How user feedback and requirements drive service evolution

Slides:



Advertisements
Similar presentations
2012 Report TT-Warn What has been accomplished. 2 TT-warn members at their FMI meeting October oktober Frank Kroonenberg (KNMI) Mats Johansson.
Advertisements

SPA : Traceable quality assurance system for multi-decadal ECVs FP7-SPACE Project No May 2013 Q A 4 E C V Quality Assurance.
Inputs from the PROMOTE/MACC projects Laurence Rouïl (INERIS)
COST ES0602: Towards a European Network on Chemical Weather Forecasting and Information Systems.
Regional Stakeholders’ Dialogue Communication and Advocacy Initiatives 3 September 2008 Francis Hale.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
ECMWF's activities in atmospheric composition and climate monitoring
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
Agricultural Market Information System (AMIS): State of Play AMIS First Meeting of the Rapid Response Forum 11 April 2012 Mexico City Abdolreza Abbassian,
Coordination Group for Meteorological Satellites - CGMS Climate Monitoring Architecture: Status and way forward Presented to CGMS-41 plenary session.
MACC: Status and Plans. Over the past year Have continued running near-real-time and delayed-mode global streams and near-real-time ensemble regional.
MyOcean2 First Annual Meeting – April 2013 Answer to users’ needs in service definition and evolution Dominique Obaton, Vincent Claverie WP2 MyOcean2.
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
Regional Node Northern Africa - Middle East - Europe (SDSWAS NA-ME-E) Summary of Activities since last RSG meeting, November 2008, Tunis Michael Schulz.
An Integrated Systems Solution to Air Quality Data and Decision Support on the Web GEO Architecture Implementation Pilot – Phase 2 (AIP-2) Kickoff Workshop.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
Process and mechanics of HFA progress monitoring and Review Sujit Mohanty, UNISDR Meeting of the ISDR Asia Partnership 24 – 26 March 2010 Bangkok.
G-IDAS Richard Engelen.
Welcome to the PRECIS training workshop
Proposed THORPEX/HEPEX Hydrologic Ensemble Project (THEPS) Presentation for 3 rd THORPEX Science Symposium September 14-18, 2009 Prepared by John Schaake,
WRAP Activities Overview §308 Technical Work Outline June 3, 2003.
Key Findings from May & July 2008 WRAP Technical Workshops September 30, 2008 Steve Arnold, Colorado DPHE & Bob Kotchenruther, EPA R10 (Co-Chairs, WRAP.
Module 2 National IEA Process Design and Organization Stakeholder’s consultative workshop/ Training on Integrated assessments methodology ECONOMIC VALUATION.
Copernicus Atmosphere Monitoring Service CAMS General Assembly, Athens, June 2016 Etienne Wey (Transvalor for CAMS-94 User Interaction) What have.
Copernicus Atmosphere Monitoring Service CAMS General Assembly, Athens, June 2016 Thomas Popp (DLR for CAMS-94 User Interaction) Who are CAMS users.
Copernicus Atmosphere Monitoring Service CAMS General Assembly, Athens, June 2016 Vincent-Henri Peuch (ECMWF) CAMS in June 2016.
WMO Polar and High Mountain activities GLOBAL CRYOSPHERE WATCH
Copernicus Atmosphere Monitoring Service
Objectives and Plan of Action
Workshop on MDG Monitoring United Nations Statistics Division
Implementing the New JCOMM Marine Climate Data System (MCDS)
The Integrated Food Security Phase Classification in Sudan –Next Steps
Report on “what are the emerging research needs for CAMS”
GCI Requirements and GEOSS Portal Functionalities
Current and Future State of the IMPROVE Website
Global Coordination Platform
The CAMS Policy products
Nader KEYROUZ-Advisor SDG preparedness workshop
Report of Working Group IV Global Data Dissemination
GCOS Relevant Evolution of the Commission for Climatology
GMES Atmosphere European Commission - GMES Bureau Michael Rohn
Global Coordination Platform
Implementing Country Guidelines for Coordination & Information-Sharing
Establish Process Governance
CRG BoG: Main topics Consistency CCI data
Raimo Vuorinen Senior Researcher, Ph.D.
Evaluation in the GEF and Training Module on Terminal Evaluations
QUALITY ASSURANCE OF MODELS
IPET-OPSLS/CCl-17 relevant issues before EC-70
Laurence Rouïl (INERIS) on behalf of the CAMS_71 team
United Nations Statistics Division
WRAP Regional Haze Grant Status, Technical Project Priorities, & Proposed Technical Analysis Forum Tom Moore WRAP Technical Coordinator Attribution.
The ENDORSE services: any potential for market exploitation?
Joint Planning and Development Office “Where new ideas are welcome”
Item 7 - Roadmap and mandate for the Task Force on UOE Education Expenditure Data Eurostat Education and Training Statistics Working Group - Luxembourg,
2nd Marine Board Forum: towards a European Network of Marine Observatories for monitoring and research Session 2: Projects and Initiatives Alan Edwards.
Expert Group Meeting on SDG Economic Indicators in Africa
Hot summary of the Fourth GSICS Users Workshop
Expected Impact and Results
MSDI training courses feedback MSDIWG10 March 2019 Busan
MOGREPS developments and TIGGE
WORKSHOP “Emerging environmental pollutants: key issues and challenges” Stresa, Italy June 2006.
REAL WORLD CASE STUDY.
Workshop on MDG Monitoring
UNDP Asia Pacific Regional Centre August 2010
My name is VL, I work at the EEA, on EA, and particularly on developing a platform of exchange which aims at facilitating the planning and development.
Report on the EEA workshop dedicated to the use of GMES data for emission inventories John Van Aardenne (EEA), Justin Goodwin (Aether), Peter de Smet.
Projects under Pillar I of White Paper on Climate Change Adaptation
GMES & user involvement
Presentation transcript:

How user feedback and requirements drive service evolution Thomas Popp (DLR for CAMS-94 User Interaction)

CAMS-94 User Interaction Leonor Tarrason, Etienne Wey, Mathilde Marchand, Claire Thomas, Amy Stidworthy, Franziska Schnell, Julian Meyer-Arnek, Thomas Popp

Analysis of user feedback and requirements Based on 10 years experience in PROMOTE GEMS MACC – MACC-III GMES-PURE

Analysis of user feedback and requirements Coming in through Helpdesk personnel communication user workshops questionnaires

Analysis of user feedback and requirements Systematic storage in User Requirement Database Quality control of requirements (ask back) Full traceability to originator Storage of relevant documents behind Assessment of deviation against Service Product Portfolio Assessment of feasibility and priorities

Systematic analysis of user requirements Assess feasibility with CAMS service provider Effort classes minor (few days), small (1 month), medium (few months), large (full study ~1 year), very large (full research project ~several years) Impact classes high + wide (large number of users), high + specific (high power user), medium (several users), little (single occasional user) Potential implementation CAMS evolution, H2020 project, Sentinel requirement Trace analysis and implementation status

Systematic analysis of user requirements User Requirements Database Document + analyse requirements Requirements Analysis Document Requirements analysis per domain, priorities Service Evolution Strategy Long-term (4 years) perspectives: upgrades, extension

10 Years of User Requirements Evolution Implementation group report, before start of MACC Overall scope, general functionalities MACC & MACC-II Documentation, quality information, format, quicklooks/graphics Timeliness, resolution, coverage, forecast range License conditions, access manual, ftp access MACC-II & MACC-III Operational (interface capacity, status information, consistency, web services) Uncertainties, quality flags, validation reports CAMS Systematic analysis to drive service evolution priorities

User queries tracking and analysis Online user queries tracking system supports systematic response User queries tracking and analysis Further user query topics Geographical extension Summer school, MACC-II user workshops Data availability Permission to reproduce / use a graph in media Web portal, RSS feeds Ship emissions Weather model documentation Validation License, cost Forcing by volcanic eruption Aerosol absorption Campaign support Internal website for MACC-II partners Availability of future simulations (2020, 2030) Sentinel products Climatologies Model changes Data access interfaces Information on publication using MACC-II One user worried about the website information that McClear service will stop in July 2014 (MACC-II project end) One national representative to the GMES User Forum enquired about means of involving national communities One user who had signed an SLA requested provision of hourly data One user asked for a recommendation which model should be used for dust (MACC-II or WMO sand and dust storm warning / BSC)

Impact of user feedback on service evolution (MACC) Continuous service improvements for downstream services Increased resolution of global, fire datasets Increased area and forecast length of the regional ensemble Increased ensemble output: species, vertical layers New regional CO2 forecasting service Dedicated campaign support website, policy support website Continuous improvements of documentation and data access Online, extended, operational information, web services Requirements considered for CAMS planning Ensemble operations to support interim assessment reports Specialized user interface tools Seamless transition to MACC-III and (to be assured!) operational phase Solar radiation - Increased interest in radiation forecasts based on CAMS aerosol –> requires reduced delay in forecasting Aerosol deposition needed for soiling of mirrors / photovoltaics

User workshops / sessions Co-organized with national user community Focus on their specific needs Stimulate exchange between users 2 dedicated per annum, 1 at annual assembly 2016 planned Riga (October) Offenbach(November) Your chance to interact