SiteManager/FieldManager Interface

Slides:



Advertisements
Similar presentations
Leveraging an Integrated ERP and CRM System - Featuring Sage MAS 500 ERP and Sage SalesLogix CRM.
Advertisements

Trns•port SiteManager Materials Management and LIMS Presentation
IOWAS SITE TIME ENHANCEMENT Almost every contract let by I.D.O.T. has working day charges Currently the working day charge is done in the FM program Iowa.
Web Trnsport Implementation TEA/TUG October 1-9, 2008 Saratoga Springs, NY.
What’s New in GE Part 1 (AR, AP, PO, Job Cost Presented by: Derek Kratz.
SITEMANAGER Frances J. Hood, P.E. Design/Materials/Construction Engineer Idaho Transportation Department.
1 Atlas Financials Upgrade RBEC OM workshop Part 3 13 October 2008.
FieldNet 2.0a Joe Bruewer Michigan Department of Transportation 2005 AASHTO TUG Field Management TAG Daytona Beach, Florida.
Road and Bridge Contractor use of FieldManager in Michigan 2004 AASHTO TUG Mobile, Alabama Cliff Farr - Michigan DOT October 15, 2004.
SiteManager Implementation Oklahoma Department of Transportation Charles Thurmon.
MyFloridaMarketPlace Roundtable August 20, 2003 MyFloridaMarketPlace.
Enhancements in Pre-Construction, Construction and Field Products presented by: Cindy Bass, Brad Parks & Chad Schafer Info Tech, Inc.
FieldNet 2.0a Joe Bruewer Michigan Department of Transportation 2004 AASHTO TUG Mobile, Alabama.
Agency Implementation Guide Walkthrough Session Refund of Appropriations & Revenue Receipts September 21, 2009.
WisDOT use of FieldManager ® Suite David Castleberg, PE Wisconsin Department of Transportation Bureau of Project Development Field Management TAG, October.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
TUG Chair Report Report for the Fiscal Year of 1999.
PeopleSoft Financials Maintenance Pack-13 & 14 Cumulative Feature Overview.
Cost Estimation System CES Implementation at NDOR TUG 2006.
Monitoring Information System Greece Working Group Meeting Brussels, June 2000 STRUCTURAL FUNDS
TEAM Enhancements 2003 Project Work Plan. Application Enhancements Ten application enhancements were selected as the most critical for completion in FY.
WebScan Change Order. WebScan change order: What is it? Beginning in 2010 changes to a WebScan order will need to be submitted via a WebScan change order.
Master Data Management & Microsoft Master Data Services Presented By: Jeff Prom Data Architect MCTS - Business Intelligence (2008), Admin (2008), Developer.
SiteManager Implementation Challenges “Getting Connected” Joseph J. Bouchey SiteManager Administrator Office Of Construction Conn. Dept. of Transportation.
Agency Bulkload Planning and Design Overview of the Implementation Timeline, Agency Implementation Guide & PeopleSoft Bulkload Formats August 12, 2009.
FieldNet 2.x Enhancement TUG – September 8, 2003 Andres Marin, Info Tech Inc.
Next Generation Trnsport Impact Assessment Sub-project Jim Johnson, Florida DOT and Pamela Barry, Info Tech, Inc.
1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN.
OFFICE OF FINANCIAL MANAGEMENT 0 Office of Financial Management Office of Financial Management BASS Budget Officers May 1, 2002.
Invoice Reconciliation Focus Group January 26, 2006 MyFloridaMarketPlace.
3 Copyright © 2013, Oracle and/or its affiliates. All rights reserved. PeopleSoft General Ledger 9.2 New Features 9.2 Release New Features.
AASHTO Trns port TM SiteManager TM and Estimating 1998 TEA October 27, 1998 Portland, Maine.
Standard Operating Procedure
Software Configuration Management
New Features and Functions
Figure 9.8 User Evaluation Form
Orion Microsystems, Inc. Grant Reporting System
FMSuite Open Documents Analysis/Review FMSuite Team James Mason - PM
Status Update of AMWG Change Requests As of February 15, 2016
Presentation For.
FEDMALL Overview May 2017.
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Program Management Portal (PgMP): What’s New in Release 16.1
Integrity - Service - Innovation
PeopleSoft Grants Module: Key Features
Wide Area Workflow (WAWF) Overview
Updates on U.S. Spending Transparency Improvements
Project Accounting in Microsoft Dynamics SL | Time & Expense.
Amendment Invoice Task Force Progress Report
IS&T Project Reviews September 9, 2004.
April 2005 RMS Center – Apple Valley, CA
Two-Year Budgeting Workshop
Executive Steering Committee Meeting May 6, 2009
NetSuite’s Value Propositions
Department of Licensing HP 3000 Replatforming Project Closeout Report
Lessons from the Front Lines: Streamlining Grants Management
William Delansky Cargo Control & Release, ACE Business Office
Software Requirements Review PMO - Provide COR Information to Vendors
DRG Implementation Overview
Linen Management.
DSC Governance Sub Group Recommendations
Quick reference: entering a requisition In escape RECEIVING AN ITEM
Amendment Invoice Task Force Progress Report
Best Practices w/ Q&A Session
MyFloridaMarketPlace Change Review Board (CRB)
ESS and Workflow Cale Tanguay and Jodi Dare.
Dragonfly Initiation and Planning Request
Executive Sponsor: Rick Padilla-State Maintenance Bureau Chief
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Project.
Presentation transcript:

SiteManager/FieldManager Interface TUG – September 8, 2003 Andres Marin, Info Tech Inc.

Agenda Review project objectives Overview of interface data flow process Review impact to FM and SM users Review project status Recommendations for future enhancements

Project Objectives For agencies using SiteManager (SM): Provide ability to implement FieldManager in local agencies and in the consultant community Provide flexibility in managing contracts and provide another option for field data collection For agencies using FieldManager (FM): Lay groundwork for agencies to migrate from CAS in the Central Office to SM Provide additional capabilities to manage contracts and materials in the central office Provide foundation for possible convergence of SM and FM in the future

SiteManager/FieldManager Data Flow - Overview

SiteManager/FieldManager Data Flow Examples Step Process Data Flow Examples 1 Populate FM Critical Date on SM.& Export Reference Data from SM Vendor List, Code List, Materials List, Material Item List. 2 Export Contract Data from SM. Award data; Bit Items; Site Information 3 Periodic Updates from FM (at estimate time): - Dates & Milestones - Contract Modifications Installed Work - Estimates - Notice to proceed data - New items, Increased / Decreased Items - Pay Items, Time Charges, Stock Piles Balances 4 Upon approval of Estimate in SM: Contract Refresh Estimate item detail including adjustments (Retainage, liquidated damages, etc.)

Changes in FieldManager for SiteManager Contracts Very little noticeable differences Using same business rules as a CAS “Interactive Contract” Voucher numbers locked to be same as estimate number in SiteManager Combine outbox updates to account for new file types

Changes in SiteManager for FieldManager Contracts Very little noticeable differences Procedural rules rather than hard-edits in SiteManager GUI E.g., the user should not use the SM GUI to insert inspector reports (DWRs), only receive these via FM, but the GUI does not prohibit this Estimate Generation – dates are fixed Contract Critical Dates – new critical date (only used for FM contracts) Two new extract processes (use RTF) and one new import process (uses the TP Generalized Importer).

Project Schedule Status

Overall Project Status Alpha Testing currently in-progress On schedule for completion by 10/1/2003 Beta Testing to begin 10/20/2003 Nebraska (SM beta site) Maine (FM beta site) Next TRT #4 scheduled for 10/29/2003 Beta Testing Process Review Project is on schedule and within budget

Future Recommendations for FieldManager/SiteManager Interface Automate work flows via “TrnsNet” implementation leveraging FieldNet Enhancements Improve consistency of business rules among CAS and SM where applicable Enhance validation and process controls in SM for FM contracts