CONS and HL-LHC day Analysis of needs from TE-MPE

Slides:



Advertisements
Similar presentations
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
Advertisements

Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
TE-MPE-CP, RD, 09-June Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
TE-CRG Activities D. Delikaris, TE-CRG.
Status And Plans For Consolidation Of Magnet Protection Systems And Interlocks TE-MPE A. Siemko 12/09/2013 Accelerator Consolidation Workshop2.
CERN TE-MPE-EP, RD, 09-April Quench Protection Systems (QPS) for the LHC R. Denz, TE-MPE-EP Acknowledgements: K. Dahlerup-Petersen, A. Siemko, J.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
CONS and HL-LHC day Analysis of needs from TE-EPC
The Steering Board for MPE projects and its activities
CLIC work program and milestones
AFC 2017 (and 2018) AFC timeline:
2007 IEEE Nuclear Science Symposium (NSS)
CONS and HL-LHC day Analysis of needs from BE-CO
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
R. Denz, A. Gomez Alonso, AT-MEL-PM
Brief Status SPS Prototype PSB Prototype Installed in LS1
ELQA Electrical Quality Assurance
LIU Wire Scanner Milestones June 2017
The HL-LHC Circuits: Global View and Open Questions
Injector De-cabling Project
Giorgio on behalf of ELQA team
June 22, 2017 Burkhard Schmidt for the DT coordination team
Document Plan & Milestones WP7
Injectors BLM system: PS Ring installation at EYETS
Ideas and design concepts, and challenges
Looking back on 2014 and Perspectives for the MPE Group in 2015
EC Activities Status for the LIU
Powering the LHC Magnets
J. Uythoven for the MPE-MI & MS Teams
MPE main activities planned for LS2
and Electrical Integrity Group First Plenary Group Meeting 22/01/2009
Renovation of the 45-year old PS magnets
LIU, ABP-CWG, PBC, miscellaneous
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
the CERN Electrical network protection system
HL Consolidation Day Analysis of needs from BE-ICS
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Circuits description and requirements - Closed Session-
Overview & baseline of LS2 and roadmap for CRG
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Detailed global view on protection and detection of the circuits
Machine Protection System Commissioning plans
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
Radiation Working Group RADWG
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

CONS and HL-LHC day Analysis of needs from TE-MPE A. Siemko for TE/MPE CONS and HL-LHC day 26.09.2017

CONS and HL-CONS approved requests (for HL-CONS except spares) Item n. Description Approved Budget [kCHF] Funding (CONS/HL-CONS) % Budget to be allocated in the years 1 Consolidation for DYPQ (yellow racks for protection of RQ circuits) EDMS 1702068, 1643365, 1749722 2850 100% CONS 2017 - 336 2018 - 1'166 2019 - 991 2020 - 350 2 600A Energy Extraction system replacement – R&D + first 2 prototypes EDMS to be published (Link to MPE-SB) 413 2017 - 263 2018 – 150 2019 - 125 2020 - 125 3 QDS electronics consolidation EDMS 1817314 Upgrade of the IPQ and IT protection units Upgrade of 600 A prot. units and current sensors Upgrade of quench loop controllers for main circuits R&D for didt sensors Upgrade of remote power cycle units Field-bus couplers 1600 2017 – 200* 2018 - 450* 2019 - 475* 2020 - 370* 2021 - 80* A. Siemko, 26 September 2017 * Spending profile to be updated in APT/CET still (total volume unchanged)

CONS and HL-CONS approved requests (for HL-CONS except spares) Item n. Description Approved Budget [kCHF] Funding (CONS/HL-CONS) % Budget to be allocated in the years 4 13 kA EE Systems - Controls Consolidation + spare switches and arc contacts EDMS 1761582 810 100% CONS 2017 - 100 2018 - 290 2019 - 220 2020 - 200 5 Monitoring and interlocking of conical joints for the 13kA warm leads (PROJOINT) 273 2018 - 113 2019 - 100 2020 - 60 6 Spare Diode stacks (provision of additional 30+10 spare diode stacks + wafers for full sector) 315 2017 - 235 2018 - 80 7 DQHDS lifetime studies (R&D for assessment of expected lifetime, lab infrastructure for lifetime tests) 250* 2018 - 100 2019 - 50* * 200kCHF already approved, 50kCHF request for 2019 pending approval A. Siemko, 26 September 2017

CONS and HL-CONS approved requests (for HL-CONS except spares) Item n. Description Approved Budget [kCHF] Funding (CONS/HL-CONS) % Budget to be allocated in the years 8 BIS v2 for LHC ring & Injection - second generation Beam Interlock System to meet dependability requirements, upgrade optical beam permit loops, address architectural improvements, and HL-LHC specific extensions EDMS 1728892 1457 100% CONS 2017 - 46 2018 - 53 2019 - 12 2020 - 47 2021 - 200 2022 - 500 2023 - 600 9 BIS v2 for SPS ring + TL - second generation Beam Interlock System to meet dependability requirements, upgrade optical beam permit loops, address architectural improvements, and HL-LHC specific extensions 1458 2017 - 45 2018 - 52 2019 - 13 A. Siemko, 26 September 2017

CONS and HL-CONS approved requests (for HL-CONS except spares) Item n. Description Approved Budget [kCHF] Funding (CONS/HL-CONS) % Budget to be allocated in the years 10 WIC for PS – phase 1 280 100% CONS 2017 - 50 2018 - 80 2019 - 100 2020 - 50 11 WIC for TL Linac4 to PSB 115 2017 - 25 2018 – 40 2019 - 50 12 WIC for TL PSB to ISOLDE 150 2020 - 75 2021 – 75 13 WIC for TLs PSB to PS 2018 – 50 14 WIC for TT2 and nTOF 250 2017 – 60* 2018 – 97* 2019 – 88* 2020 - 5* * Spending profile to be updated in APT/CET still (total volume unchanged) A. Siemko, 26 September 2017

CONS and HL-CONS requests pending approval or refused Item n. Description Budget request [kCHF] Budget to be allocated in the years Pending Refused 1 600A Energy Extraction system Replacement of all LHC 600A Energy Extraction systems due to the end of their lifetime 5600 2019-2024 100% Awaiting for the replacement strategy 0% 2 PIC v2 – development of a second generation Powering Interlock System to meet dependability requirements, address architectural improvements and extensions of the HL-LHC magnet protection EDMS 1586576 400 2020 - 80 2021 - 220 2022 - 100 A. Siemko, 26 September 2017

CONS and HL-CONS requests pending approval Item n. Description Budget request [kCHF] Budget to be allocated in the years Pending Refused 3 WIC for North area 900 2021-2023 100% 0% 4 WIC for PS – phase 2 280 2022-2023 5 WIC for TT10 250 2022-2024 6 WIC for SPS ring 600 2020 - 2022 7 BIS v2 for PS ring + TT2 + TT10 300 2017 - 2018 100%* * Currently refused as ‘Out of scope’ A. Siemko, 26 September 2017

LHC Quench Heater Power Supplies Consolidation New request for conversion of LHC into HL-LHC LHC Quench Heater Power Supplies Consolidation TE-MPE September 2017

Introduction There are 36’000 electrolytic capacitors installed in the LHC heater power supplies that have been operative for the last 10 years charged time estimated to around 50’000 hours most of them discharged a dozen times on quench heaters Capacitors were qualified in collaboration with the Université Claude Bernard in Lyon (France) – collaboration established with this purpose and a PhD written on the subject – under the following assumptions: Chaque aimant est prévu pour subir environs 10 "quench" pendant sa durée de vie [5]. 2 tests de décharges des condensateurs seront effectués par année pour le diagnostic. Au total une moyenne par aimant de 50 décharges pendant les 20 années d’exploitation du LHC est donc prévue. Les alimentations doivent rester opérationnelles et les condensateurs chargés pendant toute cette période, c’est à dire pendant les 175000 heures de fonctionnement. Les alimentations seront exposées à des doses de rayonnement estimées entre 20Gy et 200Gy [5]  CERN, “General parameters for equipment installed in the LHC”, LHC-PM-ES-0002-00 rev.1.1, Avril 1999. A. Siemko, 26 September 2017

Introduction The future of LHC with the approved HL-LHC years of operation and beyond makes imperative to find out the remaining lifetime of the capacitors and the definition of a strategy of replacement in due time. A study has been launched This study will bring out first results not earlier than mid 2018 A similar study might have to be prepared for the thyristors within the heater power supplies – this is not yet decided when In general terms, there are two options for the consolidation of the DQHDS: Replacement of the capacitors (and possibly other weak parts of the DQHDS) Replacement of the whole DQHDS units A. Siemko, 26 September 2017

Remaining lifetime studies Tentative Schedule Milestone Description Deadline 1 Roadmap and management plan Oct 2017 2 Removal of ~ 60-100 capacitors from LHC Dec 2017 3 First comparative measurements on both spares and aged capacitors (t0) Jan 2018 4 Ageing tests (2500-3000 h) (t1) Apr 2018 5 First estimation of remaining lifetime May 2018 6a Capacitor replacement plan if needed for LS2 – no indication today for this 6b Further ageing tests Apr 2019 7 Final estimation of lifetime and capacitor replacement plan for LS3 if needed May 2019 A. Siemko, 26 September 2017

Cost estimates (I) – option a) Replacing capacitors We assume a replacement of capacitors or the whole DQHDS during LS3 Assumed: 150 CHF/ capacitor 1500 CHF / person.week (based on PJAS + overheads) 150 kCHF for capacitors qualification programme Switching OFF and disconnection of HDS in eight sectors : 25 person.week 30 minutes to replace the 6 capacitors in an HDS unit, 75 person.week of work Units tested at CERN with final capacitors in 6 test benches, 0.25 h/unit, 35 person.week of work Reconnection and switching ON of HDS in eight sectors after transport: 25 person.week Cost of capacitors: 5.4 MCHF + 540 kCHF (spares) Qualification programme: 150 kCHF Manpower: 240 kCHF + 30 kCHF (supervision) TOTAL 6.36 MCHF Not included costs: transport, storage, test benches, scraping of the old units according to environmental rules A. Siemko, 26 September 2017

Cost estimates (II) – Option b) Replacing full units We assume a replacement of the full quantity of units (6000) during LS3 Assumed: 5000 CHF / whole DQHDS unit 1500 CHF / person.week (based on PJAS + overheads) 200 kCHF for components qualification programme HDS fully tested at manufacturers’ premises Full quantity of capacitors sent to CERN – better control of storage and conditioning Functional tests at CERN in 6 test benches, 0.5 h/unit: 50 person.week Switching OFF and disconnection of old HDS in eight sectors : 25 person.week Reconnection and switching ON of new HDS in eight sectors after transport: 25 person.week 6000 DQHDS units: ~ 30 MCHF + 1.5 MCHF (spares) Manpower : ~150 kCHF Components’ qualification programme: 200 kCHF TOTAL: 31.85 MCHF Not included costs: transport, storage, test benches, scraping of the old units according to environmental rules A. Siemko, 26 September 2017

Consolidation of HDS Planning and budget profile Item n. Description Upgrade of 6000 Quench Heater Power Supplies Budget request [MCHF] Budget to be allocated in years (from-to) Priority (1-3) 1 top 3 low Option a) Replacement of 36000 capacitors 6.36 2021-2024 Option b) Replacement of 6000 complete units 31.85 Tentative budget profile: 150 kCHF/200 kCHF allotted to qualification studies and tests during the tendering phase (2021) Profiling contracts (first guess): 20% in 2022; 60% in 2023; 20% in 2024 + manpower LS3 in 2024 A. Siemko, 26 September 2017

Consolidation of HDS - Preliminary discussion So far there is no indication of any new systematic component degradation/failure (ON/OFF switches were replaced in the past) There are around 300 DQHDS spares (231 in Prevessin, 72 in the tunnel); there are no individual spares of components (with the exception of capacitors ~200) Postponing the HDS upgrade/replacement from LS3 to LS4 would mean really stretching on the lifetime of components HL-LHC will need anyhow new HDS for LS3 in the several hundred units and the R&D synergies between the two projects will be substantial Budget is the clear advantage of replacing only the capacitors (24 MCHF saving) – but this replacement might be only a partial remedy (to be further analyzed) If the results of the presently launched studies give hints of any major issue (e.g. corrosion of electrodes), a decision should be then anticipated A. Siemko, 26 September 2017

Consolidation of LHC Quench Detection Systems (nQPS) New request for conversion of LHC into HL-LHC Consolidation of LHC Quench Detection Systems (nQPS) TE-MPE September 2017

QDS Consolidation – nQPS systems nQPS systems (436 protection crates) comprise the aperture symmetric quench detection systems for the MB and MQ magnets, the bus-bar splice protection systems and the earth voltage feelers for the main circuits Installed in 2009 the maximum expected useful lifetime is 20 years, i.e. up to LS4 The radiation tolerance of the installed system being sufficient for all locations up to LS3, there might be problems in half cells 8 through 12 around IP1 and IP5 after the HL-LHC upgrade during LS3 Consolidation could focus on the most vulnerable parts, i.e. the splice protection systems only or consider a full upgrade of the concerned 20 units The technology for the upgrade can be based on the universal quench detection systems (uQDS) currently being developed for the HL-LHC upgrade Estimated cost per nQPS crate is 5000 CHF Additional required functionality like an increased number of earth voltage feelers or an upgrade of the data acquisition systems still needs to be defined A. Siemko, 26 September 2017

QDS Consolidation – resources for the upgrade of nQPS systems Item Material FTE Internal & external contributions R&D 50 kCHF 0.5 x FTE (STAFF), 1 x FTE (FELL or VIA or FTEC) TE-MPE-MS, TE-MPE-PE LS3 (20 + 2 spare units) 110 kCHF 0.5 x FTE (STAFF), 1 x FTE (TTE) TE-MPE-EM, TE-MPE-MS, BE-CO, BE-ICS LS4 (416 + 8 spare units) 2120 kCHF 1 x FTE (STAFF), 2 x FTE (TTE) TOTAL 2280 kCHF 2 x FTE (STAFF), 1 x FTE (FELL), 3 x FTE (TTE) A. Siemko, 26 September 2017

Consolidation of LHC Post Mortem System New request for conversion of LHC into HL-LHC Consolidation of LHC Post Mortem System TE-MPE September 2017

Consolidation of Post Mortem System Due to a growing number of use-cases (IQC, XPOC, SPS quality checks, Powering analysis) and the increasing data volumes from all user systems, the current architecture has reached its limits of capacity and scalability. In view of the continuous upgrades projects throughout the injector complex and the LHC, the current system needs to be replaced by a new, performant and truly scalable architecture to assure the reliable storage and analysis of accelerator transient data recordings for the HL-LHC era. Total Budget request 300 kCHF Budget to be allocated in years (from-to) 2018-2020 Material budget request 50 kCHF (proto & operational storage) Personnel available [y/n] in addition to personnel budget request y (MPE staff) Personnel budget request (M2P budget for MPAs and fellows) 250 kCHF Consequences of suppression of request Potential non-readiness of new infrastructure, requiring LS2 restart with present infrastructure. Consequences of delay of request Potentially delayed availability of the new infrastructure, which in turn would delay the start of IST and commission tests post LS2. A. Siemko, 26 September 2017

ITEM: Post Mortem Consolidation Current working hypothesis is full integration of PM consolidation with NXCALS Strong coupling/collaboration with BE-CO and facilitated access to CALS/PM data for users PM CEPH cluster to guarantee ‘real-time’ use cases for PM A. Siemko, 26 September 2017

ITEM: Post Mortem Consolidation - Roadmap A. Siemko, 26 September 2017

Consolidation items not submitted yet (undergoing internal evaluation) Item n. Description Upgrade of 6000 Quench Heater Power Supplies Budget request [MCHF] Budget to be allocated in years (from-to) Priority (1-3) 1 top 3 low 1 Consolidation of Safe Machine Parameters System (SMP v2.0) ? 2020-2024 2 Consolidation of Fast Magnet Current Monitoring System (FMCM v2.0 3 Consolidation of Current Leads Heating System (heating controllers) A. Siemko, 26 September 2017