Update on the SVD construction

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Kodali Kameswara Rao TIFR, Mumbai
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
1 Beam pipe and VXD mockup status at KEK S.Tanaka (KEK) SVD/PXD meeting.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
Dec
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
The Belle II Silicon Vertex Detector assembly and mechanics
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Comments on ladder structure 5 Feb Toru Tsuboyama.
SVD assembly S.Tanaka. Outline SVD assembly work is individual with Beam pipe, heavy metal shield and PXD system. –Assembly work will be done on two assembly.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
,C. Kiesling, 10th BPAC Meeting, KEK, Japan, Feb. 7-9, VXD Commissioning Organizational Matters (in response to the BPAC October report) Overall.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
1 Class-X BW/FW Subassemblies S. Bettarini for the Pisa Belle2-SVD group SVD Parallel Session VXD-Workshop Praga, 22 nd January 2015 OUTLINE Status/numbers.
SVD IR mechanics status S.Tanaka SVD mechanics session.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
QCG Report Francesco Forti University and INFN, Pisa.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
Status & schedule of ladder parts production Oct. 2, 2014 Koji Hara (KEK)
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
8 September 2011 Belle II SVD/PXD Installation Procedure Mockup Meeting Munich Immanuel Gfall (HEPHY Vienna)
Florian Buchsteiner (HEPHY Vienna)
L.Vitale INFN and Univ. Trieste
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
SVD Electronics Constraints
SVD Overview Christoph Schwanda Institute of High Energy Physics Austrian Academy of Sciences 8th Belle II VXD Workshop September 9-11, 2015 Trieste, ITALY.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Status of the CO2 Cooling Project
Discussion items SVD mechanics session.
Report on WP2 Activities
Very preliminary draft
Katsuro Nakamura Sep. 10, 2015 VXD meeting
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
The Silicon Vertex Detector of the Belle-II Experiment
SVD Mechanics Group Organization & Work packages
Comments to the SVD4 structure
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
SVD group organization, schedule, milestones
Presentation transcript:

Update on the SVD construction Ladders End rings Carbon fiber (CF) cone End flange PXD (independent sub-detector inside SVD) Outer CF shell Beam pipe S. Bettarini on behalf of the SVD-Group 7th Belle II Italian Coll. Meeting, 05/05/2017 Trieste

Outline Layer 4,5,6 Ladder production status FW modules: (PF1) peel-off issue Layer3 cooling improvement SVD Ladder mount: Cooling-pipes mounting Fibers insertions (see LL) A look at the activities in 2018: Commissioning; Integration SVD/PXD; Cosmics run

SVD ladders L6 Ladder (Kavli IPMU) FWD 47 FWD + 47 BWD L5 Ladder BWD Layer Ladders (spares) DSSDs / ladder 6 16 (4) 5 12 (3) 4 10 (2) 3 7 (2) 2 SVD ladders L6 Ladder (Kavli IPMU) FWD module FWD Origami +z 47 FWD + 47 BWD L5 Ladder (HEPHY) Origami ce BWD Origami -z L4 Ladder (TIFR) BWD module L3 Ladder (Melbourne) Cooling pipe FWD module (Pisa) Cooling pipe BWD module (Pisa) Cooling pipe

SVD Ladder Construction (I) In 2016 Pisa completed the production of the needed 47 BW + 47 FW subassemblies. Prod. Line kept active in 2017: To feed the ladder assembly sites with the spare subassemblies needed for replacement in case of failures So far built extra +1 BW and +7 FW (Class B det’s!) A production of extra +4 BW needed before July Origami production issue totally overcome: a sufficient number of tested class A origami circuits is now in our hand for ladder assembly. Layer 6 assembly is on the critical path in the schedule. The L6 team (reinforced by an expert from Pisa) has implemented a shift system to use the assembly line at IPMU most efficiently: 1 ladder/21 days; in this way the global schedule (ladder mount) is matched but with very limited contingency. FADC readout system FADC v3 has performed well at the test-beam in DESY in April 2016 There are delays in v4 preparation

SVD Ladder Construction (II) Layer-3 : already completed the production with spares Layer-4 : Layer-5 : Layer-6 :

Unexpected failure after reinforcement! Last week a L4 ladder experienced a PF1 peel off, developed 6 days after the half ladder assembly! The failure mode indicates a glue adhesion problem, and just adding more glue is not enough. Proposed a change in the assembly procedures: the SFW glued is left on the ribs for about a week before proceeding with the ladder assembly. The whole SVD group is at work to find a definitive solution.

SVD Milestones Item/Operation Updated in April 2017 Completion L4 production (10+2) Oct 2017 Completion L5 production (12+3) Sep 2017 Completion L6 (enough for the 1st shell) Dec 2017 Completion L6 production (16+4) Mar 2018 Ladder mount (1st half shell) Aug 2017- mid. Dec 2017 Ladder mount (2nd half shell) mid. Dec 2017 – mid. April 2018 SVD ready for integration with PXD End of April 2018 The SVD Group produced a detailed Gant Schedule that is monthly updated taking into account the delay caused by the most important issues met along the path… For instance … FWD end-ring re-production (QA failure at the Welcon) A scratch on the component (overlooked during the production) caused a leak in the cooling circuit.

L3 cooling improvement (Melbourne) Operation of the thermal mockup @ DESY indicated that the cooling of the APV chips on the L3 hybrids is marginal. p-side APV chips in the FWD are ~70 °C above the coolant temperature, mainly due to the large temperature drop on the stainless steel FWD end-ring finger (45 °C) L3 cooling is reinforced by adding copper inserts on the L3 fingers both in the FWD and in the BWD (Tmax decreases by ~30 °C) Copper Insert Setup in Melbourne Stress relief Vacuum Endring support Gluing jig Gluing support Gluing station The gluing of the copper inserts is foreseen before the June B2GM

Ladder Mount Ladder pick-up and mounting FOS fiber insertion (TS) Cooling pipe positioning (PI)

Cooling-pipe mounting (Pisa responsibility) In the reharsal of Febr. We decided to modify the L4-pipe routing to allow its easy mounting. It has been important to have at home a mock-up of the mounting table where to test the mechanical tools and the procedures: The next step is just the next week when the pipe-mounting for the Layer4-5-6 and the L3-cover will be tested: work to be done with the Trieste group to test also the fiber insertion. The last dressed reharsal of the complete ladder mounting procedure scheduled before the June B2GM

Main SVD Activities in 2018 The activities on beast2 (see LL’s talk) are also a useful exercise in preparation for the final SVD commissioning …, including the challenge of the tracking (ROI,...) on the SVD cartridge (Jan 2018) 2nd half SVD Ladder mount (first 4 months) SVD Commissioning, not yet completely defined in details, but foreseen: SVD standalone Cosmics data Integration with PXD Combined SVD/PXD Cosmics Installation VXD in Belle2 Cosmic Run before the Physics Run A lot of exciting work @ KEK! Good opportunity for young people (free of teaching constraints) who gained expertise during the SVD module construction ...