LHCOPN update Brookhaven, 4th of April 2017

Slides:



Advertisements
Similar presentations
Exporting Raw/ESD data from Tier-0 Tier-1s Wrap-up.
Advertisements

KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Steinbuch Centre for Computing (SCC)
T1 at LBL/NERSC/OAK RIDGE General principles. RAW data flow T0 disk buffer DAQ & HLT CERN Tape AliEn FC Raw data Condition & Calibration & data DB disk.
Trial of the Infinera PXM Guy Roberts, Mian Usman.
CERN IT Department CH-1211 Geneva 23 Switzerland t T0 report WLCG operations Workshop Barcelona, 07/07/2014 Maite Barroso, CERN IT.
Efi.uchicago.edu ci.uchicago.edu FAX status report Ilija Vukotic Computation and Enrico Fermi Institutes University of Chicago US ATLAS Computing Integration.
Status of WLCG Tier-0 Maite Barroso, CERN-IT With input from T0 service managers Grid Deployment Board 9 April Apr-2014 Maite Barroso Lopez (at)
Site report: Tokyo Tomoaki Nakamura ICEPP, The University of Tokyo 2014/12/10Tomoaki Nakamura1.
A short introduction to the Worldwide LHC Computing Grid Maarten Litmaath (CERN)
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) WLCG GDB, CERN 8 July 2015.
HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald Steven McDonald TRIUMF Network & Computing Services Canada’s National Laboratory.
WLCG Service Report ~~~ WLCG Management Board, 24 th November
Connect communicate collaborate LHCONE L3VPN Status Update Mian Usman LHCONE Meeting Rome 28 th – 29 th Aprils 2014.
INFN TIER1 (IT-INFN-CNAF) “Concerns from sites” Session LHC OPN/ONE “Networking for WLCG” Workshop CERN, Stefano Zani
Connect. Communicate. Collaborate perfSONAR MDM Service for LHC OPN Loukik Kudarimoti DANTE.
The ATLAS Cloud Model Simone Campana. LCG sites and ATLAS sites LCG counts almost 200 sites. –Almost all of them support the ATLAS VO. –The ATLAS production.
A follow-up on network projects 10/29/2013 HEPiX Fall Co-authors:
Eygene Ryabinkin, on behalf of KI and JINR Grid teams Russian Tier-1 status report May 9th 2014, WLCG Overview Board meeting.
Connect communicate collaborate LHCONE European design & implementation Roberto Sabatino, DANTE LHCONE Meeting, Washington, June
Connect. Communicate. Collaborate LHCOPN lambda and fibre routing – Episode 3 Michael Enrico Network Engineering & Planning Manager DANTE LHC Meeting,
M.C. Vetterli – WLCG-CB, March ’09 – #1 Simon Fraser WLCG Collaboration Board Meeting Praha, March 22 nd, 2009 Thanks to Milos for hosting us.
IT-INFN-CNAF Status Update LHC-OPN Meeting INFN CNAF, December 2009 Stefano Zani 10/11/2009Stefano Zani INFN CNAF (TIER1 Staff)1.
LHC-OPN operations Roberto Sabatino LHC T0/T1 networking meeting Amsterdam, 31 January 2006.
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
Efi.uchicago.edu ci.uchicago.edu FAX status report Ilija Vukotic on behalf of the atlas-adc-federated-xrootd working group Computation and Enrico Fermi.
T0-T1 Networking Meeting 16th June Meeting
Network evolving 2020 and beyond
Network activities update ALICE workshop 4th of May 2017 edoardo
LHCOPN lambda and fibre routing Episode 4 (the path to resilience…)
LHC[OPN/ONE]  IPv6  status
LHCOPN/LHCONE status report pre-GDB on Networking CERN, Switzerland 10th January 2017
DE-KIT(GridKa) -- LHCONE
Ian Bird WLCG Workshop San Francisco, 8th October 2016
“A Data Movement Service for the LHC”
Helge Meinhard, CERN-IT Grid Deployment Board 04-Nov-2015
LHCONE status and future
GÉANT LHCONE Update Mian Usman Network Architect
The LHC Computing Environment
LHCOPN/ONE meeting BNL 4-5 of April 2017 summary report GDB 12th of April 2017
2nd Asia Tier Centre Forum Summary report 4th April 2017 edoardo
Report from WLCG Workshop 2017: WLCG Network Requirements GDB - CERN 12th of July 2017
Status Report on LHC_2 : ATLAS computing
INFN Computing infrastructure - Workload management at the Tier-1
Plans to support IPv6-only CPU on WLCG
LCG France Network Infrastructures
INFN CNAF TIER1 and TIER-X network infrastructure
Project Status Report Computing Resource Review Board Ian Bird
Dagmar Adamova, NPI AS CR Prague/Rez
Support for IPv6-only CPU – an update from the HEPiX IPv6 WG
Venue and Participants
LHCONE L3VPN Status update Mian Usman LHCOPN-LHCONE meeting
Deployment of IPv6-only CPU on WLCG – an update from the HEPiX IPv6 WG
~~~ LCG-LHCC Referees Meeting, 16th February 2010
Update from the HEPiX IPv6 WG
Deployment of IPv6-only CPU on WLCG – an update from the HEPiX IPv6 WG
Venue and Participants
LHCONE In Europe Mian Usman DANTE.
How to address the increasing connectivity needs of the HEP community?
3rd Asia Tier Centre Forum Summary report LHCONE meeting in Tsukuba 17th October 2017
KISTI Daejeon, 23rd September 2015
Summary from last MB “The MB agreed that a detailed deployment plan and a realistic time scale are required for deploying glexec with setuid mode at WLCG.
Project Status Report Computing Resource Review Board Ian Bird
Project: COMP_01 R&D for ATLAS Grid computing
K. Schauerhammer, K. Ullmann (DFN)
Tony Cass, Edoardo Martelli
LHC Data Analysis using a worldwide computing grid
an overlay network with added resources
LHC plans for LS2 and beyond
MB Maarten Litmaath CERN v1.0
IPv6 update Duncan Rand Imperial College London
Presentation transcript:

LHCOPN update Brookhaven, 4th of April 2017 edoardo.martelli@cern.ch

Latest news CA-TRIUMF - Will move from TRIUMF to SFU (Simon Fraser University) - Existing T1 will be dismantled by 2020 - Connectivity to SFU being set up now UK-T1-RAL - Activated IPv6 peerings - 3rd 10G link RAL-CERN being provisioned

Latest news IT-INFN-CNAF - new core network devices deployed FR-CCIN2P3 - separated IPv4 and IPv6 traffic on single-stack VLANs

Latest news [Input from Tier1s in the audience]

LHCOPN map ES-PIC CA-TRIUMF US-T1-BNL TW-ASGC US-FNAL-CMS KR-KISTI █ █ █ CA-TRIUMF AS36391 █ US-T1-BNL AS43 █ TW-ASGC AS24167 █ █ US-FNAL-CMS AS3152 █ KR-KISTI AS17579 █ RRC-KI-T1 AS59624 █ █ █ CH-CERN AS 513 █ █ █ █ UK-T1-RAL AS43475 █ █ █ █ RRC-JINR-T1 AS2875 █ NDGF AS39590 █ █ FR-CCIN2P3 AS789 █ █ █ █ NL-T1 AS1162, 1104 █ █ █ DE-KIT AS58069 █ █ █ █ IT-INFN-CNAF AS137 █ █ █ █ T0-T1 and T1-T1 traffic 10Gbps T1-T1 traffic only 20Gbps 40Gbps █ = Alice █ = Atlas █ = CMS █ = LHCb edoardo.martelli@cern.ch 20161010 100Gbps

Latest news CH-CERN - Wigner remote data-centre: - added 3rd 100G link Geneva-Budapest - re-configured network to increase local capacity - Construction works for 2nd network hub almost completed. It will be used for business continuity. Installation of network devices will start in the summer - On-going tender for new datacentre routers - Evaluating construction of new datacentre on the French Site (Prevessin) for shared DAQ

CERN data centres setup

3rd 100G Geneva-Budapest link T-Systems – GEANT#1 - GEANT#2

Experiments’ shared DAQ Cloud resources T0-T1s network T1s-T2s network Internet Up to 40 Tbps DAQ lines = = = = = = = = = = = Prevessin DC Shared DAQ - Offline Geneva DC Computing-Storage Wigner DC Extra capacity CMS Not existing today Construction under evaluation ALICE ATLAS LHCb

LHC Schedule 2017 Q1-Q2 Here today https://beams.web.cern.ch/sites/beams.web.cern.ch/files/schedules/LHC_Schedule_2017.pdf

LHC Schedule 2017 Q3-Q4 https://beams.web.cern.ch/sites/beams.web.cern.ch/files/schedules/LHC_Schedule_2017.pdf

Draft LHC Schedule 2018 https://lhc-commissioning.web.cern.ch/lhc-commissioning/schedule/2018-LHC-schedule_v0.3.pdf

Long term planning https://lhc-commissioning.web.cern.ch/lhc-commissioning/schedule/LHC-long-term.htm https://lhc-commissioning.web.cern.ch/lhc-commissioning/schedule/LHC%20schedule%20beyond%20LS1%20MTP%202015_Freddy_June2015.pdf

HL-LHC plan LS2 (Long Shutdown #2) Perform major maintenance and consolidation Increase injector reliability and lifetime to cover HL-LHC run until ~2035 Increase intensity in the injectors to match HL-LHC requirements Anticipate HL-LHC work

LHCOPN traffic – last year

CERN traffic – last 12 months Average bandwidth increased of ~80% compared to previous year

Questions? edoardo.martelli@cern.ch