Module Loading Task Force Meeting October 21, 2004

Slides:



Advertisements
Similar presentations
Electrical and thermal testing at Glasgow and Liverpool.
Advertisements

Helicoflex Seals Stephen Haywood Rutherford Appleton Lab & Martin Gibson With input from Jason, Ian and Garlock.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Status and outlook of the Medipix3 TSV project
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Tracker Thermal Control System 2015年9月13日星期日 2015年9月13日星期日 2015年9月13日星期日 1 AMS-TTCS Status Report AMS-TIM meeting, CERN, Oct.28 th, 2008 ZH He On behalf.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Disk testing - status. Disk Test Setup we use similar setup as the one used for sector tests, only simplified (no C6F14 cooling system, no source test,
Planning Your Time. Why plan instead of just do? Time is one of the most critical resources in any project. Good planning spreads the necessary work over.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
LHCb VELO Meeting LHCb VELO Cooling System Bart Verlaat (NIKHEF) 25 February 2003.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
M. Gilchriese Thermal Shock. M. Gilchriese 2 Thermal Shock - Sector 9 Use liquid nitrogen vapor to cool sector rapidly. Setup is just dewar, valve and.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 25, 2004.
Stave 4028 Thermal tests Electrical tests. 4028: THERMAL TESTS We have studied the effect of the liquid speed on the modules heating. Test 1: all 13 modules.
Valencia Report 5 Pre-qualification (2 mechanical + 3 electrical) All inside mechanical specification in XY after assembled. However, Pre3-Pre5 bad planarity.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
MPI/ATLAS H.-G. Moser MPI, Munich Detector Status Delivered: 86% IV measured: 58% + Visual insp.: 39% fail : ~5%
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
ElComandante An ELaborate Computer Operated Modular Accessible Nested Data Aggregation Network Testing Environment.
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
at STFC Daresbury laboratory
Ti/SS transitions A.Basti INFN-PISA*
HO correctors update Massimo Sorbi and Marco Statera
MODULE QUALIFICATION STATUS AT LIVERPOOL
Sector 002 Assembly status report
GLAST Large Area Telescope:
Status of straw production straw module assembling
BDS Cryogenic System RDR Status and EDR Plans
Week coordinator report - C. Marchand
Tracker cooling loop “check out” draft for discussion
Teleconference ACS – FREIA 17th October 2017
T1 Electronic status Conclusions Electronics Cards:
Fault detection Lecture (1).
Update on HW commissioning
Consequences of warming-up a sector above 80 K
Acceptance criteria for cleanroom infrastructure
Hall A Target Status 9/27/16 Dave Meekins.
Overview of the Frascati Production Facilities
Overview of LBDS related tasks
Disk capacities in 2017 and 2018 ALICE Offline week 12/11/2017.
Gel Electrophoresis Teacher Instructions BioRad Set Up 12 groups
ROD assembly and test in US
Mathew C. Wright October 2016
Update of US Testing Status
UCSB Testing Status Anthony Affolder
Results from module testing
University of California Los Angeles
US Testing Update Anthony Affolder (On behalf of the US testing group)
Processor Fundamentals
Integration and Test Organization Chart
Informal document GRE-79-04
US Hybrid/Module/Rod Testing Model
US Module Testing Progress Report
Supplemental Test for Determination of CO2 Emissions under Regional Conditions Results from Telco Oct. 30th, 2014 (Iddo, Markus, Helge, Andreas)
US Module Testing Progress Report
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Wednesday 13th September 2017
Informal document GRE-79-xx
Presentation transcript:

Module Loading Task Force Meeting October 21, 2004 Sector Status Module Loading Task Force Meeting October 21, 2004

Sector Status 9005 – FE-I2 modules 9000 – FE-I3 bad modules Used for qualification and extensively tested (system test) 9000 – FE-I3 bad modules Used for final tune-up of assembly process Assembly completed. Survey completed - OK Preliminary( room T) electrical test done - OK Thermal imaging, thermal cycling and burn-in to be done Back in system test for now 9006 – 1st production unit Assembly and survey completed on September 24. OK Waiting for test system to be completed. 9007 Assembly and survey completed September 30. OK Thermal OK so far – see page 3 Room temperature electrical test complete – OK(see page 4) Will be first to go through complete production testing sequence 9008 Two modules loaded. One was not fully tested! Picked up wrong module in cleanroom! Procedure fixed!! Room temperature test on module OK, in burn-in 9009 Assembly and survey completed on October 19. See page 5 for survey Waiting for test system to be completed Have stopped assembly until production testing setup in place and working well

9007 Electrical

9007 Thermal

9009 Survey Note that some nominal values must be adjusted slightly to conform with reality, as built dimensions

Testing Status Room temperature, single module testing, slow source testing in place and working Box for cold testing, cycling and fast source test will just be completed by today. Burn-in boards ready Thermal camera/imaging working Will do low temperature soak in an environmental chamber separately to save time. Heat exchanger(for C6F14) cooling system contaminants. Origin not understood. Implementing second clean system from scratch with careful attention to cleanliness and leaks. Have also ordered FC-77 to try this route (ala Genoa) if necessary. In general, still at least a week, maybe more, from having complete production-quality testing validated. No more assembly until full testing system up and working reliably.

Planning Have capacity to easily increase sector assembly rate by about 25% above that shown in plan. Will need this unless testing gets moving.