Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016

Slides:



Advertisements
Similar presentations
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Advertisements

Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Large Scale and Performance Tests of the ATLAS Online Software CERN ATLAS TDAQ Online Software System D.Burckhart-Chromek, I.Alexandrov, A.Amorim, E.Badescu,
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
T1 hardware Detector Control System, OK several automates have been added, LV and HV sequences. FSM manages transition between Busy, ON and OFF states.
1 GTK-WG Meeting, CERN, Apr 1st 2014, A. Cotta Ramusino for INFN and Dip. Fisica FE “off-detector” readout electronics for the Gigatracker: status update.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
Overview, remarks, lamentations, hope and despair M. Sozzi TDAQ WG meeting CERN - 4 June 2013 Introduction, news and appetizer.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
“Planning for Dry Run: material for discussion” Gianluca Lamanna (CERN) TDAQ meeting
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
SRB data transmission Vito Palladino CERN 2 June 2014.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
FW and HW Status TDAQ WG 10/6/2015. Hardware MPOD: ◦ HV was NOT floating   Sensibility of current limit to external devices  Particularly for chamber.
Straw readout status Status and plans in Prague compared with situation now Choke and error Conclusions and plans.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
The NA62RunControl: Status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 10/06/2015.
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
DHH at DESY Test Beam 2016 Igor Konorov TUM Physics Department E18 19-th DEPFET workshop May Kloster Seeon Overview: DHH system overview DHE/DHC.
“Technical run experience” Gianluca Lamanna (CERN) TDAQ meeting
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
Straw readout status Run 2016 Cover FW SRB FW.
Status of NA62 straw readout
Software Overview Sonja Vrcic
CLAS12 DAQ & Trigger Status
LKr status R. Fantechi.
LAV front-end and readout status
Michal Koval (CERN) Straw WG Meeting
ABC130: DAQ Hardware Status Matt Warren et al. Valencia 3 Feb 2014
* Initialization (power-up, run)
Vito Palladino Straw Working Group 23/3/2015
Enrico Gamberini, Giovanna Lehmann Miotto, Roland Sipos
Injectors BLM system: PS Ring installation at EYETS
DAQ for ATLAS SCT macro-assembly
Status of the Merlin Readout System
Online Software Status
Hall A Compton Electron detector overview
Run experience Cover FW SRB FW DAQ and monitoring
Darin Acosta University of Florida
The Ohio State University
CPM plans: the short, the medium and the long
TDAQ commissioning and status Stephen Hillier, on behalf of TDAQ
CMX Status and News - post PRR -
RoD set-up for the TileCal testbeam, 2003 period.
Status Report and highlights from workshop II
Applications Issues.
Applications Issues.
Presentation transcript:

Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016 GTK DAQ Status Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016

Enrico Gamberini, TDAQ WG meeting, 01/06/2016 Road map (from 10/02/2016) Identified 6 item to prepare next run: 1. Carrier reset via optical fiber from GTK-TTC. 2. Individual GTK-RO reset. 3. Software controls for 1 & 2. 4. Automatic (inter-burst) PLL lock control. 5. GTK-PC output optimization (L1 read-out *). 6. Investigation of hang-up after “SoB/EoB burst”. * see Giovanna's talk at GTK WG 09/02/2016 Enrico Gamberini, TDAQ WG meeting, 01/06/2016

Enrico Gamberini, TDAQ WG meeting, 01/06/2016 Road map (done so far) Situation report: Carrier reset via optical fiber from GTK-TTC. - hw, fw, sw OK & tested (Stefano). Individual GTK-RO reset. - implemented in fw and tested (Angelo). Software controls for 1 & 2. - complete RC server integration for GTK-RO reset. - carrier reset not integrated. Automatic (inter-burst) PLL lock control. - added automatic recovery procedure. GTK-PC output optimization (L1 read-out). - working and mostly debugged. Enrico Gamberini, TDAQ WG meeting, 01/06/2016

GTK-RO (hardware & firmware) 30 boards installed + 3 spares for “triggerless” DAQ. 1 board broken (FPGA not initializing) on 25th of April. Swapped momentarily but will need repairs. “Loopback” mode implemented in fw. Allows to test the “downstream” DAQ chain triggering on fake (self- generated) hits. Useful for rate tests and L1 readout debugging. New readable registers to check data links lock. Enrico Gamberini, TDAQ WG meeting, 01/06/2016

Enrico Gamberini, TDAQ WG meeting, 01/06/2016 GTK-PC Extension to 6 PC completed: - installation and networking (Alberto) - sw - Run Control (Nicolas). Updated GTK-RO+TDCPix initialization procedures. - still some details to take care for TDCPix recovery... Solved the understood problems in input rate (the not understood one disappeared on its own...). Tested input and output with 2M L0 (200k L1) per burst. No problem detected. - will be tested with higher rates as soon as possible. (done this morning → spotted a GTK-RO fw issue) Enrico Gamberini, TDAQ WG meeting, 01/06/2016

Enrico Gamberini, TDAQ WG meeting, 01/06/2016 GTK-PC L1 readout can work in normal or “emulation” modes. L1 readout working reliably in stable conditions but still sensible to “exceptions” from GTK-RO and PC Farm. - need to be handled safely. Added logging to spot problems. Enrico Gamberini, TDAQ WG meeting, 01/06/2016

Enrico Gamberini, TDAQ WG meeting, 01/06/2016 Conclusions Lot of work done since February meeting. Still some details to take care during this week in order to be ready for the brand new GTK_5 (installed next week). DAQ is overall stable and the GTK should always be read out (also without beam) for noise monitoring. Enrico Gamberini, TDAQ WG meeting, 01/06/2016

Other infos (1): Set up hw and sw to acquire triggerless (TL) data along with normal trigger matched operation: - checked conditions to lock data links of slave board (Angelo) - updated sw used previous year for TL DAQ (Enrico & Alberto).

Other infos (2): Raspberry Pis for communication with Carrier: - Installed 3 Raspberry Pis near the GTK’s power supply crates with the help of Michel. - Michel installed a carrier (without detector) in the cavern to allow us testing the i2c communication with the Pis. After some debugging (broken cable to position 3) we checked the 3 Pis were able to communicate with the carrier.