EFRTC GENERAL MEETING Ny Tiana TOURNIER

Slides:



Advertisements
Similar presentations
IRSC October Denver, USA 1 Europe: an open space for rolling stock?
Advertisements

Cross-Acceptance: UNIFE expectations Alice Polo Safety and Certification Manager.
OTM TASK FORCE EFRTC General Meeting Sofia, Markus Hofmann, EFRTC OTM Task Force Chairman Franz Messerli, UNIFE OTM Task Force Vice-Chairman.
Union Internationale des Wagons Privés Internationale Privatwagen-Union International Union of Private Wagons EU Workshop - October 20, 2006 Presentation.
Reference Document Management 1 European Railway Agency (ERA) Cross-Acceptance Unit P. Mihm 17/11/2010.
The Future – the “Roadmap” SIMPLIFICATION. The Road Map 2 TSI in Place Hi Speed Conv Loc & pass Off TENS TSI Conformity New Vehicles Networks Open pointsUpdates.
1 8 July 2010 Cross – Acceptance and Safety Ralf Schweinsberg Vice-President Eisenbahn-Bundesamt UNECE Group of Experts on Unified Railway Law Secon Session;
OTM TASK FORCE Draft final report Markus Hofmann OTM Task Force Chairman EFRTC General Meeting Prague, 22 nd June 2012.
Results of the EC Task Force on national safety rules (NSR) Caroline Fischer Safety Unit 23 January th meeting of the RISCN° 1.
European Commission / Taxation and Customs Union ICS presentation 29 May 2008 updated 1 Import Control System (ICS) Presentation for representatives.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
BEWAG (UIP) General assembly European Railway Agency Jean-Marie DECHAMPS, Head of Sector (Safety) Brussels, 27 April 2015.
Lille, 17th November 2010 Ernest GODWARD The Report on Vehicle Authorisation - Costs and Complexities.
Experiences and lessons learned from essential use nominations in Article 2 Parties: European Community perspective Dr. Philippe Tulkens European Commission,
1 December 2010 NSA Belgium. 1 December 2010NSA Belgium - Michel Lambermont Constructing, modifying and changing the assignment of wagons.
UIC ERTMS World Conference Certification and Assessment of GSM-R Begoña DOMINGO, GSM-R Project Officer Istanbul, 3/04/2014.
TSI WAGONS (321/2013) modifications BEWAG 27/04/2015.
The 4 th Railway Package: Impact for the keepers Clio Liégeois.
European Railway Safety Strategy EIM Safety Group (PhGALLEY and J-Å HALLDEN) 29 september 2009.
Recommendation 2014/897/EC (DV29bis) Key Principles.
RE-E / IRSC / 27/09/ /10/09 1 The necessary evolution of railway safety regulations in Europe A challenge – Risks to be controlled.
Safety, Interoperability, Passenger Rights and Rail Regulation Page Facing the Challenge: Cleaning up the National Vehicle Rules.
1 Standardisation, Assessment, and Certification Legal Framework, Standards  Measurement Instrument Directive (2004/22/EC)  Interoperability Directive.
Twinning Project No 00MAC01/02/006: Approximation of Legislation to the Internal Market Acquis An EU-funded project managed by the European Agency for.
General Meeting Florence Secretary General report on Items 5 of the agenda Imrich KORPANEC.
European Aviation Safety Agency Head of Aircraft Product Certification
EMTA General Meeting Prague May 2012 Round table on PSO Regulation 1370/2007 “Two years after enforcement, where are we? How efficient is the regulation?
General Meeting Zurich Markus HOFMANN Chairman of OTM Task Force On Track Machine (OTM) autorisation and x-acceptance.
Safety Objectives of European Railway Agency Raigo Uukkivi Estonian Railway Inspectorate DAGOB Final Conference , Tallinn.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
Workshop accreditation and recognition / conformity assessment Removing Technical Barriers - TSIs within New Approach and Safety Directive Dr.-Ing. Andreas.
Revised Directive 2005/36/EC Nurses responsible for general care
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 14 – Air Transport Bilateral screening:
Module 02 Essential Requirements for ATCOs. Training Objectives  Appreciate the content of the essential requirements for ATCOs as described within EASA.
1 Package on food improvement agents Food additives Food enzymes Flavourings Common procedure Developments since earlier consultation.
Public Procurement Agency - Bulgaria
EU rules for Third Country operators ??
TRANSPORT SCIENCE: INNOVATIVE BUSINESS SOLUTIONS
A Single European Railway Area :
Europe: an open space for rolling stock?
European Rail Infrastructure Managers
NAB/RB Training Workshop In Valenciennes, April 2016
Maria Price, DPhil. (Oxon.) Head of EU Policies and Public Affairs
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
4th Railway Package – Implementation of the Technical Pillar
Exchange of information between Member States
Attestation Concept additional explanation and implementation proposal
Regulation (EU) No 2015/1136 on CSM Design Targets (CSM-DT)
Session II: System authority for ERTMS 4RP Trackside approval
15-16 November 2017 Valenciennes, Cité des Congrès
Pavel Kodym Interoperability expert
Network/route compatibility
ERA Seminar Cross Acceptance Ad hoc Summary
Pega 9/14/2018 8:48 AM Definition of Done = ready for PO acceptance
EU legislation on Personal Protective Equipment (PPE)
ERTMS Conference 4RP VA Authorisation
Ex-ante conditionality – General guidance
Setting Actuarial Standards
Meeting of the WG on Rail Transport Statistics 2-3 April 2009
Dan Tofan | Expert in NIS 21st Art. 13a WG| LISBON |
INSPIRE Maintenance and Implementation expert Group
Bernhard Berger, Marco Paviotti DG Environment, European Commission
Taking forward the common understanding of Art. 8, 9 and 10 MSFD
USNRC IRRS TRAINING Lecture18
Institutional changes The role of Bilateral Oversight Boards
Water Framework Directive 2000/60/EC
International Whole Vehicle Type Approval
Fourth Railway Package Technical Pillar Hearing at the European Parliament, Brussels 7 May 2013 José GORTAZAR Chief Technical Officer, CAF.
Integration of 1520/1524 requirements. Progress report.
4RP – authorization of wagons
Presentation transcript:

EFRTC GENERAL MEETING Ny Tiana TOURNIER 11.06.2010 EFRTC General Meeting

Content Current EU processes Future EU processes Particular case of OTM EFRTC General Meeting 11.06.2010

1 - Current authorisation processes for placing vehicles in service in EU MSs 11.06.2010 EFRTC General Meeting

A transition phase Most MS have implemented partially the Directives either in force or to be transposed The technical rules used for vehicles Placing In Service (PIS) differs Difficulty to establish equivalence Cross-Acceptance agreements settled between Member States (MSs)/National Safety Authorities (NSAs) apply 11/06/2010 EFRTC General Meeting

Some figures With NSAs on the current state of play including figures on vehicles PIS (2004 to 2009) Different processes  Number of interfaces vary from 12 to 57 Increase of the number of vehicles PIS (2004 to 2009) Very low number of vehicles authorised per type Wagons Loco Passenger Fixed formation trains New Existing 69 157 7 12 17 19 22 27 11/06/2010 EFRTC General Meeting

Need for better understanding of some Directive requirements: Identified issues Need for better understanding of some Directive requirements: Scope of authorisation Extent of modification requiring a new PIS Independence criteria of checking bodies NSA involvement in the process Vehicle type definition Handling of grandfather rights 11/06/2010 EFRTC General Meeting

Management of the transition phase: Identified issues Management of the transition phase: Consistent and workable national legal frameworks Evolution of the existing cross-acceptance agreements Practical issues: Use of several languages for cross-border vehicles Disparity of rules requires the applicant/manufacturer to adjust each time 11/06/2010 EFRTC General Meeting

2- Future authorisation processes for vehicles placing in service in EU MSs 11/06/2010 EFRTC General Meeting

Transposition of Directive 2008/57 Deadline: 19/07/2010 Not all MS will be in time but are working on Better definition of the authorisation processes: Subsystem & vehicle authorisation Type authorisation 1st authorisation Additional authorisation Cross-acceptance (XA) 11/06/2010 EFRTC General Meeting

Pre-requisite to avoid inconsistent implementations by the MS Common understanding Pre-requisite to avoid inconsistent implementations by the MS Transparency of rules necessary for all actors First version of the Reference Document end 2010 Second version mid-2011 Current XA agreements will evolve towards the reference document 11/06/2010 EFRTC General Meeting

3- Particular case of authorisation of OTM 11/06/2010 EFRTC General Meeting

Transport mode On site Legal base before 19/07/2010 NoBo1 NoBo2 CR Interoperability Directive 2001/16 TSIs Recast Machinery Directive 2006/42/EC NRs NoBo1 NoBo2 11/06/2010 EFRTC General Meeting

NRs or NRs + in force TSIs Moving from today to 19/07/2010 ‘’ OTM under the scope of CR Interoperability Directive but is not the first priority’’ ? ‘’OTM may be included in the scope of Interoperability Directive’’ ≠ NRs or NRs + in force TSIs Art 23.1 of Dir. 2008/57 +Amended WAG TSI 2009/107/EC for hauled OTM 11/06/2010 EFRTC General Meeting

Non-mandatory until the next revision of the LOC PASS TSI Within ~ 3 to 5 years Annex C specifies requirements for OTM both Self propelling and hauled vehicles Entry into force of LOC PASS TSI Non-mandatory until the next revision of the LOC PASS TSI 11/06/2010 EFRTC General Meeting

Contact: nytiana.tournier@era.europa.eu 11/06/2010 EFRTC General Meeting