1st FCC Infrastructure & Operation meeting

Slides:



Advertisements
Similar presentations
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Advertisements

Beam Dynamics Tutorial, L. Rivkin, EPFL & PSI, Prague, September 2014 Synchrotron radiation in LHC: spectrum and dynamics The Large Hadron Collider (LHC)
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Preliminary Studies of the Electric Power Distribution for CLIC
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
Round-table: Discussion on Future Machines. With the discovery of the Higgs Boson Self-consistent model (SM) accounting for all Particle Physics phenomena.
The FCC Magnet Program: Challenges and Opportunities for HTS
Understand the Present to Master the Future Johannes Gutleber Future Circular Collider.
Future Accelerators at the High Energy Frontier
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
1 Tunnel implementations (laser straight) Central Injector complex.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Accelerator Group for LHeC LHeC Meeting at CERN; October Questions raised by Max  does the e-ring fit into the tunnel?  can one bypass ATLAS and.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
Review of FCC tunnel footprint & implementation Outcome & conclusions Austin Ball, Paul Collier, Massimo Giovannozzi Philippe Lebrun (chair), Lluis Miralles,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
30 April 2014FCC-ee Physics Coordination meeting1 WELCOME to the 1st coordination meeting «Experiments at the FCC-ee» Within the FCC-ee DESIGN STUDY.
Accelerator and Technology sector organization from January, 1st, 2014 Frédérick Bordry 18 th November 2013.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
Review of FCC tunnel footprint & implementation Introduction & scope Philippe Lebrun Review of FCC tunnel footprint & implementation CERN, 11 June 2015.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement High Efficiency Work.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Outcome of the FCC Week 2015 Input for work program in the second year of the study Ph. Lebrun FCC Infrastructure & Operation Meeting 22 April 2015.
FCC Infrastructure & Operation studies: outcome of the kick-off meeting and work program Ph. Lebrun & P. Collier 2 nd FCC Infrastructure & Operation meeting.
Energy consumption and savings potential of CLIC Philippe Lebrun CERN, Geneva, Switzerland 55th ICFA Advanced Beam Dynamics Workshop on High Luminosity.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Please check out: K. Ohmi et al., IPAC2014, THPRI003 & THPRI004 A. Bogomyagkov, E. Levichev, P. Piminov, IPAC2014, THPRI008 Work in progress FCC-ee accelerator.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
Review of FCC tunnel footprint & implementation Outcome & conclusions Austin Ball, Paul Collier, Massimo Giovannozzi Philippe Lebrun (chair), Lluis Miralles,
FCC-ee Interaction Region design
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Installation Global System
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
TC activities.
CLIC Civil Engineering & Infrastructure Working Group Meeting
The HL-LHC Circuits: Global View and Open Questions
Innovative He cycle Francois Millet.
Input to Strategy currently planned
FCC summary report March 2015 Washington.
Future Circular Collider
CLIC / ILC Collaboration for CFS works
Perspective on future challenges for very high energy hadron colliders
Accelerator and Experiment Interface Session: LS2, LS3
Collaboration New collaborators in 2016:
CLIC: from 380 GeV up to 3 TeV Will also study klystron based machine for initial stage.
Preparation of FCC Week 2018 (programme, attendance)
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
COOLING & VENTILATION INFRASTRUCTURE
Future Collider Projects at CERN
Why are particle accelerators so inefficient?
LCWS 2017 – 26th October C. Rossi
CLIC Civil Engineering Update
The Fermi National Accelerator Laboratory is a U. S
Advanced Research Electron Accelerator Laboratory
MEIC New Baseline: Luminosity Performance and Upgrade Path
Presentation transcript:

1st FCC Infrastructure & Operation meeting FCC Infrastructure & Operation studies: objectives, work program, organization Ph. Lebrun & P. Collier 1st FCC Infrastructure & Operation meeting CERN, 22 January 2014

European Strategy Update on Particle Physics Design studies and R&D at the energy frontier “CERN should undertake design studies for accelerator projects in a global context, with emphasis on proton-proton and electron-positron high-energy frontier machines. These design studies should be coupled to a vigorous accelerator R&D programme, including high-field magnets and high-gradient accelerating structures, in collaboration with national institutes, laboratories and universities worldwide” HFM HGA Ph. Lebrun & P. Collier FCC I&O meeting, 140122

CLIC CDR and cost study (2012) 3 volumes: physics & detectors, accelerator complex, strategy, cost & schedule Collaborative effort: 40+ institutes worldwide Ph. Lebrun & P. Collier FCC I&O meeting, 140122

The Future Circular Colliders (FCC) design study Aiming for CDR and Cost Review for the next ESU (2018) 80-100 km tunnel infrastructure in Geneva area design driven by pp-collider requirements with possibility of e+-e- (TLEP) and p-e (VLHeC) CERN-hosted study performed in international collaboration 16 T  100 TeV in 100 km 20 T  100 TeV in 80 km Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Structure of FCC study Leader Michael Benedikt, Deputy Frank Zimmermann Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Main areas of FCC design study Preparatory Group Ph. Lebrun & P. Collier FCC I&O meeting, 140122

WBS of FCC Study Ph. Lebrun & P. Collier FCC I&O meeting, 140122

WBS of FCC I&O Study Action 1 [participants]: indicate/confirm names of I&O WP leaders for FCC study Action 2 [WP leaders]: define “principal actors” for FCC I&O WPs  access rights, documentation Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Civil Engineering WBS Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Technical Infrastructure WBS Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Operation & Energy Efficiency WBS Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Integration WBS Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Computing & Data Services WBS Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Safety & Environment WBS Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Some top-level questions with impact on infrastructure Collision energy, circumference, bending field, accelerating gradient Injection energy & injectors Number of experimental areas Luminosity, intensity, emittance, beta star, pileup Luminosity lifetime and optimization (topping-up?) Operation at beam-beam limit? Limit on stored energy per beam? Synchrotron radiation: limit on total power? on power per unit length? allowed swing in beam energy along arcs? Installation techniques and schedule … Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Issues in civil engineering Circumference of tunnel (trade-off with field in bending magnets) Geometry of tunnel (quasi-circular, quasi race-track) Footprint of tunnel (geology, geography, built environment, access) A second campus? Number & configuration of interaction points Long straight sections Depth/slope of tunnel Access shafts/ramps Maximum distance between access points, i.e. length of «sector» Generic requirements of technical area at access point Service tunnel and/or equipment (klystron) galleries? Diameter(s) of tunnel(s) … Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Issues in electrical distribution Installed power Existing HV transport network, lines, sub-stations Normal, emergency and no-break networks Staging of voltages in distribution networks Above-ground or in-tunnel distribution Redundancy of network and components («hot» spares) … Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Issues in cooling and ventilation Cooling water: Heat loads, temperatures Primary and secondary circuits Open/closed-circuit aerorefrigerants Basic architecture Chilled water Tunnel ventilation Ventilation scheme Normal, standby and emergency modes Heat loads, flow-rates, temperatures, humidity … Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Issues in operation & energy Reliability & availability Accessibility & serviceability Co- or alternate operation of hadron and lepton colliders Electrical power drivers & efficiency Power consumption in different modes Yearly energy consumption Options for heat recovery and valorization … Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Issues in safety & environment Underground access and egress Managing beam stored energy Managing stored energy in magnet strings Helium discharge, recovery and ODH Managing effluents Radiation protection Radiation tolerance of equipment Radiation monitoring Environmental impacts: construction, operation, dismantling … Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Issues in cost & schedule Cost drivers Cost-performance trade-offs Cost scaling from LHC experience Schedule drivers Co-activities and parallel fronts in underground works Experiments vs machine construction schedules … Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Phases of the FCC study Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Phases of the FCC study Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Phase 1: Explore Understand Functional relations between different systems Basic scaling laws governing technical feasibility, capex, construction & installation schedules, operability and opex Explore and iterate Alternative designs Conventional vs non-conventional approaches Paths towards globally optimized solutions Deliver Baseline solutions, possibly with variants, for detailed study in Phase 2 Action 3 [WP leaders]: produce work program and corresponding resource estimate for 2014 Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Resources for the FCC study in 2014 First attempt at an estimate, presented to Department Heads end 2013 To be refined by technical system owners once work program is defined Allocation to be confirmed by management Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Action 4 [WP leaders]: identify possible collaborations in I&O Next milestone https://indico.cern.ch/conferenceDisplay.py?ovw=True&confId=282344 The scope of this meeting is to discuss the main study topics to prepare the groundwork for the establishment of international collaborations and future studies Action 4 [WP leaders]: identify possible collaborations in I&O Ph. Lebrun & P. Collier FCC I&O meeting, 140122

Infrastructure and Operation meetings Purposes Information on advancement of study and parameter definition [PhL & PC] Interface management between parameters, layout and technical systems Reporting of progress in I&O [System owners] Co-chaired by PhL & PC Attended by I&O system owners Monthly frequency Time slot: Wednesday morning, 10h-12h Indico agenda and working document repository Minutes? Next meeting: Wednesday 26 February 10h00 Ph. Lebrun & P. Collier FCC I&O meeting, 140122