FEE COOLING UPDATE CGEM Workshop - IHEP - June 13th 2017

Slides:



Advertisements
Similar presentations
So Far: Conservation of Mass and Energy Pressure Drop in Pipes Flow Measurement Instruments Flow Control (Valves) Types of Pumps and Pump Sizing This Week:
Advertisements

Status Update on Mechanical Prototype in Rome November 6,
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
Cooling Update (May 2011) Tim. Overview From last time – Estimate Power Loads Active components Extraneous heat sources – Develop methodology for exploring.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
So Far: Conservation of Mass and Energy Pressure Drop in Pipes Flow Measurement Instruments Flow Control (Valves) Types of Pumps and Pump Sizing This Week:
ATLAS TRT Barrel Design Review, 1998 Barrel TRT Electronics Cooling Chiho Wang Duke University.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
CERN-SLAC meeting June, The LHC Collimator Project LHC Collimators for Phase 1 CERN-SLAC meeting – June, Palo Alto, Ca Alessandro Bertarelli.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
M. Sannino for S. Cuneo - I.N.F.N. Genova1 Rich2 MAPMT Housing & Cooling Outdated designs and what is needed to get a final executive design Imperial College.
Page 1 Sapphire by pass line  Design Concept of Cooling Water System : Funnel 10 line Tank 2 10 tones Chiller -20cm tilt - 5cm distance between growers.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
Pixel upgrade test structure: CO 2 cooling test results and simulations Nick Lumb IPN-Lyon MEC Meeting, 10/02/2010.
Cooling Test Results on fuzzy carbon substrate Setup in Lotima Room Used water/glycol mix (70/30 by wt) Neslab chiller to set temp Small pump to get the.
W. EbensteinDOE annual review Duke UniversitySeptember, 1998 TRT Barrel Cooling: Electronics  Motivation: u Overheating of electronics causes premature.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Chopper Beam Dump Thermal Problem 10/27/20101PX Linac FE Technical Discussions.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
S A Griffiths CM42 June 2015 Electrical & Control.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
ATHCO-Engineering A/S
ATLAS Internal ID Service Integration
P. Sutcliffe Liverpool University
Feedback on transfer line sizing and flow calculations for UT
SVT Mechanics & Beam Pipe
Status of Cooling Development in Karlsruhe
DESIGN OF SHELL AND TUBE HEAT EXCHANGER
Che 451 chemical engineering design i HEAT EXCHANGER DESIGN
A PRELIMINARY THERMAL STUDY FOR L3 CGEM BOARD
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
"Drawer Mechanics - MiniDrawer"
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Objective 6.02 part 2: Recognize components of construction
The EMC cooling F. Raffaelli INFN - Pisa 06/09/2017.
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
Sector 002 Assembly status report
Axion Relics Thermal – mechanical simulation for a flange UHV 114/63 1D with copper gasket
Local Supports for Inclined Layout: CERN Update
Conservation of Mass and Energy
UPDATES on INSIDE MECHANICS
cooling for BGV modules
Date of download: 11/2/2017 Copyright © ASME. All rights reserved.
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
Barrel TRT Module Cooling
Mauro Savrie' INFN Ferrara
Integration issues at IHEP
The Stave Thermo-Conductivity QC Procedure Idea
Re-circulating CO2 Test System
Pixel CO2 Cooling Status
Recirculating CO2 System
Steam traps Applications and Recommendations
Updates on the Silicon Tracker 2S Module
Presentation transcript:

FEE COOLING UPDATE CGEM Workshop - IHEP - June 13th 2017 G.Giraudo INFN Torino

A COPPER BOX (HEAT EXCHANGER) ADDED TO FE1 BOARDS THERMAL CONTACT THROUGH THERMAL INTERFACE MATERIALS (ELECTRICAL INSULATOR) (THERM-A-GAP PARKER CHOMERICS, k=6.5 W/m∙K) (THERMFLOW 777 PARKER CHOMERICS, k=7.7 W/m∙k) DELIVERY & HEXAUST OF THE COOLANT THROUGH SS 316 TUBES & FITTINGS ALL COMPONENTS ARE BRAISED/GLUED BOX FIXED ON FE1 BOARD WITH SCREWS (not shown) WEIGHT < 50 g LAYER 3 LAYERS 1&2 CGEM Workshop - IHEP - June 13th 2017 G.Giraudo INFN Torino

Tmax =21.5 oC WATER TIN18 °C 0.5 l/min ΔP=0.05bar THERMAL LOAD=0.8 W WATER TIN18 °C 0.5 l/min ΔP=0.05bar THERMAL LOAD=0.8 W CGEM Workshop - IHEP - June 13th 2017 G.Giraudo INFN Torino

FIRST PROTOTYPES - ALL PARTS ARE GLUED WITH ARALDITE 2014 CURED AT 150 °C/2 h TEST IN PRESSURE/WATER 4 bar/5 h PRESSURE DROP TEST NOT PERFORMED YET CGEM Workshop - IHEP - June 13th 2017 G.Giraudo INFN Torino

HEAT EXCHANGER LAYER 1&2 Tmax =29.7 °C 4 RESISTORS (100Ω) FIXED WITH THERMAL GLUE (k=4 W/m∙K) TWATER = 18 °C - q=0.5 l/min Tmax =29.7 °C CGEM Workshop - IHEP - June 13th 2017 G.Giraudo INFN Torino

HEAT EXCHANGER LAYER 3 Tmax =28.8 °C 4 RESISTORS (100Ω) FIXED WITH THERMAL GLUE (k=4 W/m∙K) TWATER = 18 °C - q=0.5 l/min Tmax =28.8 °C CGEM Workshop - IHEP - June 13th 2017 G.Giraudo INFN Torino

LAYER 3 18 heat exchangers in two groups (9+9) 1 line IN + 1 line OUT DELIVERY EXHAUST CGEM Workshop - IHEP - June 13th 2017 G.Giraudo INFN Torino

LAYER 2 14 heat exchangers in two groups (8+6) 1 line IN + 1 line OUT DELIVERY EXHAUST CGEM Workshop - IHEP - June 13th 2017 G.Giraudo INFN Torino

LAYER 1 8 heat exchangers in one group 1 line IN + 1 line OUT EXHAUST DELIVERY CGEM Workshop - IHEP - June 13th 2017 G.Giraudo INFN Torino

BES III CGEM INLET LINES 2.5 l/min ø6xø4 - 0.5 l/min ΔP=0.45 bar - 9 FEE modules ø8xø6 - 1 l/min ΔP=0.025 bar/m - Re=2650 LAYER 3 ΔP=0.015 bar/m - Re=3530 ø6xø4 - 0.5 l/min ΔP=0.45 bar - 9 FEE modules ø4xø2.5 - 0.5 l/min ΔP=0.30 bar - 6 FEE modules ø6xø4 - 1 l/min LAYER 2 ΔP=0.23 bar/m - Re=4230 2.5 l/min ΔP=0.08 bar/m - Re=5300 ø4xø2.5 - 0.5 l/min ΔP=0.40 bar - 8 FEE modules ø6xø4 - 0.5 l/min ø4xø2.5 - 0.5 l/min LAYER 1 ΔP=0.025 bar/m - Re=2650 ΔP=0.23 bar/m - Re=4230 ΔP=0.40 bar - 8 FEE modules BES III CGEM CGEM Workshop - IHEP - June 13th 2017 G.Giraudo INFN Torino

HYDRAULIC LAYOUT PATCH PANEL CGEM Workshop - IHEP - June 13th 2017 G.Giraudo INFN Torino

SHOPPING LIST 2 CHILLERS: Pterm≈0.5 kW, q≈4 l/min, P≈4 bar 40 HEAT EXCHANGERS LAYER 3 45 HEAT EXCHANGERS LAYER 1 & 2 FITTINGS PATCH PANEL(S) HYDRAULIC COMPONENTS ANCILLARIES ESTIMATED TOTAL COST≈25÷30 k€ (outside construction) ≈12÷15 k€ (in-house construction) CGEM Workshop - IHEP - June 13th 2017 G.Giraudo INFN Torino