Important Reminder from Yesterday Infrastructure requirements for ODINAFRICA installations
Infrastructure needed includes A weather proof tide gauge hut for electronics 24 hour security Electricity Tools for installation (I have a list) A mounting arm for the radar gauge Mountings for the pressure sensors (one below low tide and one at approximately MSL) A pole for antennas A simple stilling well for calibration checks
Infrastructure needed Note that technical details will be discussed by Peter Foden and Ruth Farre later in the week with everyone Discussed Wednesday with Mauritania, Cameroon, Congo, Ghana in detail.
As used at Pemba
Drawings for several types of arms are on PSMSL web site – see me if questions www.pol.ac.uk/psmsl/gauge_experiences/ There are weeks to go before installations in the first 4 ODINAFRICA stations. These infrastructure things must be ready!