Off-Site Visit Procedures and Documentation Considerations

Slides:



Advertisements
Similar presentations
Tips to a Successful Monitoring Visit
Advertisements

ASPIRE Off-Site Visits. Rationale Why make an allowance for off-site visits in the protocol? Adherence & Retention Off-site visits Improving Clinic Flow.
HIV Counseling &Testing. Page 346 HIV and Risk Reduction (RR) Counseling Required at all scheduled visits Includes HIV Pre- and Post-test counseling.
ASPIRE TRAINING RANDOMIZATION & INITIAL DISPENSING Cindy Jacobson, PharmD (MTN) Jen Berthiaume/Missy Cianciola (SCHARP)
CTR Form B: Testing Information. Overview: Form B collects information about the testing and counseling services provided to a client. It is intended.
Region 3 Monitors April What is a REED? It is a “process” whereby the IEP team reviews existing evaluation data to make evaluation decisions about.
Study Product Adherence Counseling At Follow-up Visits
Contraception/Pregnancies MTN 020. Why do we care? Participants must come off product during pregnancy and breastfeeding – Studies of dapivirine in pregnant.
Study Product Adherence Counseling At Enrollment MTN-003 Study-Specific Training.
ASPIRE TRAINING Study Product Considerations & Accountability for Non-Pharmacy Staff.
Midwest AIDS Training & Education Center Health Care Education & Training, Inc. HIV/AIDS Case-Finding In Family Planning Clinics.
Ethics in Business Research
MTN-028 Enrollment Visit Procedures Phase 1 Pharmacokinetic Trial of Two Intravaginal Rings (IVRs) Containing Different Dose Strengths of Vicriviroc (MK-4176)
1 Meeting with Contacts for TB Assessment. Learning Objectives After this session, participants will be able to: 1.Explain why contact assessments are.
MTN-028 Study Product Considerations Cindy Jacobson Lindsay Kramzer Microbicide Trials Network.
Notice of Privacy Practices Nebraska SNIP Privacy Subgroup July 18, 2002 Michael J. Brown, MHA, CPA Vice-President, Administrative & Regulatory Affairs,
Unit 6: Training and Supervision # Warm Up Questions: Instructions  Take five minutes now to try the Unit 6 warm up questions in your manual. 
Product Use Management MTN 020 Training. Objectives- study product tab  Identify the conditions that would require a product hold or discontinuation.
Follow-up Visit Procedures MTN-028 Study Specific Training.
Module 5: Data Collection. This training session contains information regarding: Audit Cycle Begins Audit Cycle Begins Questionnaire Administration Questionnaire.
Study Product Return Re-Supply and Re-Issue MTN-003 Study-Specific Training.
Dispensary and Administration Site Information Presentation.
New HIV Testing Requirements What Physicians Need to Know.
Protocol Deviations. MTN protocol deviation policy  MTN has recently revised their policy on PDs- this policy will be made available on the MTN website.
1 Module 2: HIV Counseling and Testing for PMTCT Ministry of Health/HAPCO, Ethiopia.
Slide 1 Standard Operating Procedures. Slide 2 Goal To review the standard operating procedures Creating the informed consent document Obtaining informed.
Responsibilities of Sponsor, Investigator and Monitor
MTN-025/HOPE Decliner Population Procedures. Who are the Decliner Population? Former ASPIRE participants who decline or express no interest in joining.
Protocol Requirements for Product Holds/Discontinuations MTN-025.
1 HOPE Product Use Management: HIV Infection no rapid test(s) positive CONTINUE product. HOLD product pending confirmatory testing. PERMANENTLY DISCONTINUE.
Sponsor Visits and Monitoring Barbara Gallagher, RN Clinical Research Nurse Jefferson Clinical Research Institute.
IMPAACT 2010 Protocol Specifications for Recruitment, Screening, and Enrollment No updates.
IMPAACT 2010 Screening Visits
Informed Consent Objectives: Review – Types of informed consent
Planning for HOPE PUEVs and Study Exit Visits
Overview of Visit Scheduling and Types of Follow-up Visits SCHARP
IMPAACT 2010 Screening Visits
Non-Compliance Behaviors General Overview of Physical Restraint Requirements for Public Education Programs Prepared by the Massachusetts Department of.
Responsibilities of Sponsor, Investigator and Monitor
Management of Pregnancies
Process for Enrolling New Special Education Students
Overview of Follow-up Procedures
IRB reporting updates.
MTN-036 Study of Extended Duration Dapivirine Vaginal Ring for HIV Prevention How do I know if I’m Eligible to join? Women who join the study must.
MTN-025 Data Communiqué #1 CRF Updates.
Welcome to the Nevada Test Administration Training and Q&A Session
Protocol References Section Title 6.2 Entry Visit 5.1
HOPE STUDY PRODUCT TRAINING PHASE 2
Protocol References Section Title 6.2 Entry Visit 5.1
IMPAACT 2010 Screening Visits
MTN-037 Training Julie Ngo SCHARP April 12, 2018.
MTN-026 Study Product Considerations
MTN-037 Screening and Enrollment
MTN-037 Study Product Considerations
Module 8 CD-JEV immunization campaigns
Overview.
Overview of Enrollment Procedures
Eligibility Determination IFSP Meetings IFSP Service Implementation
HIV Counseling.
Employees’ Guide to Parental Leave
The HIPAA Privacy Rule and Research
Protocol Requirements for Product Holds/ Discontinuations
Participant Retention
The Health Insurance Portability and Accountability Act
HOPE STUDY PRODUCT TRAINING
Medical Students Documenting in the EMR
Revised Common Rule: Informed Consent Changes
TRACE INITIATIVE: HIV Testing Services (HTS)
Overview of the POC EID Training Toolkit
Good clinical practice
Presentation transcript:

Off-Site Visit Procedures and Documentation Considerations MTN-025/HOPE Off-Site Visit Procedures and Documentation Considerations Outline: Rationale for & overview of off-site visits Review which procedures can occur off-site and what modifications can be made Review study product considerations for off-site visits Review documentation for off-site visits

Why have off-site visits in HOPE?

Why have off-site visits in HOPE? Flexibility to support participants Gaining input from those who decline full study participation (decliner group) Off site visits allow the flexibility to conduct a visit (or certain visit procedures—such as supplying more study product), even when a participant can not make it to the clinic. You will find more detail on conducting off-site visits in SSP Section 6, participant follow-up

Overview of off-site visits Off-site visits are not the same as outreach! What are some differences between off-site visits and outreach?

Overview of off-site visits Off-site visits are not the same as outreach! What are some differences between off-site visits and outreach? The purpose of the off-site visit is to conduct study procedures, while the purpose of outreach is to trace participants, and to inform & engage participants and the community Off-site visits require informed consent while outreach requires permission Off-site visit procedures are also different from participant contacts made for the purposes of retention/tracing or to collect product in response to a product hold/discontinuation; these procedures are described separately in SSP Section 8 and Section 10, respectively.

Q&A: off-site visits When should you use an off-site visit? When has your site used off-site visits in the past? Potential examples: Participant does not have time or is unable to come to the clinic for the visit To conduct decliner population visit procedures (see SSP Section 2) Follow-up on an adverse event/ serious adverse event Collect samples that were inadequately collected or inadvertently missed at scheduled visits or compromised in transit to or at laboratory Collect confirmatory HIV samples Provide/collect study product Follow-up on a participant who: is unable to come to the clinic and may potentially fall outside of the visit window for the current visit has voluntarily withdrawn from the study, but is willing to have a final HIV test/ pregnancy test/ safety bloods drawn off-site

Overview of off-site visits When should you use an off-site visit? When has your site used off-site visits in the past? Off-site visits should be used for special circumstances, at IoR/designee discretion Decliner Procedures Off-site visits should not occur for every single visit. Typically, visits should occur in the clinic, and we expect off-site to be used as an option when necessary, but hopefully infrequently (primarily due to staff time/resources they take, and also because not all procedures can be conducted off site). Site leadership should use good clinical judgment and discretion when determining that an off-site visit is needed for a particular participant. It is strongly suggested that sites include the option of off-site visits for a defined set of reasons and procedures based on site capacity thus ensuring advance preparation to respond to adherence and/or retention issues. However, we do foresee many of the decliner visits occurring off-site, since these participants may not be interested in visiting the clinic. We will go into more detail about off-site visits for decliners later in this presentation.

Procedures & Processes for Off-site Visits Informed Consent Permitted locations Participant home or other venues where participant & staff are comfortable, and where safety & confidentiality can be maintained Permitted Visit Types All follow-up visits and decliner visits Off-site  visit procedures (excluding site procedures for retention efforts and product collection due to product hold) may only be conducted if the participant has provided written consent to be visited by study staff outside of the clinic – except for the decliner population, who can give permission verbally via phone call to have informed consent conducted off-site. During the administration of the informed consent for off-site visits, or requesting permission to conduct IC off-site for decliners, sites should discuss with participants any issues that may jeopardize participant confidentiality and/or safety, such as living situation (e.g., persons living with participant, availability of private space at participant’s home or place of work). Also, in an effort to minimize the potential risk of social harm to participants and to study staff who will conduct off-site visits, discuss with participants whether they have disclosed participation in the study to family, neighbors, or others who may learn of these off-site visits. Where participation has not been disclosed, maximal effort should be made to ensure inadvertent unwanted disclosure does not occur as a consequence of the off-site visit.

Procedures & Processes for Off-site Visits Study Procedures Procedures should be largely the same as an in-clinic visit Some procedures may be modified or conducted only at the clinic because of limited ability to carry them out in an off-site visit (ACASI, pelvic & physical exams) Document within participant records what occurs on or 0ff-site Site staff should document within participants records which visits were conducted off-site and what procedures were omitted or modified as a consequence (if any). As with any visit (in-clinic or off-site), participants have the right to decline/refuse completing any study procedures; site staff should clearly document refusals in the participant chart. Effort should be made to finish required visit procedures that are not conducted during an off-site visit as part of a split visit within the visit window.

Off-site Visits for Decliners Procedures for enrollment & completion of visit Permission to conduct informed consent off-site can be given via phone call prior to the visit Staff to document status of each eligibility criteria Staff to confirm eligibility with IoR or designee via phone call All procedures can be carried out with the enrolled participant Upon return to the site, IoR or designee will provide final written verification of eligibility Permission to carry out informed consent procedures can be gained verbally on the phone call before the visit, and should be outlined within site SOPs.

Minimum Procedures for Vaginal Ring Dispensation The same as minimum procedures for VR dispensation within the clinic Any further evaluations needed must be conducted prior to dispensing study product, and may require a follow-up clinic visit Follow the same procedures for vaginal ring dispensation in off- and on-site visits as discussed in the study product considerations session. If further procedures are needed, such as HIV or pregnancy testing, these must be carried out before VR is dispensed. AE assessment and reporting (verbal report of symptoms is acceptable; if symptoms indicate that further evaluation is necessary, this must be conducted prior to dispensing study product) HIV pre- and post-test counseling and pregnancy testing are required for product dispensation if this has not been done within the past 90 days. Collection of Used Ring (and unused, if applicable), if available As needed, HIV Prevention Options Counseling/Product Use Instructions

General Considerations Verifying Consent Safety/Confidentiality Staffing Managing symptoms/conditions requiring medical attention Materials/Supplies Required The next few slides contain information that should be considered within site SOPs, such as: Procedures for contacting and scheduling participants for off-site visits. Procedures for verifying participants’ consent prior to conducting off-site visits. Procedures to protect the safety of study staff, participants and any family members present during off-site visits, as well as confidentiality of participants. Identification of staff member roles and responsibilities for off-site visits: In general, most off-site visits will require two staff members, including one who is able to provide clinical assistance in case of symptoms or AEs, perform phlebotomy, conduct and verify rapid tests results and assist with specimen processing Ensure that at a minimum one of these staff members are conversant in the language of choice of the participant Ensure that these staff members are thoroughly versed in confidentiality and pharmacy and lab chain of custody issues Procedures for management of symptoms/illness requiring medical attention. Specifically, procedures for management of positive pregnancy tests, positive or discordant HIV rapids, STI symptoms, contraceptive use and potential SAE/EAE, as well as provision of any necessary referrals should be described. NOTE: If genital symptoms are reported during an off-site visit, the participant should be asked to report to the clinic as soon as possible for a pelvic exam. Generally, if any issues requiring further follow-up arise at an off-site visit, the participant should be referred (or brought) to the clinic as soon as possible for further evaluation. Depending on the severity of the issue, site staff may need to transport participant immediately from the off-site visit to the clinic or nearest healthcare facility. Description of how routine participant identification procedures will be modified for off-site visits. List of materials and supplies that will be needed for an off-site visit.  

Lab Considerations Chain of custody for specimen transport Specimen handling/transport Safety (biological specimens, bio-waste) Testing timeframes Equipment and supplies Staffing Source Documentation Considerations for collection of specimens for transport to an outsourced and on-site laboratory: Chain of custody, for specimens to be transported from off-site visits Safety considerations, including details on how biological specimens and bio-waste will be handled and procedures to prevent and respond to specimen accidents Adhering to allowable time intervals to get specimens to testing laboratories Specimen handling and transport methods Equipment and supplies   Considerations for testing performed in an off-site location: Source documentation for test results Staffing: 2 staff members qualified in HIV rapid testing will be required to perform and review HIV testing results (if performing finger sticks). Appropriate area in off-site location to perform testing NOTE: Staff should follow the same procedures specified in SSP section 12 and site-specific SOPs in the event of a possible seroconversion (i.e. a positive rapid HIV test) identified during an off-site visit. If possible and agreed upon by the participant, sites should offer immediate transport to clinic for directed post-test counseling and sample collection for seroconversion.

Study Product Considerations Requests for VR in advance Chain of custody Transport conditions/temperature Procedures in the event study product is not delivered Collection and transport of used/unused VR Documentation Please follow MTN-025 SSP 09, Study Product Considerations, for specifications on product supply procedures for off-site visits. Requesting participant-specific study product from the pharmacy prior to the off-site visit Ensuring proper chain of custody of participant-specific study product from time of receipt from the pharmacy to time of delivery to the participant, including ensuring that participant-specific study product is delivered to the correct participant Transporting participant-specific study product at appropriate temperatures from time of receipt to time of delivery to the participant Handling/returning participant-specific study product when the participant cannot be located or refuses to receive the product dispensed for her. Handling of used and unused study product, including procedures for collection and transportation back to clinic. Documenting all of the above, and appropriately storing all documentation in either the study clinic and/or pharmacy (as per site SOP).

Source Documentation Considerations No completed CRFs or other source documents should leave clinic – including any equipment used for Medidata entry Blank CRFs and staff notes summarizing source documents may be taken No completed CRFs or other source documents should leave the study clinic. Blank CRFs and staff notes (summarizing source documents in the binder) needed to conduct the visit may be taken off-site. Rather than carry laptops or tablets for eCRF entry, site staff should travel with blank paper CRFs and enter them upon return to the site. Visit notes may be necessary to follow up on AEs/symptoms/contraceptive use documented at the last visit (system for this should be outlined in the site off-site SOP) Source Documentation and Data Management SOPs apply to off-site visit documentation and data collection/management just as they do for on-site visits

Any questions?