Analyses to Support Waste Disposition of SNS Inner Reflector Plug

Slides:



Advertisements
Similar presentations
SNS Spallation Neutrino Source 1 SNS layout GeV proton linear accelerator Accumulator ring Main target Stripping foil.
Advertisements

Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
HZDR FLUKA activities in support of the MYRRHA Project Short summary with a focus on activation problems Anna Ferrari, Stefan Müller, Jörg Konheiser.
SNS Experimental FacilitiesOak Ridge Target Systems for the Spallation Neutron Source Presented by John R. Haines at the High-Power Targetry for Future.
UNIVERSITA’ DEGLI STUDI DI PALERMO DIN DIPARTIMENTO DI INGEGNERIA NUCLEARE CHERNE th Workshop on European Collaboration for Higher Education and.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
Feasibility of a Small Scale Transmutation Device – Part 1 Conceptual Design only Roger Sit NCHPS Meeting Charlotte, NC October 22-23, 2009.
MARS15 Simulations of the MERIT Mercury Target Experiment Fermilab March 18, Neutrino Factory and Muon Collider Collaboration meeting Sergei.
Calculation of radiation produced by dark current in the Cornell ERL Lisa Nash, University of North Carolina at Chapel Hill Advisor: Val Kostroun.
SHIELDING STUDIES FOR THE MUON COLLIDER TARGET NICHOLAS SOUCHLAS BNL Nov 30, 2010 ‏ 1.
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
Induced Activity Calculations in Support of D&D Activities at SLAC Joachim Vollaire, Radiation Protection Department.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Nuclear and Energy Technologies.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
ISIS Second Target Station
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Study of a new high power spallation target concept
ELI-NP: the way ahead, March Anna Ferrari An overview of the shielding problems around high energy laser-accelerated beams Anna Ferrari Institute.
ISIS Target studies Could a used ISIS target provide fusion relevant irradiated tungsten material properties? Tristan Davenne 20 th May nd Radiate.
Future usage of quasi-infinite depleted uranium target (BURAN) for benchmark studies Pavel Tichý Future usage of quasi-infinite depleted uranium target.
The Proposed Materials Test Station at LANSCE Eric Pitcher Los Alamos National Laboratory Presented at the Workshop on High-Power Targetry for Future.
Simulations on “Energy plus Transmutation” setup, 1.5 GeV Mitja Majerle
JAERI nuclear analyses for IFMIF T. Umetsu, M. Yamauchi and M. Sugimoto Presented by Takeo NISHITANI Japan Atomic Energy Agency (JAEA) IAEA Technical Meeting.
Monte Carlo methods in ADS experiments Study for state exam 2008 Mitja Majerle “Phasotron” and “Energy Plus Transmutation” setups (schematic drawings)
Systematic studies of neutrons produced in the Pb/U assembly irradiated by relativistic protons and deuterons. Vladimír Wagner Nuclear physics institute.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Managed by UT-Battelle for the Department of Energy Residual Does Rate Analyses for the SNS Accelerator Facility I. Popova, J. Galambos HB2008 August 25-29,
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE mars1510 ( DESKTOP ) vs. mars1512 ( PRINCETON CLUSTER ) Nicholas Souchlas, PBL (3/28/2012) 1.
Experimental Studies of Spatial Distributions of Neutrons Produced by Set-ups with Thick Lead Target Irradiated by Relativistic Protons Vladimír Wagner.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Dual Target Design for CLAS12 Omair Alam and Gerard Gilfoyle Department of Physics, University of Richmond Introduction One of the fundamental goals of.
Mitja Majerle for the “Energy Plus Transmutation” collaboration.
Investigating the Feasibility of a Small Scale Transmuter – Part II Roger Sit NCHPS Meeting March 4-5, 2010.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
1 Neutron Effective Dose calculation behind Concrete Shielding of Charge Particle Accelerators with Energy up to 100 MeV V. E Aleinikov, L. G. Beskrovnaja,
Study on the Neutronic Characteristics of Subcritical Reactors Driven by an Accelerated Pulsed Proton Beam Ali Ahmad.
IDS120j WITHOUT RESISTIVE MAGNETS MODIFYING Hg MODULE Nicholas Souchlas, PBL (11/1/2012) 1.
Simulations on “Energy plus Transmutation” setup, 1.5 GeV Mitja Majerle, V Wagner, A Krása, F Křížek This document can be downloaded.
IDS120j WITH AND WITHOUT RESISTIVE MAGNETS PION AND MUON STUDIES WITHIN TAPER REGION, III ( 20 cm GAPS BETWEEN CRYOSTATS ) Nicholas Souchlas, PBL (9/4/2012)
Summary of radiation shielding studies for MTA Muon production at the MiniBooNE target Igor Rakhno August 24, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop R. Casey Activation Issues for NSLS-II March 28, 2007.
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BP#2 WITHIN FIRST CRYOSTAT AND RIGHT FLANGE OF Hg POOL INNER VESSEL ( 20 cm GAPS AND 15.8 g/cc.
Spallation Eric Pitcher Head of Target Division February 19, 2016.
Ma zhongjian Ding yadong Wang qingbin Wu qingbiao Radiation Protection Group/IHEP.
HEBT Design Considerations Jingyu Tang, Xiangqi Wang, Hao Hao, Jiajia Tian IHEP, USTC International Review Meeting on Accelerator Physics Design of C-ADS,
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Neutron double differential distributions, dose rates and specific activities from accelerator components irradiated by 50 – 400 MeV protons F. Cerutti.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Radiation protection studies for the ESS Activation issues AD seminar Michał Jarosz , Lund.
The ESS Target Station F. Mezei ESS target division NPPatLPS, 2013.
Monte Carlo methods in spallation experiments Defense of the phD thesis Mitja Majerle “Phasotron” and “Energy Plus Transmutation” setups (schematic drawings)
Background simulations: update and simulations of absorbed dose
Heating and radiological
Study on Neutronics of plutonium and Minor Actinides Transmutation in Accelerator Driven System Reactor By Amer Ahmed Abdullah Al-Qaaod Ph.D student Physics.
Making Difficult Decisions in a Transparent Way –
Induced-activity experiment:
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
for collaboration “Energy plus transmutation”
Neutronics Studies for the Nab Experiment
Guidance for hands-on exercise Neutron target
Ryuji Hosoyamada2, Hiroshi Iwase3, Hiroshi Nakashima1, and Koji Niita2
JOINT INSTITUTE FOR NUCLEAR RESEARCH
Higgs Factory Backgrounds
Performed experiments Nuclotron – set up ENERGY PLUS TRANSMUTATION
APTM and GRID interface requirement PBIP and PBW
Background Simulations at Fermilab
TRANSPORTATION CASK AND CONCRETE MODULE DESIGN FOR MANAGING NUCLEAR SPENT FUEL PRODUCED IN BUSHEHR NUCLEAR POWER PLANT A.M. TAHERIAN Iran Radioactive Waste.
Presentation transcript:

Analyses to Support Waste Disposition of SNS Inner Reflector Plug SATIF-13 October 10-13, 2012, Helmholtz-Zentrum Dresden-Rossendorf, Dresden, Germany Analyses to Support Waste Disposition of SNS Inner Reflector Plug I. Popova, F. X. Gallmeier, S. Trotter, M. Dayton

SNS layout The Spallation Neutron Source in Oak Ridge, Tennessee, is an accelerator driven neutron scattering facility for materials research SNS operates presently at up to 1.4 Megawatt (MW) proton beam power incident on a mercury target Target building is designed to house 24 instruments Presently 19 instruments are operating 10 years beam on target Proton beam power on target 1.4 MW Proton beam kinetic energy on target 1.0 GeV Average beam current on target mA Pulse repetition rate 60 Hz Protons per pulse on target 1.5x1014 protons Charge per pulse on target 24 ˜C Energy per pulse on target kJ Proton pulse length on target 695 ns

Introduction According to the SNS operations plan Target System components are replaced: To avoid excessive degradation of components materials – target vessels and proton beam windows; When beam line optical components are ready to be installed Core Vessel Insert (CVI) plugs are extracted; When reach planned end-of-life – Inner Reflector Plug (IRP). Components must be: Safely removed; Placed in containers for storage on site in order to cool down; Placed into shipping container packages to transport off-site.

Introduction Inner Reflector Plug (IRP) is a central component of the SNS target monolith that is exposed to high-level radiation fields Builds up significant activity IRP needs to be replaced due to damage of structural materials caused by high particle fluxes, which reflects in the moderator poisoning Life-time of IRP was assumed to be about 40,000MWh IRP will be extracted from the target monolith and segmented into three components, each which will be disposed separately Scheduled for replacement in March, 2017

Introduction Upper Segment is pulled into cask

Introduction Neutronics analyses for IRP deposition are performed to: Predict isotope composition for spent structures to support waste characterization and transportation analyses; Predict dose rates after cool down; Ensure choice of proper shipping container/package; Develop shielding for container/package; Perform transport analyses with real irradiation history for chosen container/package Analyses are performed for each segment

Methods and Codes Reaction rates and neutron fluxes below 20 MeV are calculated using MCNPX Calculated results are fed into an Activation Script that provides the interface between MCNPX and the transmutation code CINDER’90 The isotope inventory is obtained for the date of provisional transport of the package, if component has few materials ALLCODE is applied Photon spectra are extracted by the GAMMA_SPECTRA script from the transmutation analyses output and formatted into a source description for MCNPX Dose rates are calculated in the package vicinity using MCNPX Report is generated

Methods and Codes The latest 3D as-built target station and proton beam window model in MCNPX language are used Effective dose rates are obtained by folding fluxes with flux-to- dose conversion coefficients, which are taken from standardized neutron and gamma flux-to-dose conversion coefficient libraries for the SNS 2D mesh-tallies were defined in the vertical and horizontal planes Surface tallies were set at requested key locations For waste classification purposes a report containing isotope inventory, dose rates at specified locations is generated

Waste characterization Report for waste management contains: History of irradiation; Radionuclide inventory; Time line of component activity after beam termination; Gamma dose rate contour plots; Predicted dose rates at locations required by the U.S. Department of Transportation (DOT); Distances from the side and the bottom of the spent component package for which the dose rates fall below 100 mrem/hr and 5 mrem/hr

Geometry Large component - the IRP is cylindrical and about about 39” (100- cm) in diameter Split into three segments, each segment will be disposed separately

Geometry The SNS as-built target station model Target module Cylindrical IRP, including beryllium and steel reflectors and moderators Cylindrical outer plug, and the proton beam window assembly

Analyses Analyses are performed for 40,443MWh distributed over 11 years of operation Isotope inventories are presented for up to one year of cooling down Dose rates are calculated for 100, 182 and 365 cool down for the top and for the middle segments Dose rates are calculated for 100 days for the lower segment

IRP top segment Material is stainless steel 316 MCNPX model

IRP top segment

IRP middle segment Material is stainless steel 316 MCNPX model

IRP middle segment

IRP lower segment Material is stainless steel 316

IRP lower segment Beryllium reflector Stainless steel reflector Aluminum enclosure Four moderators Aluminum Cadmium Gadolinium Stainless steel piping Stainless steel shielding Moderators Moderators Shielding Aluminum enclosure Beryllium reflector Stainless steel reflector

IRP lower segment The most irradiated segment Complex geometry Over 700 cells Transformations For residual analyses Small cells with insignificant distribution were omitted Due to limitation in the MCNPX source description, two decay gamma sources were prepared Two transport simulations were performed Results from the analyses were combined

IRP lower segment

Conclusions An accurate estimate of the radionuclide inventory and the dose rates associated with radiation fields of the spent IRP were performed Awaiting characterization and classification of each segment and to determine the appropriate storage and transport package. Radiation fields at 30-cm from IRP lower segment after 100 days cool down are above 1000Rem/h.