid duplication of review; ensure that team members are aware of documents that may affect their review, and don't assume they know. Records of Performance comply with Requirements 8T8L May 2005 Revision

Step 2 --Document Review Read and understand the documents . . . Determine if document contains required information, from developed criteria . . . Determine how document is controlled . . . 8T8L May 2005 Revision

Step 2 -- Document Review (continued) Determine if document is consistent with facility and activities: Equipment/hardware/software; Personnel; Higher tier commitment; Related programmatic and performance requirements. Records of performance comply with Requirements? 8T8L May 2005 Revision

Step 3 -- Follow-up Check beyond the document evaluation: Training; Controls to ensure procedures are followed; Document configuration control. Check compliance of base level standards to codes, standards, regulations . . . Consider for interview topics . . . 8T8L May 2005 Revision

Step 4 -- Reporting In addition to the basic process reporting: Record the information relating to the review criteria; Check reference information; Integrate information gained into observation and interview processes; Discuss conclusions with Team Members, as appropriate; Meet expected Team Report and Forms 1 and 2 format. 8T8L May 2005 Revision

Summary… Does the documentation accurately and completely implement the requirements: Contractual? Authorization Basis? Programmatic? Performance? Is the documentation being implemented and requirements met? Is “Flow-Down” consistent, complete, and accurate? 8T8L May 2005 Revision