EYETS 2016-2017 David Hay EN-OSS.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Status of the machines over X-mas standby period, services required and plans for rapid start-up OP Group Meeting KH.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Report Technical Director Storage-Ring-Installation Completed
Update on the PSB Cooling and Ventilation Systems
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
YETS & LS2 Works EN-EL / Power distribution
K. Foraz on behalf of OSS members
Status of the BI Work Package in the LIU-PSB frame
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
Framework Schedule from EYETS 2016 to LS2
SPS LS1 Planning meeting (N019) 04/09/13
Update on the Critical Path of the PS Booster Schedule for the EYETS
EYETS Works EN-EL [ FC excluded ]
Brief Status SPS Prototype PSB Prototype Installed in LS1
ELENA installation and commissioning status
K. Foraz on behalf of OSS members
LIU / HL-LHC Cost and Schedule Review
LIU – EVM status and next steps
LIU–PLI report LIU PSB meeting.
EYETS16-17 ACTIVITIES EN-EL-CF
BE-ICS activities for LIU Project
LIU–PLI report LIU SPS meeting.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Status of the BI Work Package in the LIU-PSB frame
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
Dosimeters installation during the EYETS 28/03/17
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
WPs concerned by L4 connection:
SPS activities during LS2 TE-EPC (Power Converter Group)
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
EN-CV interventions during EYETS for PS and PSB
YETS PS + PS SWY + TT2 Facility Coordinator:
EN-HE L2 – PS – PSB – TT2 works during YETS
YETS & LS2 Works EN-EL / Power distribution
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Vers PS YETS PS Booster David HAY & Cyrille BEDEL.
Experimental Areas – LS2 planning
Status of the BI Work Package in the LIU-PSB frame
Linac4 Connection Broken Line 07/08/19
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

EYETS 2016-2017 David Hay EN-OSS

Opening of the machine (weeks) 1470895 2.3 DRAFT Extended Year-End Technical Stop 2016-2017 References: 20 weeks beam to beam stop for CMS Ions run Proton-Lead References [1], [3] and [4] Machines Opening of the machine (weeks) not including the xmas break of 2 weeks Linac2 9.5 PSB 11.5 PS 13.5 SPS 11.5 (BA1,BA2) – 12.5 LHC 15 5 weeks

PS Booster Activities completed Activities in progress BWS False-floor 50% 75% 100% Activities completed Enlargement of the shaft (transport of the BT.BHZ10 magnet) ECR PSB-K-EC-0003 PSB injection BI.BVT power cables & cooling circuit POPS-B 6Kv cabling installation ECR PSB-LJ-EC-0008 Installation of new cable trays in BRF2 and BOR Civil engineering works to repair water seepage in the basement area. Activities in progress De-cabling project (ref Georgi’s presentation) Modifications to the MPS output filter ECR PSB-LJ-EC-0008 LIU & consolidation cabling (ref Georgi’s presentation) Replacement of the RF heat exchanger motors in periods 7 & 10L1 Installation of the distributed optical fibre radiation and temperature sensing (DOFRS) ECR PSB-EIOF-EC-0001 PSB BCER switchboard and containment Installation ECR PSB-LJ-EC-0005 BT.BHZ10 magnet BWS False-floor stabilization Cooling circuits BRF2 Water seepage repairs BR.TMD POPS-B 6Kv cables Shaft 09-Jan-2017 David Hay EN-ACE

Extended Year-End Technical Stop 2016-2017 1470895 3.0 RELEASED Extended Year-End Technical Stop 2016-2017 Machines From beam OFF to Hardware Tests (not including the xmas break of 2 weeks) PSB 12 PS 14 SPS 13 LHC 17 Require temporary powering: BTMS system racks RA776 and 778 in the BOR (20th February wk8) For the DCCTs (BRi.BCTDC9L1) commissioning; racks RA756 and 757 (BOR) repowered from the beginning of week 9 (27th of February wk9). Remise sous tension Racks PSB (6th March) VIC 2 (20th Feb)

EYETS Overview, Marzia Bernardini, LMC 2nd Nov. 2016 PSB EYETS 2016-2017 Machine LIU Renovate electronics for 4 BR.BCTDC (section 9) On track. Now requires power to racks 756-757 (P. Odier) Vers PS Consolidation 4 BRi.BCTI8L1(8L1) On track. Modifs terminated (bg 867) ready to install transformers next week (P. Odier) New ring Trajectory Measurement System (PSB-TMS) On track. Now requires power to racks 776-778 in the BOR (J.Belleman) Remove unused cooling pipes EN-CV Start next week? PSB EYETS 2016-2017 New prototype wire Scanner BWS (4L1) On track. Pump down, small leak detected. New BLMs (FIC detectors) Clamps fitted ECR Needs approval New Tune pick-up BPM (3L1) Postponed. Exchange Septum SMH (15L1) Start week 10 New kicker KSW (16L1) Start week 8 Install upgraded BI.BCT10 transformers On track. Relocate Monitor BTV (BT.BTV30) On track. Enlargement of the shaft DONE EYETS Overview, Marzia Bernardini, LMC 2nd Nov. 2016

ECR’s

Thank You for listening. Q’s