Project conclusions and recommendations Thierry Arino (Sofréavia)

Slides:



Advertisements
Similar presentations
Slide 1 July 2004 – FALBALA/WP5/FOR5/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Work Package 3 Chris Shaw & Karim Zeghal (EUROCONTROL) CARE/ASAS Action.
Advertisements

Slide 1 July 2004 – FALBALA/WP5/FOR2/D – CENA, DFS, EEC, NATS, Sofréavia & UoG WP1 – Current situation analysis – Airspace perspective Béatrice Raynaud.
ASAS Thematic Network – Rome April 2003 Session 2-B Cost / Implications ASAS Impact on Ground Systems An Industry Viewpoint Thales ATM Peter.
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
Operational applications enabled by ADS-B
ASAS Thematic Network Workshop #2: TAGA - Traffic Awareness for General Aviation DFS Research and Development October 2003 TAGA - Traffic Awareness for.
Mediterranean Free Flight ASAS Separation and Spacing Presented by Andy Barff – Project Leader MFF Real-time Simulations ASAS-TN, Malmö
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-85/PIA-3 Air Traffic Situational Awareness (ATSA) Workshop on preparations.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
SESAR and ASAS Opportunity
Applications from packages I to III
Ames Research Center 1October 2006 Aviation Software Systems Workshop FACET: Future Air Traffic Management Concepts Evaluation Tool Aviation Software Systems.
The pilots view on ASAS A highlevel perspective on ASAS by a pilot with ASAS expertise knowledge. Presented at the ASAS Thematic Network Workshop 07OCT.
© 2003 The MITRE Corporation. All Rights Reserved. Cockpit Display of Traffic Information (CDTI) Enhanced Flight Rules (CEFR) Randall Bone October 7, 2003.
Federal Aviation Administration ASAS issues identified in the AP23 work ASAS-TN2.5 workshop 13 Nov 08, Rome By Jean-Marc Loscos, DSNA.
1 CoSpace Experimental results on sequencing & merging Karim Zeghal ASAS Thematic Network, Second workshop 6-8, October 2003, Malmö, Sweden.
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
Airbus vision of future ASAS Christophe MAILY – Airbus ASAS in a future ATM system Rome, April 2006.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
Slide 1 July 2004 – FALBALA/WP5/FOR3/D – CENA, DFS, EEC, NATS, Sofréavia & UoG WP2 Current situation analysis – Aircraft perspective Philippe Louyot (CENA)
ASAS FRA OB/T ATM Projects Lufthansa point of view.
ADVANCED AVIATION TECHNOLOGIES RELATED TO AVIATION CAPACITY IMPROVEMENTS Prepared for: MTC Prepared By: Don Crisp ATAC February 23, 2007.
NextGen Current System Primary Radar – Creates blip on Radar Screen Secondary Radar – Aircraft encodes identifier and telemetry data VHF Radio – Voice.
Direction de la Technique et de l’Innovation 23 Mars 2006 ASAS implementation the DSNA views ASAS TN 2 Worshop Session 4: Integrating ASAS in an evolving.
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
4 th Workshop, Amsterdam, April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone
Shaping Boeing Surveillance Strategy Drivers & Obstacles ASAS Thematic Network II.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
Airbus Status on ADS-B In / Out Update
NUP Phase 2 – Extended Visual Acquisition (EVA) and Airborne Approach Spacing (AAS) Oliver Reitenbach / DFS, Matthias Groth / DLH September 2005 / Slide.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
4 th Workshop, Amsterdam, April 2007 page 1 ASPA-S&M in Paris ASPA-S&M in Paris: CRISTAL PARIS and PALOMA results Jean-Marc Loscos, DSNA.
2 nd Workshop, April 2006 ASAS in Tomorrows Airspace Pierre Gayraud, THALES Bob Graham, EEC Tony Henley, BAe Systems Dr Anthony Smoker, IFATCA ASAS-TN2.
Slide 1 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 ACAS / ASAS interaction IAPA Project Thierry.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
ADS-B An Industry Perspective New Technologies Workshop Washington, DC January 10, 2007.
ASAS TN Third Workshop, April 2004, Toulouse 1 Session 2 Functional and Technical issues and Solutions Chairperson : JC Richard Secretary : G Matrella.
1 Controller feedback from the CoSpace / NUP II TMA experiment ASAS-TN, April 2004, Toulouse Liz Jordan, NATS, U.K. Gatwick approach controller.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
ASAS TN Third Workshop, April 2004, Toulouse Session 1 Use of the System by pilots and controllers Tony Henley.
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Workshop on preparations for ANConf/12 − ASBU methodology
ASSTAR Overview Jean-Marc Loscos, DSNA
Workshop on preparations for ANConf/12 − ASBU methodology
KDC ASAS 2008 project - How could ASAS benefit the NL ATM System
Chris Shaw, EUROCONTROL Experimental Centre
ASSTAR Oceanic Session Summary
Fredrik Barchéus, KTH Lena Mårtensson, KTH Anthony Smoker, IFATCA
Rome November 2008 Johan Martensson, CASCADE
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
EUROCONTROL SURVEILLANCE STRATEGY
Karim Zeghal EUROCONTROL Experimental Centre
Workshop on preparations for ANConf/12 − ASBU methodology
The air traffic controller’s perspective on runway incursion hazards and mitigation options Session 2 Presentation 1.
FAA and JPDO ASAS Activities
The air traffic controller’s perspective on runway incursion hazards and mitigation options Session 3 Presentation 3.
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

Project conclusions and recommendations Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA Project Dissemination Forum – 8th July 2004 Project conclusions and recommendations Thierry Arino (Sofréavia)

Synthesis – Applicability ATSA-AIRB ATSA-VSA ASPA-S&M Applicable in various environments Applicable in Frankfurt Unlikely to be applicable in Paris and London (where there is no use of visual separation on approach) Possibly applicable in other airports (e.g. Nice) Compatible with Paris (in particular CDG) and London Gatwick current characteristics Possibly compatible with Frankfurt current characteristics Hardly compatible with London Heathrow current characteristics

Synthesis – Limitations ATSA-AIRB ATSA-VSA ASPA-S&M Partial ADS-B out equipage Impact on pilots’ workload depends on design options Possible increase in controllers’ workload due to pilots’ queries CDTI requirements are ASAS applications dependent CDTI use may lead to greater spacing Impact on pilots’ workload depends on level of automation Possible controllers’ de- skilling Improper use can lead to degraded situations

Synthesis – Expected benefits ATSA-AIRB ATSA-VSA ASPA-S&M Safety expected mostly in remote areas Significant safety improvements expected for VFR flights Shared views between pilots and controllers: a challenge to quantify Gain in capacity with staggered approaches to dependent parallel runways, but unclear benefits for single runways Additional safety from CDTI use (aid to visual acquisition and better ability to maintain own spacing) Possible reduction of pilots’ and controllers’ workload Increased controllers’ availability and more anticipation in sequence building Better stability of flows with more a/c getting optimal spacing values Better understanding of the situation and gain in anticipation by pilots

FALBALA results Better understanding of the current situation for 3 major TMAs Initial assessment of CDTI to support traffic situational awareness in core Europe Objective radar data analysis complemented by operational feedback & experiment result analysis

FALBALA conclusions Airspace / airport characteristics and traffic demand must be considered when assessing applicability and benefits Radar data analysis is of particular interest for such objectives Operational benefits depend on the Airborne Surveillance application and the operational environment

Recommendations for future work Further benefit analysis should be performed Enhancement of benefit evaluation process based on radar data extrapolation ATSA-AIRB: Design studies for determining the appropriate traffic filtering ATSA-VSA: Investigation of the US & Europe difference in operations ASPA-S&M: Development of experiments for specific operational environments & design studies for determining the appropriate level of automation Assessment of the required level of a/c equipage and cost analysis of avionics retrofit Compared assessment of the most promising ASAS applications and alternative operational improvements